Allied Pile Driving, Inc. is a contractor providing deep foundation pile solutions and shoring systems. Our specialty is all types of driven piles for building foundations as well as driven earth support systems to support excavations.

Updates

50 Liberty
- Apr 12, 2018


Construction Complete at 50 Liberty

Construction of the luxury condo building on  Fan Pier is now complete. 50 Liberty features breathtaking views of Boston Harbor and the Downtown Boston skyline. Residents are situated at the heart of Boston's most innovative neighborhood, the Seaport District, steps to multiple dining and entertainment options. Residential amenities include top luxury finishes, floor-to-ceiling glass window walls, warm wood floors and high ceilings throughout. Building amenities will include a private waterfront club room, a boardroom for meetings, a private gym, 24-hour concierge service and underground garage parking. Luxury condominiums at 50 Liberty are now on sale. 

Visit 50Liberty.com for more information.



AVA North Point
- Feb 26, 2018

Finishing touches underway at AVA North Point luxury apartments in East Cambridge, built by Callahan Construction Managers


The exterior facade of AVA North Point, a new six-story, wood framed, 265-unit luxury apartment community, has been completed. The complex, developed by AvalonBay Communities and built by Callahan Construction Managers, is set to open this summer. In addition to the façade completion, finishes are currently being installed within apartments that include granite countertops, stainless steel appliances, hard surface flooring and in-unit washers and dryers. Common spaces, including lounges, a fitness center, landscaped elevated courtyards and a swimming pool are also being fit out.


AVA North Point will feature studio, one-, two- and three-bedroom apartments, efficiently designed to LEED Silver sustainability specifications. The community will also include a 3,000-square-foot ground-floor retail space and three levels of underground parking. AVA North Point is located steps from the Lechmere MBTA Green Line station, Kendall Square and the 45-acre, 4.5-million-square-foot Cambridge Crossing development, soon to be home to the North American headquarters of global healthcare technology leader Philips. The following is a photograph of AVA North Point:



50 Liberty
- Jun 19, 2017

Facade complete at 50 Liberty waterfront luxury condos in Seaport District, interior fit out underway


The 14-story glass-and-marble facade of the 50 Liberty luxury waterfront condominium residences in the Seaport District is complete, with all floor-to-ceiling glass curtain wall panels, marble exterior finish panels and private balconies installed. Interior fit out of 50 Liberty’s 120 luxury residences is now underway in anticipation of the building’s opening in Early 2018; luxury residences at 50 Liberty are now on sale. Finishing of 50 Liberty’s interior common spaces, which include desirable amenities such as a private waterfront club room, a board room for meetings and a private gym, is also underway. On 50 Liberty’s ground floor will be 30,000 square feet of civic, cultural and retail space along a new waterfront boardwalk. The following are photographs of 50 Liberty:


50 Liberty Photos


AVA North Point
- Mar 30, 2017

Wood superstructure framing underway at Avalon NorthPoint Phase Two in Cambridge


Construction of wood superstructure framing is well underway at Avalon NorthPoint Phase Two, a new mixed-use building located across from the Lechmere MBTA Green Line station, and will soon reach its’ full height of six stories. The first section of Avalon NorthPoint Phase Two’s post tensioned concrete podium structure, which will house the building’s ground floor lobby and retail space and is serving as the wood framing’s base, is complete. Underneath Avalon NorthPoint Phase Two are three completed levels of below-grade parking. Upon completion, Avalon NorthPoint Phase Two will feature 285 apartment residences with approximately 3,000 square feet of ground-floor retail. The following are photographs of Avalon NorthPoint Phase Two:


Avalon NorthPoint Phase Two Photos


50 Liberty
- Mar 08, 2017

Facade nearing completion at 50 Liberty luxury condominiums in Seaport District


Marble exterior finish panels and floor-to-ceiling windows have been installed along a large section of 50 Liberty's 14-story facade, ranging from 6 stories high facing Boston Harbor to 8 stories high along Liberty Drive. Opening in Fall 2017, 50 Liberty will feature 120 luxurious waterfront condominium residences with 30,000 square feet of civic, cultural and retail space. The following are photographs of 50 Liberty:


50 Liberty Photos


50 Liberty
- Jan 30, 2017

50 Liberty waterfront condominium exterior finish installation underway


Marble exterior finish panels and floor-to-ceiling windows are now being installed along the first floors of the Seaport District's new 14-story 50 Liberty waterfront luxury condominium and retail building. The building's mechanical penthouse has been constructed and now houses HVAC units. Concrete has been poured to construct 50 Liberty's interior floors. Opening in Fall 2017, 50 Liberty will feature 120 luxurious waterfront condominium residences with 30,000 square feet of civic, cultural and retail space. The following are photographs of 50 Liberty:


50 Liberty Photos


50 Liberty
- Dec 14, 2016

50 Liberty condos hit market, new details and renderings revealed


The Fallon Company has listed several waterfront luxury condominiums at 50 Liberty in the Seaport District for sale. Condominiums listed range from a 1,297 square foot one-bedroom/two-bathroom unit with one garage parking space offered for $1,848,995 to a 3,573 square foot three-bedroom/three-bathroom penthouse unit with two garage parking spaces offered for $9,100,225. The latest details and renderings of 50 Liberty can be found above.


50 Liberty
- Dec 01, 2016

50 Liberty tops off


A topping-off ceremony was held Tuesday (November 29th, 2016) afternoon for 50 Liberty, a new 14-story mixed-use building opening Fall 2017 on the Seaport District waterfront. During the ceremony, the final steel beam of 50 Liberty’s structural frame was lifted to the frame’s top and installed in place. Work is now underway on exterior and interior finishing of 50 Liberty. Concrete floor slabs have been poured on over half of 50 Liberty’s floors. The following are photographs from 50 Liberty's topping-off:



50 Liberty
- Nov 23, 2016

50 Liberty about to top off


50 Liberty, a 120-unit luxury condominium building located in the Seaport District overlooking Boston Harbor, is about to top off at 14 stories tall. Concrete has been poured on about half of of the building’s floors. At 50 Liberty’s base, finish installation systems are being installed in order to commence installation of exterior finish panels and windows. Pre-sales of 50 Liberty luxury condominiums will commence shortly. The following are photographs of 50 Liberty:


50 Liberty Photos


AVA North Point
- Oct 19, 2016

J. Derenzo Companies excavates Avalon NorthPoint Phase Two foundation


J. Derenzo Companies has excavated Avalon NorthPoint Phase Two’s three-level underground parking garage. Concrete is now being poured to construct the building’s foundation and the garage. The following is an Instagram photograph by Feldman Land Surveyors of the Avalon NorthPoint Phase Two construction site:


14714450_204847789924579_3916809577504440320_n

Northpoint II, setting column line control for the concrete sub. #landsurveyors #surveylife #linecontrol #construction

A photo posted by Feldman Land Surveyors (@feldmanboston) on Oct 17, 2016 at 8:06am PDT


50 Liberty
- Oct 14, 2016

50 Liberty nears topping off


50 Liberty’s 14-story steel structural frame has reached nine stories in height. Balconies for future condominiums have been installed along 50 Liberty’s facade. Concrete pouring is underway on 50 Liberty’s first and second stories. A construction elevator is being assembled along 50 Liberty’s frame; the elevator will be used to transport materials and finishes throughout construction. 50 Liberty will feature 120 luxurious waterfront residential condominiums with sweeping views of Boston Harbor and the Boston skyline. The following are photographs of 50 Liberty:


50 Liberty Photos


AVA North Point
- Aug 26, 2016

Excavation and foundation work underway at Avalon NorthPoint Phase Two


J. Derenzo Companies has nearly fully excavated the underground parking structure of Avalon NorthPoint Phase Two, a six-story residential building located steps away from the Lechmere rapid transit station. A total of three levels of underground parking will be excavated. Sheet pile walls reinforced by horizontally-mounted large diameter round steel beams are being used to support the excavated garage. A reinforced concrete foundation is being poured vertically along the garage’s perimeter to support the building’s substructure. Approximately 285 residential rental apartments and 3,000 square feet of retail space will be constructed at Avalon NorthPoint Phase Two. The following are photographs of Avalon NorthPoint Phase Two:


Avalon NorthPoint Phase Two


AVA North Point
- May 15, 2016

J. Derenzo Companies breaks ground on NorthPoint’s next residential development


J. Derenzo Companies has broken ground on Phase Two of the Avalon NorthPoint residential development project and is excavating the project’s foundation and underground parking structure. Two new buildings will be built as part of Avalon NorthPoint Phase Two containing approximately 285 residential units and 3,000 square feet of ground-floor retail.


J. Derenzo Companies excavates Avalon NorthPoint Phase Two's foundation and underground parking structure


J. Derenzo Companies excavators at Avalon NorthPoint Phase Two

Excavation at Avalon NorthPoint Phase Two


Driving of sheet piles is underway along the foundation to construct the sheet pile wall. The wall will reinforce Avalon NorthPoint Phase Two’s foundation and three-level underground parking structure.


Sheet piles being driven along Avalon NorthPoint Phase Two's foundation


Allied Pile Driving, Inc. driving sheet piles at Avalon NorthPoint Phase Two


Sheet piles driven at Avalon NorthPoint Phase Two


Driving of sheet piles underway at Avalon NorthPoint Phase Two


NorthPoint master developer DivcoWest acquired the 42-acre master-planned NorthPoint site for $300 million in August 2015. Upon completion, NorthPoint will contain a mix of residential and commercial uses located near Downtown Boston and Kendall Square. A new 355-unit residential apartment tower at NorthPoint, Twenty|20, opened in summer 2015.


Locus map of NorthPoint site


Avalon NorthPoint Phase Two is being developed in partnership with AvalonBay Communities and The McKinnon Company. AvalonBay Communities is building a 38-story mixed-use tower, Avalon North Station, across the Charles River from NorthPoint. Avalon NorthPoint Phase Two is located across from both the existing Lechmere rapid transit station and the new relocated Lechmere station planned as part of the Green Line Extension project.


Rendering of future Lechmere station with Avalon North Point (white buildings) and the NorthPoint site in the background


More information about Avalon NorthPoint Phase Two is posted below.


50 Liberty
- Mar 04, 2016

Construction of 50 Liberty's slurry wall foundation is nearly complete. Final excavations are taking place, and concrete for the mat foundation is beginning to be poured. We are excited to watch 50 Liberty's frame begin to rise! New photographs of 50 Liberty are posted above.


50 Liberty
- Feb 03, 2016

With pile driving completed, foundation work is moving forward at 50 Liberty in Boston's Seaport District! A. A. Will Corporation is hard at work digging 50 Liberty's future foundation and underground parking structure. We can't wait to watch the impending concrete pour!


   
   
   

January 15, 2016

Pile driving is complete at 50 Liberty, and excavation of the building's slurry wall foundation is beginning.

   
   


50 Liberty
- Dec 16, 2015

Pile driving progressing in earnest at 50 Liberty!


   
   
   


Thought Leadership

No new thoughts. Inquire about becoming a thought leader by clicking here

Headquarters

To unlock, this organization must be verified.

Please click here to verify >>