Default organization

Totals

Total Square Footage 2150000
Total Dollar Volume $ 175,000,000

General

Established 1939
Employees
Website Please click here to verify >>

Description

Bay Crane Service Inc. was founded in 1939 to meet the needs of lifting requirements in New York. We have grown steadily since then and have become a leader in this area. Today we are a world class company with a fleet of equipment, superior staff and a recognized reputation for excellence in the industry.

We are a family owned, financially stable organization possessing profound dedication and pride in our work. Our 24/7 commitment to our clients and employees is vital in this business. We offer the "best of what is available" in equipment, personnel, management, and support staff to meet our client's unique requirements. Our focus and our mission is to meet the needs of the congested and highly regulated New York market.

Updates

Boston Landing
- Mar 08, 2018

Bose beginning tenant fit-out of newly leased space at Boston Landing. Consisting of 98,000 square footage on levels 7-8-9 & 10 in the building,  new lighting and lighting control is being completed. Installation of new electric rooms on each level and new general purpose power wiring.  All heating and cooling equipment is already in place.


Pierce Boston
- Mar 01, 2018

Pierce Boston, one of Massachusetts’ tallest residential towers, officially opens to residents


Pierce Boston, a 30-story, 378-foot-tall tower that is Massachusetts’ tallest tower west of the Back Bay, officially opened to residents today. The tower, featuring an angular profile clad in glass, is located at the gateway to Boston and is now prominently visible from the Massachusetts Turnpike and other key points. Pierce Boston features 109 condominium residences, 240 apartment residences and over 20,000 square feet of dining and retail space across its’ first two floors. The tower is located in the heart of the growing, active Fenway neighborhood, and features sweeping views of the surrounding cityscape and countryside. “Pierce Boston’s residents are going to love living in The Fenway,” said Jed Lowry, Vice President at Pierce Boston co-developer Landsea, in a prepared statement. “So much is happening in The Fenway, and Pierce Boston is the perfect home base, with everything you need to enjoy an active, urban lifestyle in one of Boston’s best neighborhoods.”


Apartments are located up to floor 18, and condominiums are located on floors 19 through 29 underneath the 30th floor Levity Lounge, a space exclusive to condominium owners that will include a private dining room, a library, expansive outdoor and indoor seating areas, private sky cabanas for purchase and a sky top pool. Nathálie, a wine bar by the team behind Downtown Crossing’s Haley.Henry, will open on Pierce Boston’s ground floor this Summer. As of the end of 2017, 70% of Pierce Boston condominiums have been sold, and 20% of apartments have been leased.


Pierce Boston
- Jan 30, 2018

Wine bar opening at Fenway’s new Pierce Boston luxury tower


The proponents of Downtown Crossing’s haley.henry wine bar, located on the ground floor of the 45 Province condominium tower, will open a second wine bar dubbed nathálie on the ground floor of the new 30-story Pierce Boston, the Fenway neighborhood’s tallest tower. Between 50 and 60 wines will be served at nathálie, emphasizing female wine producers and old world varieties, per Eater Boston. Fit out of the 1,200-square-foot space, which will also include a 200-square-foot outdoor patio, is expected to commence in March. nathálie is expected to open this Summer, and will feature a variety of seating options including a bar, high-tops along windows, a lounge area and banquette seating.


“Where haley.henry is a very masculine, tinned fish/wine bar, nathálie will be the dynamic, invigorating daughter that brings a whole new twist to Fenway,” said haley.henry and nathálie owner Haley Fortier in a prepared statement. “We are very much looking forward to establishing some amazing relationships by providing a unique wine bar experience for this part of the city.” Pierce Boston is set to open in February, and features residences including 109 condominiums and 240 apartments as well as 30,000 square feet of exclusive retail across the first two floors. At the top of the tower is a Levity Lounge exclusive to condominium owners, which includes the highest situated outdoor pool in the City of Boston.


Pierce Boston
- Dec 24, 2017

Pierce Boston nears February 2018 opening, finishing touches underway


Finishing touches to the interior and exterior of Pierce Boston, the new 30-story luxury tower located at the gateway to the booming Fenway neighborhood, are underway in advance of the tower’s scheduled opening in just over a month. The tower’s striking glass facade is essentially complete, and luxurious finishes have been almost fully installed throughout apartments, condominiums and amenity spaces. Pierce Boston features 109 condominiums and 240 apartments available for sale and lease, respectively. Apartments are located across floors three through 18 of Pierce Boston, and condominiums are located across floors 19 through 29. The tower’s 30th floor features a Levity Lounge exclusive to condominium owners featuring a library, a fitness center, a private dining room and the highest situated outdoor pool in the City of Boston. Across the tower’s first two floors will be 30,000 square feet of exclusive retail. The following are photographs of Pierce Boston:


Pierce Boston Photos


Pierce Boston
- Sep 28, 2017

Pierce Boston condos in Fenway 60%-sold, apartment rents revealed


The 30-story Pierce Boston mixed-use tower’s 109 condominiums are 60%-sold, and leasing of the tower’s 240 apartments has now begun in advance of Pierce Boston’s opening in early 2018. Rents for studio apartments start at over $2,900 per month, one-bedrooms start at over $3,000 per month, two-bedrooms start at $4,600 per month and three-bedrooms start at over $7,000 per month. Apartments are located across floors three through 18 of Pierce Boston, and condominiums are located across floors 19 through 29. On Pierce Boston’s 30th floor is a Levity Lounge featuring a pool, a library, a fitness center and a private dining room exclusive to condominium owners. Across the tower’s first two floors will be 30,000 square feet of exclusive retail.


Pierce Boston
- Jul 09, 2017

JM Electrical installs top-notch HVAC control system at Pierce Boston, Fenway’s tallest tower


Interior finishing at Pierce Boston, the Fenway neighborhood’s tallest tower, is well underway, with luxurious finishes taking shape in the 30-story tower’s apartments, condominiums and exclusive amenity spaces, and JM Electrical hard at work installing a state-of-the-art HVAC control system that will enable advanced climate control in all residences and common spaces. JM Electrical’s HVAC system will maintain precise temperature and humidity levels throughout Pierce Boston, ensuring residents of the building’s luxurious homes will be able to uphold ideal climate conditions as well as optimizing the building’s ventilation and energy-efficiency.


Pierce Boston’s gleaming floor-to-ceiling glass curtain wall facade is just about complete, and the focus of construction has turned to plastering and finishing residences, common spaces and the building’s top-floor Levity Lounge, an exclusive condominium owners’ amenity space featuring private dining, a library, expansive outdoor and indoor seating areas with unprecedented views, a pool deck and private sky cabanas for purchase. Located at the gateway to the Fenway neighborhood, Pierce Boston will feature 109 condominium residences on upper floors, 240 apartment residences at the building’s center and two stories of street-level retail totaling 20,000 square feet. Pierce Boston is expected to open in early 2018. The following are photographs of Pierce Boston:


Pierce Boston Photos


Pierce Boston
- Mar 23, 2017

Pierce Boston curtain wall nears completion, luxury condominiums now on sale


Unitized glass curtain wall panels have reached the 21st level of Pierce Boston, an exceptional new 30-story luxury tower in the Fenway. With an unparalleled vantage point as the Fenway’s gateway structure and tallest tower, Pierce Boston offers unparalleled views of the Boston skyline, the Charles River, the Emerald Necklace and the surrounding countryside.


Levels 21 through 30 of Pierce Boston are actively being prepared for curtain wall panel installation. Metal panel anchors, which are used to fasten curtain wall panels, have been installed as high as Level 26. Inside Pierce Boston, metal stud walls continue to be framed to construct individual residences, and plumbing, electrical and HVAC systems continue to be installed. A pool that will become part of Pierce Boston’s exclusive top-floor Levity Lounge was recently lifted from ground level to the tower’s 30th floor. The pool has been carefully placed into the Lounge’s future pool deck. A video of the intricate pool installation process is posted below.


Pierce Boston’s 109 distinctive luxury condominium residences, located on levels 19 through 29, are now on sale. These residences will feature breathtaking panoramic views and state-of-the-art finishes. At Pierce Boston’s summit will be the Levity Lounge, an exclusive amenity space featuring private dining, a library, expansive outdoor and indoor seating areas with unprecedented views, a pool deck and private sky cabanas for purchase.


For more information about Pierce Boston and to schedule a private showing, visit the Pierce Boston website or click Contact Broker above. Pierce Boston is on track to be completed within the next year. The following are photographs of Pierce Boston:


Pierce Boston Photos


The following is the pool installation video:



Pierce Boston
- Jan 26, 2017

Curtain wall and interior fit out underway at Pierce Boston, condos now available


Exterior and interior finishing are well underway at the recently topped-out, 30-story luxury tower Pierce Boston. This architectural standout, designed by Arquitectonica, will serve as the gateway into the Fenway neighborhood. Pierce Boston will take its' place in the Boston skyline as the neighborhood's tallest luxury residential tower, offering a unique vantage point of the city and its' landmarks.


Unitized glass curtain wall panels are rising rapidly along Pierce Boston's façade and have already reached the 16th floor. Inside, metal stud walls are being framed to construct individual units on Pierce Boston’s lower floors (1-18). These levels, beautifully designed by CBT Architects, will house 20,000 square feet of retail, impressive amenity spaces and 240 residential apartments. All floors of Pierce Boston are now being outfitted with plumbing, electrical and HVAC systems.


Pierce Boston’s 109 condominiums, located on floors 19-29, are now on sale and have breathtaking 360-degree uninterrupted views of the city, the Charles River, the Emerald Necklace and the Longwood Medical Area. Unique to new development in the city is Pierce Boston's condominiums' top floor amenity space, the Levity Lounge, featuring private dining, a library, expansive outdoor and indoor seating areas with unprecedented views, a pool deck and private sky cabanas for purchase.


For more details and to schedule a private showing, visit the Pierce Boston website or click Contact Broker above. Pierce Boston is on track to be completed within the next year. The following are photographs of Pierce Boston:


Exterior
Pierce Boston Exterior


Views
Pierce Boston Views


Interior
Pierce Boston Interior


Pierce Boston
- Dec 04, 2016

Pierce Boston tops off


A topping-off ceremony was held last Friday (December 2nd, 2016) for Pierce Boston, a 30-story mixed-use tower opening Winter 2018 in the Fenway. Concrete construction at Pierce Boston is now complete, with concrete poured on all floors. Pierce Boston will soon be weather tight; glass has been installed on over 10 stories, giving Pierce Boston a striking presence. HVAC construction at Pierce Boston including electrical, mechanical and plumbing utilities is well underway. Interior framing of Pierce Boston’s units and common spaces has also begun. The following are photographs from the Pierce Boston groundbreaking:





Pierce Boston
- Nov 03, 2016

Pierce Boston nears topping off, condos listed for sale


Pierce Boston has risen to nearly its’ full height, currently standing at about 28 stories tall. Pierce Boston will be a 30-story mixed-use tower. Glass has been installed along the first five stories of Pierce Boston’s facade.


Condominiums are now on sale at Pierce Boston. A 22nd Floor one-bedroom is listed for $924,500, and a 19th Floor three-bedroom is listed for $2,913,700. New interior renderings of Pierce Boston have been revealed, including renderings of units; these can be found above. The following is a Tweet by Boston Tweet showing Pierce Boston:



Pierce Boston
- Oct 21, 2016

New Pierce Boston details revealed


New details and renderings have been released of Pierce Boston's penthouse suites and amenities. A total of 10 penthouses will be located at Pierce Boston enhanced with top-of-the-line appliances and finishes. The 30th-story Levity Lounge will feature a Dining Room atop a glass floor, a library well-suited for intimate gatherings and floor-to-ceiling windows offering sweeping views. Premium services at Pierce Boston will include in-house car detailing. Visit the Penthouse and Amenities pages on the Pierce Boston website for more information. The following are new renderings of Pierce Boston:


Pierce Boston New


Pierce Boston
- Oct 05, 2016

Pierce Boston over halfway to topping off


Pierce Boston, a 30-story luxury residential tower under construction in the Fenway, is over halfway to topping off. The tower's concrete structural frame currently stands at 18 stories tall. A PERI Skydeck system is being used to frame concrete pouring. Per an update from the Pierce Boston team, the tower will soon receive its "brilliant costume" as exterior finishes, comprised of a "glimmering curtain wall made of metal and glass," are installed. Completion of Pierce Boston's facade is anticipated in Spring 2017; the tower is anticipated to open in Fall 2017.


Pierce Boston will feature a mix of 240 rental apartments and 109 condominiums with 20,000 square feet of retail across the tower's first two floors. Resident amenities will include a rooftop pool and a Level 30 Levity Lounge featuring a private dining room with a glass floor. Visit PierceBoston.com for sales and leasing information. The following is a aerial photograph of Pierce Boston, courtesy the Pierce Boston team:


Pierce-Boston-October-2016


The following is an Instagram post showing Pierce Boston along Boylston Street:


Pierce-Boston-October-2016-2

Construction @pierce_boston #188Brookline #1350Boylston #TheFenway

A photo posted by kryptom (@kryptom) on Sep 26, 2016 at 6:02am PDT


Pierce Boston
- Jun 30, 2016

Pierce Boston shoots for 30 stories


Superstructure construction is off to a strong start at Pierce Boston. The underground parking structure is complete, and the tower’s 30-story concrete superstructure has risen four floors. The first two floors, which will contain retail space, are fully framed. The construction team is using a Peri Skydeck system to frame concrete construction for each new floor. Pierce Boston will feature 28 stories of residential units, including 240 rental apartments and 109 condominiums, and 20,000 square feet of retail across the first two floors.


Condominiums at Pierce Boston, which range from $1 million to over $6 million, are already 30% pre-sold. Visit the Pierce Boston website for more sales information. 12 rooftop cabanas at Pierce Boston ranging from 150 to 250 square feet are being offered for sale to condominium buyers at $300,000 to $350,000 each.


Pierce-Boston-5
View of the front of the building at the corner of Brookline Avenue and Boylston Street

Pierce-Boston-6
View from Brookline Avenue

Pierce-Boston-8
View from Brookline Avenue

Pierce-Boston-1
View from the rear of the building

Pierce-Boston-2
View from Boylston Street

Pierce-Boston-10
Peri Skydeck system

Pierce-Boston-7
Peri Skydeck system

Pierce-Boston-4
View from Boylston Street

Pierce-Boston-3
View from Boylston Street

Pierce-Boston-9
Project banner


More information about Pierce Boston is posted below.


Boston Landing
- Jun 16, 2016

New Balance Headquarters earns LEED Platinum resource efficiency certification


New Balance's new headquarters facility at Boston Landing, completed in 2015, has achieved Leadership in Energy and Environmental Design (LEED) Platinum resource efficiency certification. This is the highest attainable efficiency honor awarded by the United States Green Building Council (USGBC). New Balance's facility is the first in the United States and one of only three worldwide to earn all possible points for Indoor Environmental Quality under the USGBC's rating system.


Source: Commercial Property Executive


Pierce Boston
- Apr 25, 2016

Pierce Boston about to pierce Boston's sky

Pierce Boston frame construction starts


Pierce-Boston-Headliner

Pierce Boston as seen from Brookline Avenue


Pierce Boston, named for its architecture that "pierces" the sky, is rising fast! Construction of Pierce Boston’s 30-story frame has begun. A tower crane has been installed; J. Derenzo Companies is at work building the tower crane’s lagging pit to protect the crane and surrounding pipelines. J. Derenzo Companies is also performing excavations for installation of plumbing at Pierce Boston.


Pierce-Boston-Derenzo-1

J. Derenzo Companies builds crane lagging pit


Pierce-Boston-Derenzo-2

J. Derenzo Companies performs excavations for plumbing


Pierce Boston’s elevator core has risen two stories. A Peri Skydeck formwork system has been installed along one end of Pierce Boston’s future frame to pour concrete for the building's second story. S&F Concrete is Pierce Boston's concrete contractor; John Moriarty & Associates is Pierce Boston's general contractor.


Pierce-Boston-Full-View-1

Pierce Boston with tower crane at left, Peri Skydeck at center and elevator core at right


Pierce-Boston-Full-View-2

Pierce Boston with elevator core at left and Peri Skydeck at right


At the frame’s opposite end, a wall is under construction for the Peri system’s second half.


Pierce-Boston-Wall-1

Pierce Boston construction team prepares Peri system wall


Pierce-Boston-Wall-2

A worker prepares the Peri system wall


The Peri system will soon extend all the way to the wall, and concrete for Pierce Boston's second story will be poured. 


Pierce-Boston-Full-Peri

View of the wall (at left) with respect to the rest of the currently built Peri system


The Peri system will frame the concrete pour for Pierce Boston's second story. Concrete will be poured along the top of the system's decking and along support pillars beneath. The following is an animation showing concrete poured along a Peri system:



Once the concrete has settled, the same Peri system will be used to construct all 30 of Pierce Boston’s stories. Concrete has already been poured along some of Pierce Boston's second story support pillars.


Pierce-Boston-Peri-1

View of Peri system underbody. Note concrete anchors in place for pouring of support pillars.


Pierce-Boston-Peri-2

View of Peri system underbody. Concrete has been poured along some second story support pillars.


We got to climb to the top of the Peri system's decking, where we saw the construction team preparing concrete anchors in anticipation of pouring concrete to construct Pierce Boston’s second story. These anchors will frame third story support pillars.


Pierce-Boston-Skydeck-Top-1

Construction team prepares concrete anchors for the next story's concrete pour


Pierce-Boston-Skydeck-Top-2

Another angle of concrete anchor preparation atop the Peri system's decking


At the top, we found more Peri system decking panels that will be used to construct the full Peri system decking for Pierce Boston’s second story concrete pour.


Pierce-Boston-Skydeck-Panels

Peri system decking panels ready for full system construction


The following is a video in which Joel Hagan of S&F Concrete explains the Peri system:



From the top of the Peri system decking, we saw freshly poured concrete along what will be a loading dock for Pierce Boston. Pierce Boston's underground parking structure, partially located beneath the future loading lock, is complete.


Pierce-Boston-Loading-Dock-2

Aerial view of freshly poured loading dock concrete


Pierce-Boston-Loading-Dock-1

Straight-on view of freshly poured loading dock concrete


The Pierce Boston construction team is hard at work building a game-changing tower that will set a new standard for Boston luxury living.


Pierce-Boston-Hard-Work-1

A worker prepares to install a new Peri system decking panel and extend the Peri system along Pierce Boston's full dimensions


Pierce-Boston-Hard-Work-2

A worker constructs Pierce Boston's future loading dock


Additional information about Pierce Boston is posted below.


Feb 20, 2016

Pierce Boston frame about to rise


J. Derenzo Companies is performing excavations in preparation for construction of the first story of Pierce Boston’s 30-story frame. Concrete is just about to be poured at the base of Pierce Boston’s future elevator core. A tower crane is now being installed, signaling the impending start of frame construction.


Pierce-Boston-Brookline-Avenue-Boylston-Street-Fenway-Point-Weiner-Ventures-Samuels-Associates-Development-Arquitectonica-John-Moriarty-Associates-Construction-J-Derenzo-Company-Hayward-Baker-Bay-Crane-1
Pierce Boston's future elevator core ready for a concrete pour. In the background is the base of Pierce Boston's tower crane.


Pierce-Boston-Brookline-Avenue-Boylston-Street-Fenway-Point-Weiner-Ventures-Samuels-Associates-Development-Arquitectonica-John-Moriarty-Associates-Construction-J-Derenzo-Company-Hayward-Baker-Bay-Crane-2
A full view of the Pierce Boston construction site with the future elevator core at center. At right is J. Derenzo Companies preparing for Pierce Boston's frame construction

Pierce Boston's underground parking structure is just about complete and will soon be sealed from above. Accordingly, construction of Pierce Boston's sheet pile wall is complete. The parking structure is connected underground to the existing parking structure of neighboring Fenway Triangle.

Pierce-Boston-Brookline-Avenue-Boylston-Street-Fenway-Point-Weiner-Ventures-Samuels-Associates-Development-Arquitectonica-John-Moriarty-Associates-Construction-J-Derenzo-Company-Hayward-Baker-Bay-Crane-3
View of Pierce Boston sheet pile wall above underground parking structure

Pile driving is complete at Pierce Boston. Pile drivers have been moved off site, making way for construction of Pierce Boston's frame.

Pierce-Boston-Brookline-Avenue-Boylston-Street-Fenway-Point-Weiner-Ventures-Samuels-Associates-Development-Arquitectonica-John-Moriarty-Associates-Construction-J-Derenzo-Company-Hayward-Baker-Bay-Crane-7
Pile drivers are no longer located on the Pierce Boston construction site


Boston Landing
- Feb 01, 2016

Impressive progress is being made at Boston Landing, a transformative multi-phased mixed-use development project in Boston's Allston neighborhood. New Balance's recently-opened headquarters building has a striking presence on both Guest Street, the Boston Landing development's main artery, and the parallel Massachusetts Turnpike, with sweeping curves and an overall distinctive design. New Balance's new headquarters opened for business in September 2015. Next door, an under-construction ice rink and 10-story office building are nearing completion. The ice rink will serve as the Boston Bruins' official practice facility.


On our recent visit, the construction team was hard at work putting finishing touches on the ice rink and office building, both of which are expected to be complete by fall 2016. Take a look at our new construction photographs posted above. More project information, including the full Boston Landing development plan, is posted below. Also check out 125 Guest Street, a residential component of Boston Landing currently under review by the Boston Redevelopment Authority.


Pierce Boston
- Jan 12, 2016

Pile driving and foundation construction underway at Pierce Boston


Pile driving and foundation construction are well underway at Pierce Boston. Steel piles are being driven to provide structural support. Sheet piles are being driven to construct a sheet pile wall. The sheet pile wall will reinforce Pierce Boston's foundation and underground parking structure. A total of 325 piles will be driven at Pierce Boston.

Pierce_Boston_Samuels_and_Associates_Development_Residential_John_Moriarty_and_Associates_General_Contractor_Construction_Arquitectonica_Architect_1
Steel pile driving underway at Pierce Boston

Pierce_Boston_Samuels_and_Associates_Development_Residential_John_Moriarty_and_Associates_General_Contractor_Construction_Arquitectonica_Architect_3
Steel pile about to be loaded into the pile driver

Pierce_Boston_Samuels_and_Associates_Development_Residential_John_Moriarty_and_Associates_General_Contractor_Construction_Arquitectonica_Architect_8
Sheet piles already driven along Pierce Boston's future sheet pile wall. At right are sheet piles about to be driven.


Pierce Boston
- Oct 20, 2015

Webcam installed at Pierce Boston


A live construction webcam has been installed at Pierce Boston.


Pierce Boston
- Oct 13, 2015

Groundbreaking ceremony held for Pierce Boston as foundation construction commences


An official groundbreaking ceremony for Pierce Boston (formerly The Point) will be held this Thursday, October 15th, 2015. Construction of Pierce Boston is moving forward swiftly; pile driving and construction of Pierce Boston's foundation and underground parking structure has begun.

Pierce-October-1
Pile drivers as seen from Boylston Street

Pierce-October-2
Pile drivers as seen from Brookline Avenue


Pierce Boston
- Aug 05, 2015

The Point rebranded Pierce Boston


The Point, currently under construction in the Fenway, has been rebranded Pierce Boston.


Pierce Boston
- Jun 17, 2015

Demolition complete at The Point


J. Derenzo Companies' JDC Demolition division has completed demolition of the former building located on the Point development site. Construction will soon begin on foundations of a new 30-story tower.

Pierce-June
Former building has been demolished


Thought Leadership

No new thoughts. Inquire about becoming a thought leader by clicking here

Headquarters

To unlock, this organization must be verified.

Please click here to verify >>