Haycon
- Aug 23, 2018

Haycon Construction Continues Work on Framing at 1065 Tremont Phase II

Haycon Construction continues work on framing at 1065 Tremont Phase II in Boston's South End.  This 6 story building will feature 28 apartments ranging from 1 to 4 bedrooms.  The first phase of the project, a 6 story, 16 unit apartment building was completed by Haycon in 2016.

 

1065 Tremont


44 North Beacon Street
- Jan 19, 2018

54 residential units proposed in Allston’s Union Square


Boston Real Estate Collaborative (BREC) proposes to construct 54 apartment and condominium residences at 44 North Beacon Street in Allston’s Union Square, the second proposed development in the neighborhood this month. The 53,800-square-foot building would contain 38 apartments and 16 condominiums, with 35 garage parking spaces located on site. As part of the project, a new public courtyard with plantings and art installations would be constructed along North Beacon Street.


An existing one-story commercial building at 44 North Beacon Street would be demolished. 44 North Beacon Street is located steps from the 15.2-acre Boston Landing mixed-use development and its’ new commuter rail station. The Mount Vernon Company recently proposed to construct two buildings across from the proposed project site at 37 North Beacon Street containing 83 apartments and condominiums. A third mixed-use development, 31 North Beacon Street, is under construction across from both proposed buildings. BREC has filed a Letter of Intent (LOI) formally proposing the 44 North Beacon Street development with the Boston Planning & Development Agency (BPDA), kicking off 44 North Beacon Street’s official review process.


290 Highland Avenue
- Nov 27, 2017

One new-construction condominium remaining for sale at 290 Highland Avenue in Davis Square


Just one condominium remains for sale at 290 Highland Avenue, a seven-unit new-construction luxury residential building built by Haycon located in Somerville’s Davis Square. The remaining residence, located on the building’s third floor, is 1,690 square feet in size and includes three bedrooms, including a master bedroom with a walk-in closet, and three bathrooms.


The residence, listed for $1.275 million, comes with a garage parking space and features amenities such as direct elevator entry, a private walk-out deck, Sonos sound integration, in-unit laundry and remote-controlled heating and cooling. Finishes include bamboo and tile flooring, recessed lighting, top-grade appliances, quartz countertops and Marvin windows.


290 Highland Avenue is LEED Gold and Energy Star sustainability certified, and is located a short drive or MBTA Red Line ride to Downtown Boston, Cambridge and Tufts University. Please email info@bldup.com for more information about the remaining residence at 290 Highland Avenue, and to schedule a showing. The following are photographs of the residence:


290 Highland Photos


290 Highland Avenue
- Aug 21, 2017

Haycon completes 290 Highland Avenue sustainable luxury building in Somerville


Premier building, construction and design firm Haycon has completed 290 Highland Avenue, a contemporary Somerville sustainable luxury building opening in September featuring seven exclusive residences, just one of which remains for sale, and retail space now leasing. Haycon has expertly installed today’s most desirable amenities throughout 290 Highland Avenue, crafting an ideal living environment.


290 Highland Avenue residences feature desirable amenities such as direct elevator entry, open concept floor plans, hardwood floors, recessed lighting and stainless steel appliances. Haycon has built 290 Highland Avenue to LEED Gold and Energy Star standards, providing residents with an unprecedented sustainable living opportunity in the heart of Somerville. 290 Highland Avenue is located a short walk from both Davis and Porter Squares, a short drive or MBTA Red Line ride to Downtown Boston, Cambridge and Tufts University. The following are interior photographs of 290 Highland Avenue:


290 Highland Avenue Interior Photos


The following are exterior photographs of 290 Highland Avenue:


290 Highland Avenue Exterior Photos


1065 Tremont Street Phase II
- Jul 11, 2017

Phase II of 1065 Tremont Street mixed-use development in South End receives final approval


Phase II of the 47,700-square-foot 1065 Tremont Street mixed-use development in the South End has received final approval from the City of Boston’s Zoning Board, giving general contractor Haycon the green light to start construction. The 31,500-square-foot Phase II building will feature 28 apartment residences and will be located next to the recently completed 16,200-square-foot Phase I building, which features 16 apartment residences with ground-floor commercial space.


One Newcomb Place
- May 12, 2017

One Newcomb Place, 23 new apartment residences, approved in South End


One Newcomb Place, a distinctive new building featuring 23 apartment residences which will be built by Haycon, was approved at last night (May 11th, 2017)’s Boston Planning & Development Agency (BPDA) Board Meeting. The building will require additional approval from the City of Boston’s Zoning Board of Appeals in order to proceed with construction.


One Newcomb Place
- Mar 22, 2017

23 new apartments proposed at One Newcomb Place in South End


Developers Boston Real Estate Collaborative and Urban Core Development propose to construct a distinctive new 6-story, 23-residence apartment building at One Newcomb Place in the South End, which would be built by Haycon. The development team has filed a Project Notification Form (PNF) for the project with the Boston Planning & Development Agency (BPDA), who is now reviewing the project plans.


1065 Tremont Street Phase II
- Feb 02, 2017

Expansion proposed for 1065 Tremont Street development in South End


Developers Boston Real Estate Collaborative and Urban Core Development propose to expand their 1065 Tremont Street development in the South End, constructing 28 new apartment residences next to the 2016-built Phase I building. The developers have filed plans for the Phase II building with the Boston Planning & Development Agency (BPDA), who is now reviewing the proposed project.