• Unknown

Totals

Total Square Footage 8,588,457
Total Dollar Volume $871,931,625.00

General

Established 2003
Website http://www.cube3studio.com/
Phone Number 978-989-9900

Description

At CUBE 3 Studio, we pride ourselves on providing creative, intelligent designs that take three very important factors into consideration: clients’ needs, budgets and the environment. By balancing these vital aspects, we ensure every design element has a point. And a point of view. Step inside any of our buildings and you’ll know what we mean.

Updates

The Danesh Group
- May 15, 2019

455 Harvard Street in Brookline Takes Shape

Framing is complete and window install is underway for 455 Harvard Street in Brookline. The four-story building will feature 17 apartments, 4 of which will be designated affordable, along with over 1,700 square feet of ground-floor retail space. Residents will have access to a roof deck and on-site parking.

455 Harvard Street May


Northeastern University
- Apr 25, 2019

Northeastern's New Residence Hall Fully Leased for Fall as Construction Continues

Northeastern University's new Residence Hall, Lightview may still be under construction but the project is already fully leased for the upcoming fall semester. The 21-story tower will include 221 student housing units with a total of 812 beds. Interior finishing is ongoing for the 1, 2, 3, and 4 bedroom units. Resident amenities will include a social lounge, a recreation, and gaming area and a fitness center. Lightview is set to open this fall. 

Lightview NU April


The Davis Companies
- Mar 27, 2019

Site Work Begins for The Mark at DeNormandie Wharf

With sales of the luxury waterfront building already underway, site work has started for The Mark at DeNormandie Wharf in East Boston.  The project will include 107 condominium residences with over 6,500 square feet of ground-floor public shared workspace. Resident amenities at The Mark will include a 5,045 square foot private elevated courtyard with grilling areas, fitness and wellness spaces, lounge areas and small, programmable function spaces. As part of the project, a new 240 linear foot Harborwalk section will be constructed along Boston Harbor, filling a missing link in the Harborwalk between Carlton Wharf and Lo Presti Park.

99 Sumner Street The Mark at DeNormandie Wharf East Boston


CUBE 3 Studio
- Mar 19, 2019

Site Work Begins for Mixed-Used Development in Weymouth Landing

Site work has started for the next mixed-use development along Commercial Street in Weymouth Landing. The project which will feature 87 residential units along with ground floor retails space sits next to the recently completed Landing 53. The site, on the Weymouth side of the border, offers easy access to the Commuter Rail.

weymouth landing march


National Development
- Mar 11, 2019

Construction Ongoing for 200 Unit Project in Woburn

Interior and exterior work are ongoing for the two building project, Emery Flats just north of Boston in Woburn. The development will feature 200 apartments, a mix of studio, one, two, and three bedrooms. Building amenities will include a fitness center, rooftop lounge, game space, co-working area, a clubroom with a full kitchen and an outdoor swimming pool. First units are expected to welcome residents in early summer.

emery flats woburn


Alliance Residential Company
- Mar 05, 2019

220 Unit Project Taking Shape in Hingham

Construction is rapidly progressing on the two buildings that will make up Broadstone Bare Cove, just off Route 3A, in Hingham. The project will feature 220 residential units along with many indoor and outdoor amenities including a pool and resident sky lounge. The 12-acre site sits adjacent to Bare Cove Park, a 484-acre historic town-owned park situated along the banks of the Weymouth Back River. Construction on Broadstone Bare Cove is set to be complete in late 2020. 

Broadstone Bare Cove Hingham


Framing Rising for First New Construction Building at St. Gabriel's
- Feb 07, 2019

Framing Rising for First New Construction Building at St. Gabriel's

The redevelopment of 11+ acre St. Gabriel's site in Brighton is in full swing with framing rising for the first new construction building that will part of the massive project. This first building is set to contain 127 units with plans to open later this year. At the Monastery exterior repairs are ongoing while on the inside crews are beginning the framing to transform the space into 27 apartments. Foundation work is also ongoing for Buildings 2 & 3 which are expected to be complete in fall 2020.

In total, the project will include 555 residential apartment units, and 105 of condominiums units, and around 510 parking spaces.

map

St gabriel brighton 1

st gabriel brighton 2

 

 

 


The Danesh Group
- Jan 22, 2019

Core Climbing for 455 Harvard Street in Brookline

The concrete core is climbing for the upcoming four-story, mixed-use project along Harvard Avenue just a few blocks from Coolidge Corner. The project will feature 17 rental units along with 1,735 square feet of ground-floor retail space. The units range in size from one to three bedrooms and a few offer private roof decks. Construction is set to be complete this summer.

455 Harvard Street January


NRP Group
- Jan 18, 2019

BLVD at Revere Beach Secures $35.3 Million Dollar Construction Loan

Capital One has provided $35.3 million in construction financing for the BLVD at Revere Beach development project.

The development calls to demolish the existing buildings and replace them with a five-story wood framed structure of studios, one- and two-bedroom apartments, and 2,500 square feet of retail space on the first floor for Bianchi’s and a coffee shop. Parking will be below.

 


NRP Group
- Jan 16, 2019

Development Property Acquired for $3.98 Million

The NRP Group has acquired multiple parcels of land on Revere Beach Boulevard in Revere, MA for $3.98 million.

The acquired property at 320-329 Revere Beach Boulevard is the site of approved development, BLVD at Revere Beach. The development calls to demolish the existing buildings and replace them with a five-story 145 unit wood framed structure of studios, one- and two-bedroom apartments, and 2,500 square feet of retail space on the first floor for Bianchi’s and a coffee shop. Parking will be below.


American Campus Communities
- Jan 07, 2019

Exterior Work Wrapping up for Lightview, Northeastern's New Residence Hall

Exterior finishing is wrapping up on the final section of Northeastern's new residence Hall, Lightview. With opening expected this fall, the waitlist is now open for this plush student housing. Lightview will offer over 800 beds across an array of 1 through 4 bedroom floor plans. This project will also feature a host of amenities including a 24 hr fitness center and student lounge.

Lightview NU Dorm


Peak Campus
- Jan 02, 2019

Saint Gabriel's Redevelopment Secures $150.165 Million in Construction Financing

The redevelopment project of Saint Gabriel's in Brighton has secured $150.165 million in construction financing via Blue Vista Capital Management.

In total the development will include around 555 residential apartment units, and 105 of condominiums units, and approximately 510 parking spaces. The center of the development will focus on the renovation and adaptive reuse of the existing St. Gabriel's Monastery and Church.


Taurus Investment Holdings
- Jan 02, 2019

Wakefield Office Property Refinanced for $17 Million

Harvard Mills, located in Wakefield, MA has been refinanced via Eastern Bank for $17 million.

Harvard Mills is a Class B office complex consisting of two connected brick-and-beam style office buildings, it was originally constructed to be a woolen mill in the early 1900s.


The Danesh Group
- Dec 04, 2018

Plumbing Permit Issued for 455 Harvard Street in Brookline

A plumbing permit has been issued for the upcoming mixed-use building along Harvard Street in Brookline. The project will include 17 apartments and 1,735 sf of ground floor retail space. There will also be parking for 12 cars onsite along with a common roof deck. The project is located a few blocks from Coolidge Corner and Allston.


The Davis Companies
- Nov 30, 2018

Meet The Mark at DeNormandie Wharf

Renderings have been released for the upcoming luxury condo project in East Boston, The Mark at DeNormandie Wharf (formerly known as the Hodge Boiler Works). The waterfront development will feature 107 units along with 6,500 sf of ground floor public shared workspace.  Resident amenities will include an outdoor courtyard with a fire pit along with a fitness center and several immersive entertainment lounge areas.

The_Mark_east_Boston_1

The Mark East Boston 2

The Mark East Boston 2


Northeastern University
- Nov 01, 2018

Window Install & Exterior Work Continue for New NU Dorm

Construction continues for Northeastern's upcoming 21-story dorm along Columbus Avenue in Roxbury.  When complete, the large project will include 812 beds along with a host of student amenities including a lounge gaming area and fitness center. American Campus Communities, the nation’s largest student housing developer,  will manage the building upon opening. 

Construction is expected to be complete in August 2019.

Northeastern_dorm


Criterion Development Partners
- Oct 31, 2018

RE150 Refinanced for $74.25 Million

Criterion Development Partners have refinanced their property in Medford known as RE150 for $74.25 million via Northwestern Mutual.

RE150 is located across from 100 Rivers Edge Drive, the first residential building at Rivers Edge, which features 222 apartments and was completed in 2009. RE150 is located a short distance from the Wellington MBTA Orange Line station and Interstate 93, minutes from Downtown Boston and Cambridge. Apartments and retail space at RE150 are now available for lease.


Toll Brothers
- Oct 30, 2018

Apartments Now Available at The Kendrick

Apartments are now available at The Kendrick in Needham.  Sections of the building are open as final touches are being put on the rest of the project.  In total, The Kendrick will contain 390 luxury apartments.  Units will range in size from studios to three bedrooms.  Building amenities include a pool deck and outdoor entertaining space with fire pit and movie theater.

The-Kendrick

 


The Danesh Group
- Oct 29, 2018

Site Work Underway at 455 Harvard Street

Site work is underway for the upcoming 17 unit apartment building on Harvard Street in Brookline, just a few blocks from Coolidge Corner.  The 4-story building will also include around 1700 sf of ground floor retail and 12 parking spaces.

455 Harvard


Cabot, Cabot & Forbes
- Oct 22, 2018

Renovations Continue at St. Gabriel's Monastery in Brighton

Renovations of the Boston Landmark building St. Gabriel's Monastery continue for the redevelopment of the 11.6 acre site in Brighton.  The historic monastery originally built in 1909 will be converted to 27 rental units. An additional 4 new buildings will be constructed on the site to include another 524 apartments and 105 condos. The plans also call for 510 parking spaces and improvements to the landscaping and open space, around 7 acres on the site. The development will include 85 affordable housing units and 13 workforce housing units.

Saint_Gabriels_`

Saint_gabriels_brighton

 


WinnCompanies
- Oct 01, 2018

The Watson in Quincy Nearing Completion

Crews are wrapping up finishing at The Watson in Quincy as the development plans to welcome its first residents on November 1st.  The 140-unit mixed-income building will feature studio, one and two-bedroom units. Resident amenities will include a fitness center and community room.  The project is located just 8 miles from Boston, near the MBTA Redline as well as a short drive from Quincy Center.

The Watson


Young Construction - Development
- Sep 11, 2018

Framing Nearing Completion at 60 Cross Street East in Somerville

Framing is wrapping up on the 3 story building located at 60 Cross Street in East Somerville.  The upcoming project will feature 75 residential units and is just minutes away from both Sullivan and Union Squares. Plans call for a private courtyard with a pool in the center of the property.

60 Cross Street


Northeastern University
- Aug 08, 2018

Exterior Work Ongoing at Northeastern's New Mega Dorm

Exterior work continues on Northeastern University's new 21 story student housing complex on Columbus Avenue in Roxbury.  The $160 million project will include a total of 812 beds spread throughout a mix of two and four bedroom apartments.  Residents will also have access to 12,000 sf of common amenity space and a fitness center.  The ground floor will house 3,000 sf of retail.  American Campus Communities will manage the tower once complete.

Northeastern


The Mark at DeNormandie Wharf
- Aug 02, 2018

East Boston Development Mortgaged for $48 Million

The Davis Companies have mortgaged their development at 99 Sumner Street in East Boston for $48 million via Salem Five Savings Bank

The project is an approved waterfront mixed-use development featuring 119 condominium residences with over 7,200 square feet of ground-floor publicly-accessible waterfront work share space. Resident amenities at Hodge Boiler Works will include a 5,045 square foot private elevated courtyard with grilling areas, fitness and wellness spaces, lounge areas and small, programmable function spaces.


The Tremont Burlington
- Jul 30, 2018

Nordblom Refinances Burlington Property for $31 Million

The Nordblom Company has refinanced their apartment property, The Tremont Burlington for $31 million via State Farm.

The property features a 4-story apartment building located in the heart of the bustling 3rd Ave mixed-use development in Burlington, MA. The complex features 180 rental units (1,2, and 3 bedrooms), a detached parking deck for 122 cars, and surface parking for another 189 vehicles.


The Kendrick
- Jul 11, 2018

Facade Install Underway at The Kendrick in Needham

Siding panel install continues at The Kendrick in Needham, formerly the 2nd Avenue Residences.  This 390 unit apartment building is set to open in the first half of 2019.  Resident amenities will include a biergarten and climbing wall in a three story fitness center.  There will also be a 583 space parking garage on the site.


Burlington Summit
- Jul 11, 2018

Burlington Summit Refinanced For $26.7 Million

The Gutierrez Company has refinanced their property known as the Burlington Summit for $26.7 million.

The property features a 600,000-square-foot Class A office park, of which 250,000 square feet have been developed and 350,000 square feet are currently under construction. The park is located in the heart of Burlington’s booming 128 development and has immediate access to route 128 and route 3.


AVA North Point
- Jul 11, 2018

Phase II Complete at Ava North Point

Callahan Construction Managers has completed construction on Phase II of AVA North Point in Cambridge. The 265 total unit luxury buildings (2), developed by AvalonBay Communities, features a mix of studio, one, two, and three bedroom residences. Resident amenities include a 24hr fitness center, gaming lounge, pool, elevated courtyard, pet spa, and a bike workshop with a unique DIY space.

The distinct apartments exterior was designed by Kyu Sung Woo Architects Inc. with CUBE 3 Studio designing the interior units. Most feature sliding barn doors, gear walls, utility charging stations, and chalkboard walls. In addition, the apartments include stainless steel appliances, granite countertops, in-unit laundry, and are designed for LEED Silver sustainability.

Callahan's work on the six-story, wood framed building also includes 3,000 square-feet of retail space on the ground floor and three levels of underground parking. AVA North Point is ideally situated less than a 5 minute walk from the Lechmere MBTA station and just one mile from Boston.


Burlington Summit
- Jul 09, 2018

DoublieDigit Sales Leases Space at The Summit

DoubleDigit Sales is The Summit’s newest tenant with an agreement on a 10-year lease for12,579 square-feet of office space at 100 Summit.

DoubleDigit Sales is one of North America’s top sales training companies. They specialize in helping salespeople, sales managers and sales leaders unlock their full potential, change behavior and attain sustainable increases in revenue.

The property features a 3-story 36,007 square-foot office building that was renovated in 2017 and is located in the heart of Burlington’s booming 128 development. The site has immediate access to route 128 and route 3.


Saint Gabriel’s Monastery Redevelopment
- Jul 09, 2018

Saint Gabriel's Construction Ongoing


Construction is ongoing at 159 Washington Street in Brighton, the site of the Saint Gabriel’s Monastery. The project is slated for completion in mid-2019.


The project consists of the construction of two five-story high new 400 Residential units, referred to as building two and three. Building two has a maximum footprint of 28 200 square-feet and building three has 37 500 square-feet. The first floor consists of parking in building two and residential units in building three. and residential and amenity spaces on the second floor through 5th floors

Per the project's Expanded Project Notification Form (EPNF), resident amenities could include "a fitness center, indoor basketball court, common lounges, kitchens, games room, café, outdoor pool, outdoor grills, and a generous amount of hard and soft landscaped areas." A total of approximately 395 parking spaces would be constructed on site.




Broadstone Bare Cove
- Jun 22, 2018

Site Work Underway at Hingham's Broadstone Development

The month of May saw steady progress in site work and foundation placement. Bulk soil export and Zone 1 footing excavation were ongoing, while the installation of infiltration system #4 was completed. Approximately 40% of the exterior footings, 14% of the foundation walls and 20% of the column footings for Building 2 were placed. ACM abatement activities were close to completion.

The project is an upcoming multi-family apartment development located in Hingham, MA. It will consist of two buildings, both with four stories of wood framing above one level of post-tensioned podium parking.


Saint Gabriel’s Monastery Redevelopment
- Jun 13, 2018

Building Permit Issued for Brighton Development Project

A building permit has been issued for the Saint Gabriel's Monastery Redevelopment project in Brighton, MA.

The project consists of the construction of two five-story high new 400 Residential units, referred to as building two and three. Building two has a maximum footprint of 28 200 square-feet and building three has 37 500 square-feet. The first floor consists of parking in building two and residential units in building three. and residential and amenity spaces on the second floor through 5th floors


The Watson
- Jun 12, 2018

Exterior Finishing Underway at The Watson

Exterior finishing underway at The Watson in Quincy, MA. Installation of the building’s exterior facade is well underway. Metal exterior finish panels have been partially installed along the exterior of the building. Window installation is complete as well as weatherproofing of the structure.

The 140-unit mixed-income apartment community is expected to open in 2018 in Quincy. It will feature eight studio, 85 one-bedroom, and 47 two-bedroom units. 26 units will be offered at market rate, 86 will be offered to households earning 110% of area median income (AMI) and 28 will be offered to households earning 50% of AMI.


Telford 180
- Jun 10, 2018

Certificate of Occupancy at Telford 180

A certificate of occupancy has been issued for Telford 180. The 6-story development features 85 new residences in Allston along the Charles River. 

Units for sale at Telford 180 include studios, one-bedrooms, and two-bedrooms. They all feature open floor plans with large windows and state-of-the-art finishes and appliances.


AVA North Point
- Feb 26, 2018

Finishing touches underway at AVA North Point luxury apartments in East Cambridge, built by Callahan Construction Managers


The exterior facade of AVA North Point, a new six-story, wood framed, 265-unit luxury apartment community, has been completed. The complex, developed by AvalonBay Communities and built by Callahan Construction Managers, is set to open this summer. In addition to the façade completion, finishes are currently being installed within apartments that include granite countertops, stainless steel appliances, hard surface flooring and in-unit washers and dryers. Common spaces, including lounges, a fitness center, landscaped elevated courtyards and a swimming pool are also being fit out.


AVA North Point will feature studio, one-, two- and three-bedroom apartments, efficiently designed to LEED Silver sustainability specifications. The community will also include a 3,000-square-foot ground-floor retail space and three levels of underground parking. AVA North Point is located steps from the Lechmere MBTA Green Line station, Kendall Square and the 45-acre, 4.5-million-square-foot Cambridge Crossing development, soon to be home to the North American headquarters of global healthcare technology leader Philips. The following is a photograph of AVA North Point:



Lightview Northeastern
- Feb 07, 2018

New Northeastern University student housing tower, one of Roxbury’s tallest buildings, tops off


Northeastern University’s new 21-story student housing tower, located at 10 Burke Street in Roxbury steps from Ruggles Station, has topped off, becoming one of Roxbury’s tallest buildings. The $160 million tower will contain 221 student housing units for Northeastern students, and is Boston’s first ever dormitory financed by a private developer; Northeastern has partnered with American Campus Communities to build the tower. With the final beam now in place, installation of exterior finishes will begin along the tower’s facade. The tower will include resident amenities such as recreation and gaming areas and a fitness center, in addition to approximately 3,000 square feet of ground-floor commercial space. Construction of the tower began last Summer, and is expected to last approximately two more years. The following is a video of the tower’s topping-off:



Meriel Marina Bay
- Jan 25, 2018

Callahan completes Meriel Marina Bay luxury apartments on Quincy waterfront


Callahan Construction Managers has completed Meriel Marina Bay, a 352-unit luxury apartment community located on the Quincy waterfront overlooking Boston Harbor. Meriel Marina Bay, developed by Hines, features studio to three-bedroom apartments available for immediate lease, and also includes a new extension of the Marina Bay public waterfront with 20,000 square feet of retail space.


Residences at Meriel Marina Bay feature open layouts and luxurious finishes such as oversized windows, wide plank flooring and kitchens with stainless-steel appliances, center islands with breakfast bars, quartz countertops and European-style soft-close cabinets. Many apartments are equipped with oversized balconies or private patios. Resident amenities at Meriel Marina Bay include four elevated courtyards featuring fire pits, barbeque grills, wet bars and deck swings, a heated outdoor swimming pool, a club room with lounge seating, a catering kitchen and a fitness center.


Sweeping views of Boston Harbor and the Boston skyline are visible throughout Meriel Marina Bay. Both of the developments’ buildings structural frames include five stories of wood above a base two-level steel podium that contains a total of 500 garage parking spaces, in addition to indoor storage for bikes, paddle boards and kayaks. Meriel Marina Bay is conveniently located near Downtown Boston and Interstate 93. The community is also adjacent to Squantum Point Park, which features a two-mile Riverwalk trail and beaches. The following is a photograph of Meriel Marina Bay:


Meriel Marina Bay Aerial


Emery Flats
- Jan 11, 2018

200 new apartments break ground in Woburn


National Development has broken ground on Emery Flats, a residential community featuring 200 apartments located just off of Interstate 93 in Woburn, minutes from Downtown Boston. The two-building community will contain a mix of studio, one-bedroom, two-bedroom and three-bedroom apartments, with each unit including washer/dryer units and individual heating/cooling controls. Communal amenities will include a fitness center, a rooftop lounge, lounge and work spaces and an outdoor swimming pool. Emery Flats is scheduled to open in February 2019.


The Watson
- Dec 20, 2017

Structural framing underway at The Watson mixed-income apartments in Quincy, built by Dellbrook | JKS


The base steel podium of The Watson, a new-construction 140-unit mixed-income apartment community in Quincy being built by Dellbrook | JKS, is complete, and upper floors are now being framed with wood. A concrete base slab has been poured atop The Watson’s podium to create the second floor’s base, and the second floor has been nearly fully framed. The Watson’s elevator core has topped off at five stories tall. Opening in summer 2018, The Watson will provide rental housing to a variety of residents of different income levels. 26 units will be rented at market rates, 86 will be rented to households earning 110% of area median income (AMI) and 28 will be rented to households earning 50% of AMI. The following are photographs of The Watson:


The Watson Photos


RE150
- Nov 29, 2017

Callahan completes new-construction RE150 apartments along Mystic River in Medford


Callahan Construction Managers has completed RE150, a 282-unit new-construction luxury apartment complex along the Mystic River in Medford, the latest residential building at the 30-acre Rivers Edge mixed-use development. Located at 150 Rivers Edge Drive, RE150 features desirable amenities including a clubhouse, a fitness center, a swimming pool and outdoor entertainment areas such as two private courtyards and green space overlooking the Mystic River. On RE150’s ground floor is 18,200 square feet of retail and restaurant space, which could soon be home to a full-service bar/restaurant and specialty/convenience retailers, as well as vehicle parking.


RE150 features two five-story buildings constructed with four-stories of wood framing above one-story steel podiums. The buildings are wrapped around an above-grade precast concrete parking garage, with a total of 1,042 parking spaces.


RE150 is located across from 100 Rivers Edge Drive, the first residential building at Rivers Edge, which features 222 apartments and was completed in 2009. RE150 is located a short distance from the Wellington MBTA Orange Line station and Interstate 93, minutes from Downtown Boston and Cambridge. Apartments and retail space at RE150 are now available for lease. The following are photographs of RE150:


RE150 Photos


One Upland
- Nov 07, 2017

New-construction One Upland apartments in Norwood trade for $93 million


Developers Campanelli and Thorndike Development have sold One Upland, a 262-unit residential apartment community in Norwood, MA completed in September 2016, to Jefferson Apartment Group for $93 million. The sale amounts to nearly $355,000 per unit. The construction cost for One Upland was $60 million.


Massachusetts Housing Partnership provided $58.5 million in financing towards Jefferson's acquisition of One Upland. JLL represented Campanelli and Thorndike in the deal and procured Jefferson as the buyer. One Upland is located just off of Interstate 95/128 and a short distance from the Route 128 MBTA and Amtrak train station, providing a short commute to downtown Boston. “We are excited to grow our acquisition program in our core markets. One Upland is a unique opportunity in a low supply market,” said Jim Butz, CEO of Jefferson, in a prepared statement.


Jefferson is currently building a $120 million development in Malden Center featuring 320 market-rate apartment residences, over 22,500 square feet of ground-floor retail and a 45,000-square-foot office space that will serve as Malden's new City Hall. The nationwide firm also owns numerous Boston-area apartment complexes.


99 Tremont Street
- Oct 19, 2017

BPDA approves switch from apartments to condominiums for 99 Tremont Street


The Boston Planning & Development Agency (BPDA) has given Saracen Properties approval to market 62 newly constructed residences at 99 Tremont Street in Brighton as condominiums, as opposed to apartments as originally approved. Eight condominiums at 99 Tremont Street will be designated affordable. Saracen’s decision to switch 99 Tremont Street to condominiums from apartments comes in light of the Allston-Brighton condominium market’s strong recent performance, including the 85-unit Telford 180 new-construction condominiums selling out pre-completion. A number of new condominium buildings have since been proposed for Allston-Brighton, including 46 units at 46 Hichborn Street and 82 units at 70 Leo M. Birmingham Parkway.


Telford 180
- Sep 29, 2017

Finishing touches underway at sold-out Telford 180 condos in Allston, opening this Fall


The Dellbrook | JKS construction team is putting finishing touches upon Telford 180’s exterior facade and interior residences and common spaces ahead of the building’s opening this Fall. Telford 180 features 85 condominium residences, all of which are sold prior to the building’s completion. Just about all finishes are installed inside Telford 180 and along the building’s facade. Telford 180 will feature an array of amenities, including a rowing room, a full gym, a lounge and an elevated outdoor courtyard with grills and a fire pit. The building is located along the Charles River, featuring sweeping water views, and is located a short walk from Harvard Business School and a short drive and transit ride to Cambridge and Downtown Boston. The following are photographs of Telford 180:


Telford 180 Photos


The Watson
- Aug 28, 2017

Dellbrook | JKS constructs foundation of The Watson, 140-unit mixed-income apartment community in Quincy


The Dellbrook | JKS construction team is hard at work constructing the foundation and underground parking structure of The Watson, a 140-unit mixed-income apartment community opening Summer 2018 in Quincy. Large vertical sections of concrete have already been poured along the foundation, and formwork is being erected in order to construct additional foundation sections. Following completion of The Watson’s foundation, the building’s steel first floor podium will be erected, after which the top four floors will be framed with wood.


The Watson will feature the largest number of workforce units ever financed under MassHousing’s Workforce Housing Initiative, with nearly two thirds of the building comprised of middle-income apartments offered to households earning 110% of area median income (AMI). “This development is aimed at people who have incomes too high for subsidized housing but are priced out of Greater Boston’s high market rents as housing costs continue to rise,” said Gilbert Winn, CEO of The Watson’s developer WinnCompanies, in a prepared statement. The following are photographs of Dellbrook | JKS at work at The Watson:


The Watson Photos


Telford 180
- Aug 27, 2017

One home remaining at Telford 180, new Allston condos opening this Fall


Just one home remains for sale at Telford 180, a new Allston luxury condominium building built by Dellbrook | JKS opening this Fall featuring 85 residences. The remaining home, a two bedroom/two-bathroom residence overlooking the Charles River with two deeded parking spaces, is offered for $892,800. Telford 180 is just about complete, with blue, tan, grey and white exterior finish panels nearly fully installed along the building’s facade and luxurious interior finishes and appliances nearly fully installed throughout residences and common spaces. Telford 180 will feature desirable amenities including a rowing room overlooking the Charles River Esplanade, a full gym, a lounge and an outdoor courtyard with grills and a fire pit. The following is a photograph of Telford 180:



Meriel Marina Bay
- Aug 22, 2017

Ribbon cut on newly completed Meriel Marina Bay luxury apartments, and Marina Bay boardwalk expansion, on Quincy waterfront


A ribbon cutting ceremony was held Saturday, August 12th for the newly completed Meriel Marina Bay luxury apartments on the Quincy waterfront, and the associated expansion of the Marina Bay boardwalk. The boardwalk’s size has been nearly doubled as part of Meriel Marina Bay’s development, creating new publicly-accessibly waterfront space and retail. Meriel Marina Bay features two five-story buildings featuring 352 studio, one-, two- and three-bedroom residences and 20,000 square feet of ground-floor retail, with resident amenities including a fitness center, three elevated courtyards, a swimming pool and on-site garage parking. Breathtaking views of Boston Harbor and the Boston skyline are visible throughout Meriel Marina Bay. Over 25% of apartments at Meriel Marina Bay are leased following the launch of leasing last Spring; apartments are now available for lease.


Meriel Marina Bay is the latest addition to Quincy’s thriving Marina Bay neighborhood, located a short drive, transit trip or boat ride to Downtown Boston. “The expansion of the Marina Bay boardwalk is a truly meaningful milestone in our work to complete the Meriel Marina Bay community and further enhance the many wonderful aspects of this neighborhood,” said Hines Managing Director Michael Francis in a prepared statement. “The new boardwalk and new retail spaces will provide additional opportunities to complement the already thriving mix of retail offerings along the waterfront and provide both locals and visitors with added space to enjoy the unique benefits of this waterfront neighborhood.”


Meriel Marina Bay complements Quincy’s recent resurgence, with hundreds of thousands of square feet of new housing and commercial space currently under development and recently completed. “Our city has experienced an ongoing positive evolution across all neighborhoods over the last number of years with the steady addition of new businesses and residents proud to call Quincy home,” said Quincy Mayor Thomas P. Koch in a prepared statement. “Marina Bay has particularly continued to thrive as a destination where residents and visitors alike come to live, work and play, and I’m thrilled to see the continued growth of this community with the expansion of the boardwalk through the construction of Meriel Marina Bay.”


The Kendrick
- Aug 16, 2017

Wood framing underway at 2nd Avenue Residences luxury apartments in Needham


Wood framing of Phase 1 of 2nd Avenue Residences, a five-story, 390-unit luxury apartment development built by Dellbrook | JKS located just off of Route 128 in Needham, is nearing completion, with Phase 2's wood framing also well underway. Underground plumbing is underway for Phase 3 of 2nd Avenue Residences; wood framing of Phase 3 will commence in the coming months. 2nd Avenue Residences' 583-car precast parking garage is nearing completion, with its' first sequence built ahead of schedule and the second sequence well underway. 2nd Avenue Residences will feature apartments ranging from studios to three-bedrooms, with desirable amenities such as a pool deck and outdoor entertaining space. The following is a photograph of 2nd Avenue Residences, courtesy Dellbrook | JKS:



Telford 180
- Aug 08, 2017

Exterior and interior finishing underway at nearly sold out Telford 180 luxury condos in Allston


The Dellbrook | JKS construction team has completed weatherproofing of Telford 180’s six-story frame and installation of windows, and is now installing exterior finish panels along the facade. Inside the building, drywall has been plastered within Telford 180’s common spaces and 85 condominium residences, and luxurious finishes and appliances are being installed throughout. Opening this Fall, Telford 180 will feature desirable amenities including a rowing room overlooking the Charles River Esplanade, a full gym, a lounge and an outdoor courtyard with grills and a fire pit. Telford 180 is over 94% sold, with just five residences remaining for sale. The following are photographs of Telford 180:


Telford 180 Photos


The Kendrick
- Jul 20, 2017

BLDUP’s Building of the Week: 2nd Avenue Residences luxury apartments in Needham


Built by Dellbrook | JKS and opening in the first half of 2019, 2nd Avenue Residences will feature 390 luxurious apartment residences located in Needham a short drive from Route 128. Apartments will range from studios to three-bedrooms and include multiple desirable amenities, such as a pool deck and outdoor entertaining space. The following is a video exhibiting 2nd Avenue Residences:



The Mark at DeNormandie Wharf
- Jul 14, 2017

Revised Hodge Boiler Works development, featuring 119 new condominiums, approved on East Boston Waterfront


Revisions to the Hodge Boiler Works development on the East Boston Waterfront were approved at yesterday’s Boston Planning & Development Agency (BPDA) Board Meeting. The development will now feature 119 condominium residences overlooking the Boston skyline, in addition to 7,200 square feet of shared-work space and a Harborwalk extension. The development’s change from apartments to condominiums signifies the growing strength of the East Boston Waterfront condominium market. The nearby under-construction Slip65 development, the East Boston Waterfront’s first condominium offering, has been seeing very strong demand, with 50% of residences reserved for prices ranging from $700- to over $1200 per square foot; some residences at Slip65 are under agreement for over $1.5 million. The Hodge Boiler Works development will now go before the City of Boston's Zoning Board of Appeals (ZBA) for review; ZBA approval will be required in order for the building to proceed with construction.


99 Tremont Street
- Jul 13, 2017

Dellbrook | JKS completes Phase I of 99 Tremont Street, new Brighton luxury apartments now leasing


Dellbrook | JKS has completed Phase I of the 62-residence 99 Tremont Street luxury apartment development in Brighton, with studio, one and two-bedroom residences now available for lease. Luxurious finishes have been installed throughout the Phase I building’s residences and amenity spaces, which include a fitness area and a common room. Construction of Phase II is nearing completion and will feature additional residences, along with a landscaped courtyard. 99 Tremont Street is located steps from Brighton’s Oak Square, a short drive or express bus ride to Downtown Boston. The following are photographs of 99 Tremont Street, courtesy Dellbrook | JKS:


99 Tremont Photos


The Kendrick
- Jun 21, 2017

Superstructure construction begins at 2nd Avenue Residences, 390 upcoming luxury apartments in Needham


Large sections of the foundation of 2nd Avenue Residences, a new Needham luxury apartment community built by Dellbrook | JKS, have been poured, and the five-story building’s frame has begun to rise. The first wood-framed section of the building’s first floor has been erected, and large vertical concrete sections of the first floor have been poured. Excavations to prepare for remaining concrete foundation base pouring continue across the 5.13-acre project site; electrical and plumbing ground utilities have been nearly fully installed. 2nd Avenue Residences will be a $135 million, 390-unit luxury apartment building opening in the first half of 2019 including 583-space precast concrete parking garage as well as two courtyards with pool and outdoor entertaining space. The following are photographs of 2nd Avenue Residences:


2nd Avenue Residences Photos


Burlington Summit
- Jun 09, 2017

Work begins on second phase of 350,000-square-foot EMD Millipore headquarters in Burlington


With the 280,000-square-foot first phase of lab technology producer EMD Millipore's new 350,000-square-foot Burlington headquarters nearing completion, earthwork has begun to prepare the site for construction of the 70,000-square-foot Phase Two addition. Phase One will open in October; expected completion of Phase Two is in the third quarter of 2018. EMD Millipore's new facility is designed by CUBE 3 Studio and is the second overall phase of Burlington Summit, a 600,000-square-foot Class A office park of which 250,000 square feet have been developed.


Telford 180
- May 05, 2017

Allston’s Telford 180 luxury condominiums top off, facade work underway


Facade work has begun at Telford 180, a new Allston luxury condominium building built by Dellbrook | JKS, following the topping off the building’s six-story structure. Windows are in place along a large section of Telford 180’s facade, which is fully coated with moisture-resistant sheathing. Fireproofing and and weatherproofing are being installed along the facade in order to commence installation of exterior finishes. Strategically located a short drive or transit ride to Downtown Boston, Telford 180 will feature 85 luxury condominium residences overlooking the Charles River with distinctive amenities. The following are photographs of Telford 180:


Telford 180 Photos


Deco
- Apr 19, 2017

TA Realty acquires newly-built, 180-unit Deco luxury apartments in Quincy for $68.5 million


Real estate investor TA Realty of Boston has acquired Deco, a 180-unit luxury apartment development completed in 2016 located across from the Quincy Adams MBTA Red Line station, for $68.5 million, or $380,556 per unit. Developer Cabot, Cabot & Forbes acquired the 2.3-acre parcel on which Deco is built for nearly $10.4 million ($10,391,456), or $4,518,024 per acre, in May 2014 and paid around $36 million to develop the building. Lincoln Property Company will take over as Deco's property manager; Deco was previously managed by The Bozzuto Group.


The Mark at DeNormandie Wharf
- Apr 14, 2017

Revised plans filed for long-stalled Hodge Boiler Works development on East Boston Waterfront


The Davis Companies, who acquired the approved 2.5-acre Hodge Boiler Works development site on the East Boston Waterfront for $5 million in March 2015, proposes to revise the project plans to include additional residences, a new public work share space component and expanded public waterfront open space. Davis proposes to construct 119 rental apartment residences at Hodge Boiler Works in addition to 7,200 square feet of public waterfront work share space. The previous project plan, approved by the Boston Planning & Development Agency (BPDA) in 2012, consisted of 95 apartments, six bed-and-breakfast hotel rooms and a 576 square foot cafe. The new project plan includes a total of 34,500 square feet of public open space. A 42 boat slip marina, included in the approved plan, has been eliminated. The Boston Planning & Development Agency (BPDA) is now reviewing the revised Hodge Boiler Works plans. The latest Hodge Boiler Works renderings are posted above.


The Kendrick
- Mar 31, 2017

Foundation work underway at 2nd Avenue Residences, 390 upcoming luxury apartments in Needham


The first foundation section is being poured at 2nd Avenue Residences, a $135 million 390-unit luxury apartment building being built by Dellbrook | JKS in Needham. Across the 5.13-acre site, excavation continues in preparation for foundation construction. Opening in the first half of 2019, 2nd Avenue Residences will feature 390 luxurious apartments wrapped around a 583-space precast concrete parking garage as well as two courtyards with pool and outdoor entertaining space. The following are photographs of 2nd Avenue Residences:


2nd Avenue Residences Photos


AVA North Point
- Mar 30, 2017

Wood superstructure framing underway at Avalon NorthPoint Phase Two in Cambridge


Construction of wood superstructure framing is well underway at Avalon NorthPoint Phase Two, a new mixed-use building located across from the Lechmere MBTA Green Line station, and will soon reach its’ full height of six stories. The first section of Avalon NorthPoint Phase Two’s post tensioned concrete podium structure, which will house the building’s ground floor lobby and retail space and is serving as the wood framing’s base, is complete. Underneath Avalon NorthPoint Phase Two are three completed levels of below-grade parking. Upon completion, Avalon NorthPoint Phase Two will feature 285 apartment residences with approximately 3,000 square feet of ground-floor retail. The following are photographs of Avalon NorthPoint Phase Two:


Avalon NorthPoint Phase Two Photos


Meriel Marina Bay
- Mar 21, 2017

Meriel Marina Bay nears opening


Interior and exterior finishing touches are well underway at Meriel Marina Bay, a waterfront luxury apartment community opening Phase 1 this Spring in Quincy. Callahan Construction Managers is building this mixed-use property in Quincy’s thriving Marina Bay neighborhood in partnership with client Hines. The construction team is installing luxurious features including stainless steel appliances, porcelain backsplash kitchen tiles, solid quartz countertops, Kronoswiss® hardwood flooring and plush bedroom carpeting in Meriel Marina Bay’s 352 apartments.


Windows have been fully installed across both of Meriel Marina Bay’s buildings, and exterior finish panel installation is just about complete. The construction team is also installing railings and finishes along communal elevated courtyards and apartments’ private balconies. Along Meriel Marina Bay’s ground floor, a public waterfront boardwalk is being constructed overlooking Boston Harbor. The property will also include approximately 20,000 square feet of retail space that will line the boardwalk. The following are photographs of Meriel Marina Bay:


Meriel Marina Bay Photos


Telford 180
- Mar 08, 2017

Telford 180 frame nears topping off, residences over 50% pre-sold


The 6-story frame of Telford 180, a distinctive luxury residential building built by Dellbrook | JKS overlooking the Charles River, has risen 4 stories high and will soon top off. Weatherproofing of the frame’s exterior is underway as the building continues to rise.


A total of 85 unique luxury residences including studios, one-bedrooms and two-bedrooms are now available for purchase at Telford 180. Residences at Telford 180 are over 50% pre-sold. Residences will feature open floor plans, top-quality finishes, abundant natural lighting and sweeping river views. With desirable amenities including a Fitness Center, a Rowing Room, a Club Lounge and an Elevated Exterior Courtyard, Telford 180 will conveniently enable residents to live, work and play without leaving the building!


For more details and to schedule a private showing of Telford 180, visit the Telford 180 website or click Contact Broker above. Telford 180 is on track for completion this Fall. The following are photographs of Telford 180:


Telford 180 Photos


99 Tremont Street
- Mar 08, 2017

Facade nearly complete at 99 Tremont Street Apartments in Brighton


Exterior finishes have been fully installed along the 4-story front section of 99 Tremont Street Apartments, a luxury apartment development built by Dellbrook | JKS. Finishes are now being installed along the facade of 99 Tremont’s 5-story rear section, in addition to windows and moisture-resistant sheathing. Interior finishes are being installed in front section residences, and interior framing is underway within the rear section. When complete, 99 Tremont will feature 62 luxury apartment residences located convenient to Brighton’s Oak Square and the Massachusetts Turnpike. The following are photographs of 99 Tremont Street Apartments:


99 Tremont Photos


Telford 180
- Jan 31, 2017

Superstructure rising at Allston's Telford 180, residences now on sale


Framing of the first two floors of Allston luxury residential building Telford 180’s 6-story superstructure, built by Dellbrook | JKS, is now complete. Concrete has been poured along the base of Telford 180’s future second floor roof deck, which will feature landscaping, grills and a fire pit. An additional 4 stories of wood framing will now rise into the Allston skyline to construct this distinctive luxury residential building overlooking the Charles River. Telford 180’s enclosed parking area is now installed and will house 84 vehicle parking spaces.


A total of 85 residences including studios, one-bedrooms and two-bedrooms are now available for purchase at Telford 180. Residences feature open floor plans, top-quality finishes and abundant natural lighting. Telford 180 is uniquely situated along the Charles River Esplanade a short walk to Harvard Business School and the new Boston Landing T Station, and a quick drive or bus ride to Downtown Boston and Cambridge.


For more details and to schedule a private showing, visit the Telford 180 website or click Contact Broker above. Telford 180 is on track to be completed in Fall 2017. The following are photographs of Telford 180:


Telford 180 Photos


Babcock Place
- Dec 27, 2016

62 new apartments proposed in Brookline’s Coolidge Corner


Developer Tremont Asset Management LLC proposes to construct Babcock Place, a new five-story residential building on Babcock Street in Brookline’s Coolidge Corner. A Site Approval Application for the project has been filed with MassHousing and is now under official review.


455 Harvard Street
- Dec 26, 2016

17 new apartments with ground-floor retail proposed on Harvard Street in Brookline’s Coolidge Corner


Local real estate developer and manager The Danesh Group proposes to construct a new four-story mixed-use building on Harvard Street in Brookline located in the heart of Coolidge Corner. A Site Approval Application for the project has been filed with MassHousing and is now under official review.


99 Tremont Street
- Nov 14, 2016

Dellbrook | JKS installs finishes at 99 Tremont Street Apartments in Brighton


Dellbrook | JKS has installed exterior finishes along 99 Tremont Street Apartments’ facade fronting Tremont Street. The four-story building section along Tremont Street is topped off and fully sealed with windows and moisture-resistant sheathing. The five-story section at the property’s rear is just about topped off, with installation of the last wood framing sections underway. Framing of interior apartments and installation of electrical, HVAC and plumbing utilities is underway. 99 Tremont Street Apartments will open to residents in Spring 2017. The following are photographs of the 99 Tremont Street Apartments site:


99 Tremont Photos


Telford 180
- Nov 08, 2016

Dellbrook | JKS frames Telford 180 superstructure, pre-sales start


The Dellbrook | JKS construction team has completed Telford 180’s below-grade parking level and is at work framing the 85-unit condominium building’s first floor superstructure. Concrete has been poured along the base of the first floor and the below-grade parking area. Concrete has also been poured along a section of the vertical superstructure framing. Telford 180 is expected to open for occupancy in Fall 2017; pre-sales of Telford 180 condominiums are now underway. A new website, Telford180.com, has been released for Telford 180. Newly released renderings of Telford 180 can be found above. The following are photographs of the Telford 180 construction site:


Telford 180 Photos


Meriel Marina Bay
- Nov 08, 2016

Meriel Marina Bay reaches full height


Meriel Marina Bay’s Building Two has reached six stories tall, the building’s full height. The frames of both buildings at Meriel Marina Bay are now being prepared for installation of exterior finishes. Windows have been installed along large sections of both buildings. Meriel Marina Bay will open in Spring 2017 and will feature 352 luxurious residential apartments overlooking Boston Harbor with sweeping views of the Boston skyline.


Geotechnical design/build contractor Helical Drilling prepared the Meriel Marina Bay construction site, which overlooks scenic waterfront Squantum Point Park, for development of the two new Meriel Marina Bay buildings. The existing urban fill on which the Park and its’ surroundings are built was deemed unsuitable for traditional foundation support methods such as over-excavate/replace and deep pile foundations. Accordingly, Helical Drilling installed several hundred Geopeir grouted rammed aggregate pier elements in the Meriel Marina Bay site’s soil. These elements extend 9 to 16 feet below grade and support the footings of Meriel Marina Bay. The following are photographs of Meriel Marina Bay, courtesy the development team on Twitter:





Northland Newton Development
- Nov 03, 2016

Northland releases preliminary renderings for 30-acre Needham Street development


Newton-based Northland Investment Corporation has released preliminary renderings and details of a proposed 30-acre development that would transform Needham Street in Newton with new residential, office and retail space. Northland could file formal plans for the project with the City of Newton in 2017. The following is a link to the Concept Board for Northland’s proposed development. Additional information about and renderings of the project can be found above.


AVA North Point
- Oct 19, 2016

J. Derenzo Companies excavates Avalon NorthPoint Phase Two foundation


J. Derenzo Companies has excavated Avalon NorthPoint Phase Two’s three-level underground parking garage. Concrete is now being poured to construct the building’s foundation and the garage. The following is an Instagram photograph by Feldman Land Surveyors of the Avalon NorthPoint Phase Two construction site:


14714450_204847789924579_3916809577504440320_n

Northpoint II, setting column line control for the concrete sub. #landsurveyors #surveylife #linecontrol #construction

A photo posted by Feldman Land Surveyors (@feldmanboston) on Oct 17, 2016 at 8:06am PDT


Telford 180
- Sep 18, 2016

Telford 180 concrete foundation construction underway


Telford 180's underground parking garage has been excavated, and a sheet pile wall has been erected along the garage's perimeter to reinforce the excavation. Concrete footings are now being constructed along the garage's perimeter to support Telford 180's foundation. The construction team is hard at work building wooden forms for foundation footings and pouring concrete into the footings. Telford 180 will be an 85-unit residential condominium building overlooking the Charles River in Allston. The following are photographs of the Telford 180 site:


Telford 180 Photos


Meriel Marina Bay
- Aug 29, 2016

Meriel Marina Bay wood framing nearly complete, exterior finishing underway


The wood frame of Meriel Marina Bay's Building One, overlooking Boston Harbor and the Boston skyline, is complete. Windows and moisture-resistant sheathing are now being installed along Building One's exterior. Building Two's five-story frame is just about to top off; exterior finishing of Building Two will commence shortly afterwards. Opening Spring 2017, Meriel Marina Bay will feature 352 waterfront luxury rental residential apartments ranging from studios to three-bedrooms located on the Marina Bay boardwalk steps to beaches, ferry service to Downtown Boston and multiple waterfront dining and entertainment options. Visit MerielMarinaBay.com for apartment leasing information. As part of Meriel Marina Bay, the Marina Bay boardwalk will be extended along Boston Harbor; approximately 20,000 square feet of ground-floor retail will be located at Meriel Marina Bay fronting the new boardwalk. The following are photographs of Meriel Marina Bay:


Meriel Marina Bay August 2016


The following is a panoramic view of the Marina Bay boardwalk:


Meriel Marina Bay August 2016 Panorama


AVA North Point
- Aug 26, 2016

Excavation and foundation work underway at Avalon NorthPoint Phase Two


J. Derenzo Companies has nearly fully excavated the underground parking structure of Avalon NorthPoint Phase Two, a six-story residential building located steps away from the Lechmere rapid transit station. A total of three levels of underground parking will be excavated. Sheet pile walls reinforced by horizontally-mounted large diameter round steel beams are being used to support the excavated garage. A reinforced concrete foundation is being poured vertically along the garage’s perimeter to support the building’s substructure. Approximately 285 residential rental apartments and 3,000 square feet of retail space will be constructed at Avalon NorthPoint Phase Two. The following are photographs of Avalon NorthPoint Phase Two:


Avalon NorthPoint Phase Two


Thorndike Exchange
- Aug 08, 2016

Salvatore's owner proposes dynamic mixed-use development next to Lowell MBTA station


Lupoli Companies, owned by Salvatore's Restaurants and Sal's Pizza owner Salvatore N. Lupoli, has submitted formal plans to the City of Lowell for Thorndike Exchange, a proposed $30 million dynamic mixed-use redevelopment of a decaying 123,000 square foot mill building located next to the Lowell MBTA commuter rail station steps to the Pawtucket Canal. Lupoli proposes 118 loft-style residential apartments, 57,500 square feet of commercial office space and two restaurants across 6,750 square feet for a total of 189,320 square feet. The existing five-story mill building would be fully restored, and a new adjacent six-story residential building and one-story vertical glass addition to the existing building would be constructed. Resident amenities at Thorndike Exchange would include a fitness center. A total of 184 parking spaces would be provided including 64 on site and 120 in an existing parking garage located at the commuter rail station. The following are links to the Planning Board Narrative and site & floor plans for Thorndike Exchange, and the following is a link to the Thorndike Exchange website. The following are renderings of Thorndike Exchange:


Screen Shot 2016-08-08 at 61434 PM
Aerial view


Screen Shot 2016-08-08 at 61502 PM
View South along Thorndike Street


Screen Shot 2016-08-08 at 61412 PM
View North along Thorndike Street


Screen Shot 2016-08-08 at 65849 PM
Aerial view


Thorndike Exchange would be constructed in two phases. The first phase would entail renovation of the existing mill building and construction of 42 market-rate residential apartments as well as commercial and retail space. Phase Two would construct the new six-story building and one-story vertical glass addition to the mill building for 76 additional residential units. The 118 total residential units at Thorndike Exchange would include 19 studios, 58 one-bedroom/one-bathroom units, 25 two-bedroom/one-bathroom units and 16 two-bedroom/two-bathroom units.


In an interview with Banker & Tradesman, Lupoli explained that the vertical glass addition would be illuminated at night. "I want to signify there’s a different product in the Merrimack Valley, very slick and sexy, comparable to Boston," says Lupoli. Lupoli also explained that retail options at Thorndike Exchange would include a sports bar, smaller restaurants, a rooftop garden and a roof bar.


The first Lowell Planning Board hearing for Thorndike Exchange is tentatively scheduled for August 17th, 2016. The Lowell Sun reports that Lupoli is optimistic that construction of Phase One could start by October 2016, with residential occupancy by mid-2017. Site work at Thorndike Exchange is already underway, starting with interior sandblasting, removal of windows and exterior power-washing.


135 Fulkerson Street
- Aug 03, 2016

Cabot, Cabot & Forbes proposes 40 new Kendall Square residential units


Developer Cabot, Cabot & Forbes has submitted a Special Permit Application (SPA) to the City of Cambridge proposing to construct a new three-story building in Kendall Square at 135 Fulkerson Street containing 40 residential units including 16 one-bedrooms, 21 two-bedrooms and 3 three-bedrooms. 35 units would be offered at market rates, and five units would be designated affordable. 40 parking spaces would be provided on site. Private open green space would be available to residents. Cabot, Cabot & Forbes entered a Purchase and Sale Agreement with the 135 Fulkerson Street site's current owner in March 2015. A one-story, 37,600 square foot industrial building stands on the site. The following are links to the Special Permit Application and Special Permit Graphic Submission for 135 Fulkerson Street. The following are renderings of 135 Fulkerson Street:


Screen Shot 2016-08-03 at 42225 PM
View North along Fulkerson Street


Screen Shot 2016-08-03 at 42246 PM
View South along Fulkerson Street


Saint Gabriel’s Monastery Redevelopment
- Jul 26, 2016

New details and renderings for proposed Saint Gabriel's Monastery Redevelopment in Brighton


Developers Cabot, Cabot & Forbes and Peak Campus have submitted an Expanded Project Notification Form (EPNF) to the Boston Redevelopment Authority (BRA) with new details and renderings for the proposed 663,000 square foot redevelopment of the 11.6-acre Saint Gabriel's Monastery site in Brighton. The following is a link to the EPNF. Per the EPNF, approximately 679 rental residential apartments marketed to "graduate students, young professionals and other university affiliates such as residents, faculty and staff" would be constructed on site. The developers anticipate to start construction in mid-2017; construction would last approximately 24 months.


Apartments would range from studios to three-bedrooms and would be constructed across five buildings. The existing monastery building would be restored, and four new buildings would be constructed ranging from one to seven stories tall. The existing Pierce House fronting Washington Street would be restored and would contain one residential unit. A new building would also be constructed on site for the active Shrine to Our Lady of Fatima. The existing Saint Gabriel’s Church and dormitory structures would be demolished. The following is a site plan of the proposed Saint Gabriel's Monastery Redevelopment:


Screen Shot 2016-07-26 at 32558 PM


Resident amenities could include "a fitness center, indoor basketball court, common lounges, kitchens, games room, café, outdoor pool, outdoor grills, and a generous amount of hard and soft landscaped areas." A new public courtyard would be constructed on site providing "vistas of Boston and Cambridge." A total of approximately 7.3 acres of open space would be constructed, representing 62% of the Saint Gabriel's Monastery site. A total of approximately 395 parking spaces would be constructed on site. The following are renderings of the Saint Gabriel's Monastery Redevelopment; the project's architects are Cube3 Studio and Bargmann Hendrie + Archetype:

Saint-Gabriels-Monastery-Redevelopment-Student-Housing-Washington-Street-Brighton-Boston-Cabot-Cabot-Forbes-Residential-Development-Project-Cube3-Studio-Rendering
Aerial Perspective


Screen Shot 2016-07-26 at 40159 PM

View of Building 2 and Public Plaza


Screen Shot 2016-07-26 at 40149 PM

View of Fatima Shrine

Screen Shot 2016-07-26 at 40137 PM
View from Washington Street


Telford 180
- Jul 21, 2016

Ground broken on Telford 180, 85 condominiums along Charles River in Allston


Developer The Davis Companies broke ground this week on Telford 180, an 85-unit residential condominium building along the Charles River in Allston. The following is a link to the official press release announcing the groundbreaking. Built by Dellbrook Construction and designed by Cube3 Studio, the six-story building will feature 85 condominiums with sweeping river and Boston skyline views surrounded by lush green space. Completion of Telford 180 is anticipated in Fall 2017.


Stephen Davis, Vice President at The Davis Companies, sees Allston's Charles River waterfront and the Western Avenue corridor as "a fantastic neighborhood poised for significant change." With Harvard University expanding its Allston footprint and recent development in Allston and nearby Watertown, Davis sees the Telford 180 site as "an opportunity to serve a remarkably underserved market in Boston's construction boom." With Telford 180, Davis hopes to create a "near-term housing enhancement" that will bring additional energy to the area and create housing convenient convenient to major employment and education centers "at a price point that will be readily accessible to young professionals." Davis points to the area's bicycle infrastructure and direct bicycle path connections to Boston and Cambridge as a major benefit and anticipates a number of Telford 180 residents will opt to commute via bicycle. Telford 180 will include bicycle storage in addition to 84 vehicle parking spaces.


Condominiums at Telford 180 will range from studios to three-bedrooms and feature open floor plans with large windows, high ceilings and state-of-the-art finishes and appliances. Resident amenities will include a rowing room, a full gym and a lounge featuring an indoor club room and an outdoor courtyard with grills and a fire pit. As part of the project, a new 6,000 square foot public park will be constructed at the corner of Telford Street and Western Avenue. The following are renderings of Telford 180:


Exterior Renderings
View along Telford Street


Exterior Renderings 2
View at Telford Street (left) and Soldiers Field Road (right)


Lightview Northeastern
- Jul 17, 2016

Northeastern University Columbus Avenue Student Housing Project approved for construction


The Boston Redevelopment Authority approved Northeastern University's Columbus Avenue Student Housing Project for construction at last Thursday’s board meeting. Developed by Northeastern University and American Campus Communities, the $160 million project will construct a 21-story tower containing 221 student housing units with a total of 812 beds, in addition to approximately 3,000 square feet of ground-floor retail. Construction could start this year; John Moriarty & Associates is the project's construction manager.


The following is the link to the Draft Project Impact Report (DPIR) for the Columbus Avenue Student Housing Project. More information about the project is posted below.


42 Wellman Street
- Jul 13, 2016

Largest market-rate residential development in Lowell history approved by Planning and Zoning boards


The Lowell Sun reports that both the City of Lowell, MA's Planning Board and Zoning Board of Appeals have approved 42 Wellman Street, the largest market-rate residential development in Lowell history, for construction. The project now requires approval from Lowell's Conservation Commission to proceed. 42 Wellman Street would contain 240 market-rate residential apartments ranging from studios to three-bedrooms. The $40 million building is developed by KS Partners of Woburn and is located convenient to Route 3 and Interstates 93 and 495 a short drive to Burlington, Boston and Cambridge. More information about 42 Wellman Street is posted below.


Meriel Marina Bay
- Jul 12, 2016

Meriel Marina Bay on Quincy waterfront tops off


A topping-off ceremony was held for Meriel Marina Bay on June 28th, 2016. The following is a link to the official press release announcing the topping-off. During the ceremony, Meriel Marina Bay's last beam of steel was lifted into place and installed, completing Building Two's structural steel frame. 163 wood-framed residential apartments will now be constructed above Building Two's steel frame. Wood framing is underway on Building One, which will contain 189 apartments.


Located in Quincy's waterfront Marina Bay neighborhood with sweeping views of Boston Harbor and the Boston skyline, Meriel Marina Bay will feature 352 luxury apartments across two new buildings. Resident amenities will include a fitness center, three elevated courtyards and a swimming pool in addition to sweeping ocean and skyline views. The project will also include a public waterfront boardwalk extension and approximately 20,000 square feet of retail.


Initial occupancy of Meriel Marina Bay is expected in Spring 2017. Bozzuto will be Meriel Marina Bay's property manager. The following are links to pre-leasing information and to the Meriel Marina Bay website.


The following are photographs from the Meriel Marina Bay topping-off ceremony, courtesy Nickerson PR:


MerielMarinaBay_ToppingOff_Nickerson_062816-4
The final beam is lifted into place


MerielMarinaBay_ToppingOff_Nickerson_062816-3
The final beam is installed


MerielMarinaBay_ToppingOff_Nickerson_062816-6
A worker signs the final beam


MerielMarinaBay_ToppingOff_Nickerson_062816-9
A worker signs the final beam


MerielMarinaBay_ToppingOff_Nickerson_062816-7
Wood framing of units underway at Building One


The following is a rendering of Meriel Marina Bay, courtesy Elkus Manfredi Architects:


MerielMarinaBay_ElkusManfrediArcitects_2016


The following are aerial photographs of the Meriel Marina Bay project site taken in early June, courtesy Nickerson PR:


Meriel-Marina-Bay_Aerial-View_Callahan
Aerial view of Building One


Meriel-Marina-Bay_Aerial-View_2_Callahan
Aerial view of Building One (background) and Building Two (foreground)


60 Cross Street East
- Jun 30, 2016

New developer for 75-unit residential building on East Somerville Stop and Shop site


Young Construction, a local real estate developer and general contractor, acquired a section of the East Somerville Stop and Shop's surface parking lot last Friday, June 24th, 2016 for $4.25 million as recorded in the Middlesex South Registry of Deeds. The section acquired is a 61,738 square foot parcel known as 60-70 East Cross Street. A three-story, 75-unit residential building designed by Cube3 Studio is approved for construction on the parcel. Young Construction has indicated on its website that construction of the project is starting.


The following is a site plan showing the existing supermarket and the future residential building:


Screen Shot 2016-06-30 at 40244 PM


Criterion Development Partners, the parcel's seller, guided the 75-unit building through approval. An initial deed was also recorded Friday transferring ownership of the parcel from The Stop and Shop Supermarket Company to Criterion Development Partners for $2.78 million as recorded in the Middlesex South Registry of Deeds.


The following are renderings of the future 75-unit building at 60 Cross Street East:


60-70-Cross-Street-Stop-and-Shop-East-Somerville-McGrath-Highway-Young-Construction-Residential-Development-Project-VHB-Cube3-Studio-Architectural-Rendering

View from McGrath Highway


Screen-Shot-2016-02-25-at-24856-PM-1024x536

View of building


Cross_3

View of building


The following is the deed for the sale of the parcel to Young Construction:


   


Saint Gabriel’s Monastery Redevelopment
- May 27, 2016

New housing proposed at former Brighton monastery


The Boston Business Journal (BBJ) reports that Cabot, Cabot & Forbes (CC&F) proposes to construct a 680­-unit, 610,000 square foot graduate student housing facility at the 11.6-acre former Saint Gabriel’s Monastery at 159­-201 Washington Street in Brighton. The proposed project would include four new residential buildings and renovation of the existing monastery building.


The new residential buildings would be three to seven stories tall. The project would be designed to accommodate over 4,100 residents. The renovated monastery building would house co­-working space, a cafe and the project’s leasing office. The project would include approximately 400 parking spaces.


No proposed timeframe for the project has been reported at this time. John Moriarty & Associates would be the project’s general contractor. The new buildings would be built using wood­-frame construction, a first for large­-scale unionized projects in Boston.


AVA North Point
- May 15, 2016

J. Derenzo Companies breaks ground on NorthPoint’s next residential development


J. Derenzo Companies has broken ground on Phase Two of the Avalon NorthPoint residential development project and is excavating the project’s foundation and underground parking structure. Two new buildings will be built as part of Avalon NorthPoint Phase Two containing approximately 285 residential units and 3,000 square feet of ground-floor retail.


J. Derenzo Companies excavates Avalon NorthPoint Phase Two's foundation and underground parking structure


J. Derenzo Companies excavators at Avalon NorthPoint Phase Two

Excavation at Avalon NorthPoint Phase Two


Driving of sheet piles is underway along the foundation to construct the sheet pile wall. The wall will reinforce Avalon NorthPoint Phase Two’s foundation and three-level underground parking structure.


Sheet piles being driven along Avalon NorthPoint Phase Two's foundation


Allied Pile Driving, Inc. driving sheet piles at Avalon NorthPoint Phase Two


Sheet piles driven at Avalon NorthPoint Phase Two


Driving of sheet piles underway at Avalon NorthPoint Phase Two


NorthPoint master developer DivcoWest acquired the 42-acre master-planned NorthPoint site for $300 million in August 2015. Upon completion, NorthPoint will contain a mix of residential and commercial uses located near Downtown Boston and Kendall Square. A new 355-unit residential apartment tower at NorthPoint, Twenty|20, opened in summer 2015.


Locus map of NorthPoint site


Avalon NorthPoint Phase Two is being developed in partnership with AvalonBay Communities and The McKinnon Company. AvalonBay Communities is building a 38-story mixed-use tower, Avalon North Station, across the Charles River from NorthPoint. Avalon NorthPoint Phase Two is located across from both the existing Lechmere rapid transit station and the new relocated Lechmere station planned as part of the Green Line Extension project.


Rendering of future Lechmere station with Avalon North Point (white buildings) and the NorthPoint site in the background


More information about Avalon NorthPoint Phase Two is posted below.


Deco
- Mar 01, 2016

Deco's 180 apartments are now leasing targeting a March 15th opening. Finishing touches are being installed along the building's facade. Deco's bright, distinctive finishes and Art Deco architectural inspiration have a strong presence at the gateway to Quincy Center. With a number of resident amenities and a walkable location convenient to rapid transit and highways, Deco is a great choice for those seeking an urban lifestyle.


99 Tremont Street
- Feb 01, 2016

Foundations are being dug at 99 Tremont Street Apartments by the Dellbrook Construction/JK Scanlan Company team. The team is hard at work transforming a formerly vacant lot into a 62-unit residential development. 99 Tremont Street Apartments will bring an increased residential presence to Oak Square, an eclectic commercial center in Boston's Brighton neighborhood. Expected construction completion is in late 2016. Our latest site photographs are posted above; project renderings and more project information are posted below.


Meriel Marina Bay
- Sep 30, 2015

Meriel Marina Bay officially breaks ground


A groundbreaking ceremony was held for Meriel Marina Bay on September 21st, 2015. Guests included Quincy Mayor Tom Koch, Massachusetts State Senator John F. Keenan, Massachusetts State Representative Bruce J. Ayers and Quincy Planning Board Chairman William Geary. Meriel Marina Bay will feature 352 waterfront luxury residential apartments, 20,000 square feet of retail and a public waterfront boardwalk. Occupancy of Meriel Marina Bay is expected in Spring 2017. The following is a link to the official press release for the groundbreaking. The following is a photograph from the groundbreaking, courtesy Hines:


K3A6872


Thought Leadership

No new thoughts. Inquire about becoming a thought leader by clicking here

Headquarters

See CUBE 3 Studio's Full Portfolio >>