Since the beginning of our family-owned company’s foundation we have hired and trained the most experienced field operators, designers and craftsmen. Our process is one that requires extreme attention to detail and meticulous fabricating techniques using state of the art precision tooling, equipment and technology. Collaborating with architects, consultants, elevator companies, general contractors, property managers and building owners, Draper can transform early concepts into spectacularly executed realities. Be it new construction or the modification of an existing bank of elevators, our products are comprised of the finest, most innovative, high quality materials available. When combined with our expertise and abilities, the result is an end product that delivers a lasting first impression, whether it’s a high-rise, Class ‘A’ building with 20+ elevators or a property with only one car that serves as both a passenger and freight; the specifications may be different but the expectation remains the same.

Updates

100 Shawmut
- Nov 15, 2019

Construction Ongoing at 100 Shawmut Construction is ongoing for the upcoming condo building 100 Shawmut Ave. in the South End. Work continues on the historic brick facade that is being preserved as part of the project. When complete 100 Shawmut will offer 138 luxury residences plus a suite of resident amenities designed for entertaining including an entertaining kitchen, caterer's kitchen, and billiard room. The building will be topped by a sky lounge offering sweeping Boston views.


290-292 Main Street
- Nov 05, 2019

Construction Continues at MIT's 290-292 Main St. Various stages of construction are ongoing at MIT's 290-292 Main Street project. The tower's higher modern level, where the graduate student housing will be located, has moved on to interior finishings while the ground-level retail space is actively undergoing construction and historical restoration of the exterior.  When complete the building will feature 450 student housing units plus a childcare facility and around 10,000 square feet of retail space.


Bulfinch Crossing
- Oct 29, 2019

Building Permit Issued for One Congress The building permit has been issued for the upcoming 43 story office tower at One Congress. The building will feature over 1M square feet of Class A office space along with 10,800 square feet of retail plus parking for 1159 cars. Building amenities will include a grand three-story lobby, conference facilities, a third-party operated fitness center, and a 1-acre landscaped terrace. The permit is valued at over $346M.  


33 Arch Street
- Oct 22, 2019

$4.76M Reno Permit Pulled for DLA Piper Offices at 33 Arch St. Corderman & Company has pulled a permit for interior office renovations of the 25, 26th, and 27th floors, the DLA Piper offices, at 33 Arch Street. The phased project, valued at $4.76M will include selective demo, new millwork, flooring, painting and MEP's.   


Waterside Place Phase 1B
- Oct 14, 2019

Interior Finishing Ongoing for Gables Seaport Interior finish work is ongoing for the 307 luxury apartments at Gables Seaport along Congress Street directly next to the Silver Line MBTA Station. Gables Seaport will feature a mix of studios through 3 bedrooms and offer residents 24-hour concierge service, a clubroom and outdoor lounge, fitness center, and resort-inspired pool. As the building sits so close to the silver line, only 84 parking spaces are included on-site.  


Omni Boston Hotel at the Seaport
- Oct 13, 2019

Framing Progressing for Omni Boston Hotel at the Seaport Framing continues on the upcoming Omni Seaport Hotel with the first set of windows going in at the corner of Summer & D Streets for what will be one of two towers connected by the three-story podium. The 1,055 room hotel will also include 120,000 square feet of meeting space plus an underground tunnel connecting the hotel to the Convention Center across the street. Construction is expected to last through 2021.


Bulfinch Crossing
- Oct 08, 2019

Bulfinch Crossing's Residential Tower Gets a Name: The Sudbury As facade and window install continue on the upper floors of the 45 story, 480-foot residential tower at Bulfinch Crossing, a name for the building has been announced, The Sudbury. Expected to welcome first residents this coming spring, The Sudbury will include 368 apartments along with 55 condos. Along with numerous building amenities, the homes here will offer one of a kind views across Boston.  


Moxy Hotel
- Sep 29, 2019

CO Issued for Moxy Hotel A certificate of occupancy has been issued for The Moxy Hotel with first guests expected in early October. The 24-story tower features 346 "micro" guest rooms, each room at the measuring in at around 175 square feet. Amenities at the Moxy include a rooftop bar and lounge as well as meeting rooms, a kitchen and dining area and a fitness center. 


Bulfinch Crossing
- Sep 17, 2019

Fire Alarm Permit Pulled for Residential Tower at Bulfinch Crossing A fire alarm permit has been issued for the residential tower at Bulfinch Crossing. Topping off at 480 feet, the tower will consist of 368 apartment units and 55 condominiums. The first phase of move-ins are expected in Spring of 2020.  


Bulfinch Crossing
- Aug 30, 2019

Bulfinch Crossing Residential Tower Tops Off The 45-story, 480-foot tall residential tower at Bulfinch Crossing has topped off. The luxury building will include 368 apartments and 55 condominiums for a total of 423 residential units. Resident amenities will include a rooftop garden and sky lounge along with a fitness center, pool, and concierge service. The first units within the project are expected to open spring 2020.


Moxy Hotel
- Aug 28, 2019

Fire Alarm Permit Issued for Moxy Hotel With expected opening just around the corner, the permit for the fire alarm system at the Moxy Hotel in Downtown has been pulled. The $800K permit covers the install of alarms throughout the 346 guest rooms and the amenity spaces within the 24-story tower.    


Waterside Place Phase 1B
- Aug 15, 2019

Fire Alarm Permit Issued for Waterside Place Phase 1B A fire alarm permit has been issued Waterside Place Phase 1B in the Seaport. The 23--story tower will feature 307 apartments along with 3,500 square feet of ground-floor retail space. Construction is expected to be complete this coming winter.      