With offices in more than 30 cities serving over 150 markets globally, and over 400,000 residences under management, Greystar currently ranks 1st among the top 50 U.S. Apartment Managers according to the 2015 National Multi Housing Council Survey. Our innovative business model combines our international platform with the deep local market knowledge so important to each community's success. Every community is staffed by the very best real estate professionals who are specially trained to think like an owner and who take pride in resident satisfaction.

Updates

EDENS
- Oct 04, 2018

The Andi at South Bay Nearing Completion

The Andi at South Bay is now leasing as work is wrapping up on the first building (Building D) in the project.  The 475 luxury unit complex, located in the new section of the South Bay Center will offer residents a host of amenities including 2 fitness centers, a private courtyard, salt water pool, and co-working space. Units within the project range in size from 450 sf studios to 1400 sf 3 bed/2bath apartments. 
The Andi is a key piece of the new 720,000 square foot mixed-use development that has transformed the 10-acre site at the intersection of Dorchester and South Boston.

Building D The Andi
Residential Building D nearing completion


Renderings of The Andi:
The Andi

The Andi 1

The Andi


Greystar
- Sep 24, 2018

Revere Property Acquired for $89.25 Million

Greystar has acquired the property at 650 Ocean Avenue in Revere for $89.25 million. 

Ocean 650 features a 211,294 square foot mixed-use building on Revere Beach. The six-story building consists of 230 luxury rental apartments along with 304 parking spots for residents.


South Bay Town Center
- Jul 25, 2018

Work Continues at South Bay Town Center

Work continues at South Bay town center as an interior fit-out of 5,000 square feet of space to accommodate a new restaurant is underway. The work includes new mechanicals (electrical, plumbing, HVAC, sprinkler, and fire alarm systems). Additionally, a new kitchen, dining room, interior petitions, and drywall interior finishes are being completed.

When complete, the project will include approximately 475 residential units, 120,000 square feet of retail space, a 60,000 square foot cinema and a 130-room hotel. A total of five new buildings will be built. South Bay Town Center will be pedestrian-oriented, with active ground-floor uses and open spaces.


The Village at Barnstable
- Jul 15, 2018

Construction Continues at The Village at Barnstable

Callahan Construction Managers advances exterior work on the first phase of The Village at Barnstable, an all-new senior housing community, developed by Greystar and designed by The Architectural Team, located on Cape Cod. During the month of June, Callahan continued work on wood framing, roof installation; exterior element installation, and began gas line installation. 

This first phase of the project will include 225 independent style residences in a four-story building. All residents will have access to a clubhouse, pool, and underground parking. The articulated façade will include balconies at each unit.

For the second phase of the project, Callahan will be completing two smaller buildings set to specialize in assisted living. Upon completion, The Village at Barnstable is set to include 340 total units.


Elan Union Market
- Jul 13, 2018

Construction Ongoing at Elan Union Market in Watertown

With its first building open and available for rent, construction continues on the second building at Elan Union Market in Watertown.  In total the project will include 282 residential units with just over 10,000 sf of retail space. A glass walkway will connect the two buildings for residents and a small parcel of land at the back of the project will be made into a park.



Proto
- Jun 20, 2018

Proto Kendall Square Now Open

Proto, Kendall Square’s newest residential tower, welcomed its first residents earlier this month. The 280 unit building aims to offer “a balance of connection and comfort” to the innovative community right outside its door. Amenities aimed at attracting the tech and startup crowd include collaborative work spaces, a music room, video game lounge, and on-site tech a/v consulting. Prices for the luxury residences are currently ranging from $2560 per month for a 420 sf studio to around $5550 per month for a 2 bedroom 2 bath.

Retail space at the project is set to include a Mediterranean restaurant Cava Grill, Bank of America and a coffee shop.



Proto
- May 21, 2018

Proto Set for June Opening

Construction progress continues on the Proto, and the exterior is now complete. The building, its common areas and the studio, one and two bedroom apartments will be completed by June 1st. Residents will be able to move-in beginning this June.

The Kendall Square project, a 22-story mixed-use tower will feature approximately 280 apartment residences and 16,000 square feet of retail.

The project remains on schedule using Touchplan, a construction software that allows developers to plan, implement, and monitor projects in their entirety. The innovative software gives developers the ability to see the full spectrum of their project down to every last detail. Touchplan has let developers keep their projects on or ahead of time leading to lower costs and more efficient construction.



South Bay Town Center
- Apr 01, 2018

Exterior Work at South Bay Town Center

Exterior framing and drywall are going up at South Bay Town Center as they aim for a summer 2018 opening. The project will include approximately 475 residential units, 120,000 square feet of retail space, a 60,000 square foot cinema and a 130-room hotel. A total of five new buildings will be built. South Bay Town Center will be pedestrian-oriented, with active ground-floor uses and open spaces.







Proto
- Feb 25, 2018

Finishing touches underway at Proto apartments, opening this Summer in Kendall Square


The facade of the 22-story Proto luxury apartment tower in Kendall Square has been fully installed, and fit out of the tower’s interior is underway in advance of its’ scheduled opening this Summer. Proto will feature 280 apartment residences ranging from micro units to two-bedrooms, with 16,000 square feet of retail home to Mediterranean restaurant Cava Grill, Bank of America and a coffee shop. The tower will include amenities such as an outdoor terrace, an indoor fireside lounge and collaborative workspace. Ori Systems robotic furniture will be available as well. Newly revealed renderings of Proto are posted above. The following is a photograph of Proto:


Proto


Proto
- Nov 29, 2017

22-story Proto apartment tower, opening Summer 2018 in Kendall Square, tops off


A topping-off ceremony was held today for Proto, a 22-story tower featuring approximately 280 apartment residences located in the heart of Kendall Square. The tower has now reached its’ full height, with structural concrete pouring and steel construction complete. Exterior finish panels and windows have been nearly fully installed along Proto’s facade, and interior fit out has begun. Leasing of apartments at Proto will commence January 2018, with the tower expected to open Summer 2018. Proto, located at 88 Ames Street steps from the Massachusetts Institute of Technology (MIT), multiple leading biotechnology companies and major employers such as Facebook and Google, will contain apartments ranging from micro units to two-bedrooms, with 36 designated affordable. 16,000 square feet of retail will be located along the tower’s ground floor. The following is a photograph of Proto:



South Bay Town Center
- Sep 20, 2017

Edens acquires junk company site at gateway to South Bay Town Center development for $3.6 million


Edens, developer of the $200 million, 720,000-square-foot South Bay Town Center project in Dorchester, has acquired the 0.2-acre site of the Lenox Junk Company, located at the future gateway to South Bay Town Center, for $3.6 million. The parcel, located at 1170 Massachusetts Avenue at the corner of Allstate Road, presents an unprecedented opportunity for Edens to construct an engaging, appropriate gateway for South Bay Town Center, a pedestrian-oriented development which will feature approximately 475 residential units, 120,000 square feet of retail space, a 60,000 square foot cinema and a 130-room hotel. 1170 Massachusetts Avenue’s seller is Core Investments, who acquired the site for $900,000 in May 2013. Core Investments is currently developing the nearby $400 million, 735,000-square-foot Washington Village mixed-use development in South Boston’s Andrew Square.


South Bay Town Center
- Sep 14, 2017

Helical Drilling provides ground improvement solution at South Bay Town Center development in Dorchester


Helical Drilling has completed ground improvement at the 720,000-square-foot South Bay Town Center mixed-use development in Dorchester. Ground improvement was necessitated by South Bay's geotechnical composition of unstable urban fill, including up to 15 feet of loose-to-medium dense granular fill with ash, slag, cinders, and brick underlain by up to 10 feet of soft organic silt and followed by medium dense sand and gravel. In order to strengthen the soil, Helical Drilling installed Geopier® Rammed Aggregate Pier® Elements (RAPs), providing both spread footing support and slab-on-grade support. GeoConcrete® Column Rigid Inclusions (GCCs) were used in areas with thicker organic deposits and high footing bearing pressures.


Upon completion in 2018, the 10-acre South Bay Town Center will feature 475 apartment residences, 120,000 square feet of retail space, a 60,000-square-foot AMC cinema, a 130-room addition to the existing Holiday Inn Express hotel and three precast concrete parking garages. The following are photographs of ground improvement underway at South Bay Town Center, courtesy Helical Drilling:


South Bay Town Center Photos


Proto
- Aug 29, 2017

Concrete superstructure of 88 Ames tower in Kendall Square over halfway poured, exterior finish installation underway


The 22-story concrete superstructure of 88 Ames Street, a mixed-use tower under construction in Kendall Square, is over halfway to its full height, with 12 full floors poured. The building’s elevator core has reached the 13th floor, and metal anchors are being placed along the 13th floor’s base in order to pour the base slab. 88 Ames Street will top off in the coming months, with completion expected next year. The building's first gray and white exterior finish panels have been installed up to the sixth floor.


88 Ames Street will feature 280 apartment residences and 16,000 square feet of retail located steps from the Massachusetts Institute of Technology (MIT) and Kendall Square’s multiple centers of employment, restaurants and retail options. The following is an aerial photograph of 88 Ames Street, courtesy Boston Properties:


88 Ames Street (Courtesy Boston Properties)


South Bay Town Center
- Jul 18, 2017

475 new residences break ground at South Bay Town Center in Dorchester


Two new buildings featuring 475 residences have broken ground at the 720,000-square-foot South Bay Town Center mixed-use development in Dorchester. Initial site work for a 45,000-square-foot addition to the existing Holiday Inn Express hotel on site is underway as well. A 602-space precast concrete parking garage is nearing completion at South Bay Town Center, and interior and exterior finishing are underway at the development’s new AMC movie theater. The 10-acre South Bay Town Center is expected to open in 2018 and will feature approximately 475 residential units, 120,000 square feet of retail space, a 60,000 square foot cinema and a 130-room hotel, all oriented about an active pedestrian streetscape. The following is an aerial photograph of South Bay Town Center, courtesy Lee Kennedy Company:


South Bay Town Center


Serenity Apartments
- Jun 14, 2017

Construction complete at Serenity Apartments, new Mission Hill luxury residences now leasing


Construction is complete at Serenity Apartments, a new 15-story luxury tower in Mission Hill featuring 195 distinctive residences now leasing. Move-ins at Serenity began earlier this month; the building was 40% pre-leased prior to opening. Churchill Corporate Housing, a short-term corporate housing provider, has leased 24 apartments at Serenity, which is managed by Greystar. Serenity is located steps to Brookline Village and the Longwood Medical Area and features the latest in-demand amenities, including Wi-Fi enabled common areas, a billiard room, meeting and collaborative areas, a private courtyard, a rooftop pool and lounge deck, a barbecue deck and a green roof. Direct-access garage parking with electric car charging stations is available on-site, in addition to Zipcars and bicycle storage. Serenity presents an unprecedented green living option, with LEED Gold energy-efficiency certification and direct access to the MBTA Green Line.


“As we designed the community, we knew we needed to create something special to draw tenants to this corridor from Fenway and other nearby neighborhoods,” said Anthony Nader, Vice President of Serenity developer Longwood Group. “The rooftop pool and amenity area are really something to be seen.” Serenity residents will be located in an area seeing tremendous growth, with a number of development projects planned, under construction and recently completed. “The leasing demand is showing that with a destination asset, that provides a great living experience, prospective residents are willing to move to this side of the Longwood Medical Area,” said Nader. “The growth coming down the Brookline Avenue corridor, with the Children’s Hospital expansion at Brookline Place, Homewood Suites and potentially an additional hotel at Brookline Avenue, has created an exciting area of the city to be in. More restaurants will activate the streetscape, but the neighborhood is already beginning to come alive.”


Proto
- Apr 20, 2017

Concrete superstructure rising at 88 Ames Street apartments in Kendall Square


Concrete is now being poured to construct the first floors of 88 Ames Street’s 22-story concrete superstructure and elevator core. A number of vertical concrete pillars have already been formed. Opening in 2018, 88 Ames Street will enliven Kendall Square with 280 apartment residences and 16,000 square feet of retail at the site of a former parking garage entrance. The following is a photograph of 88 Ames Street, courtesy Boston Properties:


Aerial View of 88 Ames Street (Courtesy Boston Properties)


Serenity Apartments
- Mar 26, 2017

Finishing touches underway at Serenity Apartments, opening this Spring in Mission Hill


Serenity Apartments’ 15-story facade is nearly fully installed, and interior fit-out of luxury apartments and common spaces is nearly complete. Just about all exterior finish panels and windows have been installed, and nearly the entire interior has been plastered. State-of-the-art finishes and appliances are now being installed in apartments and common spaces. Opening this Spring, Serenity Apartments will feature 195 apartments including studio, 1-, 2- and 3-bedrooms and amenities including a swimming pool, a fitness center and a green roof deck. The following are photographs of Serenity Apartments:


Serenity Apartments Photos


The Eddy
- Mar 16, 2017

Waterfront restaurant nears completion at East Boston’s The Eddy, luxury apartments now leasing


Interior fit out of Reel House, the upcoming 5,000 square foot waterfront seafood restaurant at The Eddy in East Boston, is nearly complete in advance of Reel House’s opening this Spring. Reel House will serve a “globally coastal seafood menu” and will feature a dining area with seating for over 200 people, two mahogany bars and a large outdoor patio. Sweeping views of the Boston skyline will be visible throughout the Reel House space.


Luxury apartment residences are now leasing at The Eddy. With unparalleled resident amenities including a top-floor roof deck with sweeping views, a second-floor pool deck with a fire pit and barbecues, a fitness center and a communal lounge space as well as the upcoming Reel House restaurant, The Eddy will conveniently enable a live, work and play lifestyle. For more information about leasing apartments at The Eddy and to schedule a private showing, please call 866-318-2748 or click Contact Broker above. The following are photographs of The Eddy and the upcoming Reel House restaurant:


The Eddy Photos


Proto
- Feb 20, 2017

Vertical construction begins at 88 Ames Street in Kendall Square


The first vertical concrete and steel columns have been installed as part of the first floor of 88 Ames Street, an upcoming 22-story residential and retail building in the heart of Kendall Square. Excavation of the building’s basement is complete; a 1-story deep sheet pile wall with temporary bracing is installed to support the basement throughout construction. Upon completion, 88 Ames Street will feature 280 apartment residences and 16,000 square feet of retail at the site of a former parking garage entrance. The following are photographs of 88 Ames Street:


88 Ames Photographs


The following is an aerial photograph of 88 Ames Street, courtesy Boston Properties:


Aerial View


The Eddy
- Feb 17, 2017

Reel House, globally-inspired waterfront seafood restaurant, opening at The Eddy in East Boston this spring


Reel House, a new waterfront restaurant featuring a "globally coastal seafood menu," will open this spring at The Eddy, the East Boston Waterfront's newest luxury building. Led by award-winning Executive Chef Marc Orfaly and owned by Navy Yard Hospitality Group, Reel House will serve a distinctive seafood menu with "a fusion of flavors" and "approachable plates" inspired by worldwide waterfront cuisines.


Designed by Sousa Design Architects, Reel House's 5,000 square foot waterfront space overlooking Boston Harbor will be open 7 days a week for lunch, brunch and dinner. The space will accommodate over 200 seated diners across a main dining room, 2 mahogany bars and a large outdoor patio facing the Boston skyline. A complimentary boat shuttle will connect Reel House and The Eddy to the Charlestown Navy Yard and Navy Yard Hospitality Group's Pier 6 waterfront restaurant. Visit ReelHouseBoston.com for more information about Reel House.


Luxury apartment residences are now leasing at The Eddy. In addition to the upcoming Reel House restaurant, Eddy residents have access to amenities including a top-floor roof deck with unparalleled views of the Boston skyline and Boston Harbor, a second-floor pool deck and more. Click "Contact Broker" above or call 617-561-9600 for more information about leasing apartments at The Eddy. The following are renderings of the Reel House restaurant space:


Reel House Renderings


South Bay Town Center
- Feb 02, 2017

South Bay Town Center structural framing rising


Structural framing for the cinema and precast parking garages at the upcoming 720,000 square foot mixed-use South Bay Town Center, opening 2018 in Dorchester, is rapidly rising. A new parking garage is 25% erected, and interior structural framing is being installed to construct individual cinema screening halls. Site work is underway to construct the project's residential component, with the construction team at work installing site utilities and removing excess soils in order to commence foundation work. The following is an aerial photograph of the South Bay Town Center site:



Serenity Apartments
- Jan 24, 2017

Serenity Apartments facade nearly complete, new drone footage released


Serenity Apartments’ facade is nearly fully fit out with exterior finish panels and windows in advance of the 15-story Mission Hill building’s opening this spring. Bricks are fully installed along the building’s base. Interior fit out of Serenity’s common spaces and 195 apartments and common spaces is well underway. New aerial drone footage of Serenity has been released:



The Eddy
- Jan 03, 2017

Fit out underway for waterfront restaurant opening Spring 2017 at The Eddy


Interior fit out work is underway for Navy Yard Hospitality Group and Chef Marc Orfaly’s waterfront destination restaurant opening Spring 2017 at the iconic new Eddy apartment building in East Boston. The restaurant will be located on The Eddy’s ground floor and will feature sweeping views of Boston Harbor and the Boston skyline. Open since Fall 2016, The Eddy features 258 luxury residential apartments with picturesque views. Call 855-534-3833 for information about leasing apartments at The Eddy. The following are photographs of The Eddy:


The Eddy Photos


South Bay Town Center
- Dec 06, 2016

South Bay Town Center foundation work underway


Concrete foundations are being installed for the future cinema and parking garages at the 720,000 square foot South Bay Town Center development in Dorchester. Across the South Bay Town Center site, which will host five new buildings on former surface parking lots, site work and utility installation are also underway. The 720,000 square foot mixed-use South Bay Town Center is expected to open in 2018. The following is an aerial photograph of the South Bay Town Center site:



Proto
- Nov 30, 2016

88 Ames foundation work underway


Foundation work is underway for 88 Ames, a 22-story mixed-use development in the heart of Kendall Square that will energize the site of a former parking garage entrance. J. Derenzo Companies is hard at work preparing the site for borehole drilling and superstructure erection. The construction team is now drilling large diameter boreholes that will reach down deep into the soil. Massive steel reinforcing cages are already on site and will be placed into the drilled holes and filled with concrete to form a drilled pile. The drilled piles will support the tower and retail podium above. The following are photographs of 88 Ames:


88 Ames Photographs


Serenity Apartments
- Nov 27, 2016

Serenity Apartments nearly fully sealed, new aerial footage released


Windows and exterior finish panels have been installed along a large section of Serenity Apartments’ facade as the building nears its’ Spring 2017 opening. At Serenity’s base, brick finishes have been just about fully installed. The construction team is now plastering Serenity’s apartments and installing interior finishes. HVAC utilities have been installed on Serenity’s roof and throughout the building. Serenity General Contractor Suffolk Construction has released two new aerial videos of Serenity, a new drone flyover and a time-lapse showing Serenity’s progression since the start of construction in Winter 2015:


New Drone Flyover


Time-lapse


The Eddy
- Nov 11, 2016

Enjoy luxurious waterfront living with sweeping skyline views at The Eddy


The Eddy, a luxurious new 258-unit waterfront apartment tower overlooking the Boston skyline, is now leasing. Eddy residents will enjoy amenities including a waterfront resident lounge graced with exquisite artwork, a panoramic furnished roof deck and sweeping skyline views from every corner. A new waterside restaurant will open at The Eddy in Spring 2017. Call 855-534-3833 for more information about leasing apartments at The Eddy and to schedule a tour of the building. The following are photographs of the Eddy roof deck:


The Eddy Roof Deck Views


The following are photographs of an apartment at The Eddy:


The Eddy Unit


The following are photographs of amenities at The Eddy:


The Eddy Amenities


The following are exterior photographs of The Eddy:


The Eddy Exterior


Serenity Apartments
- Nov 03, 2016

New Serenity aerial footage released, finish installation underway


Suffolk Construction has released new aerial footage of Serenity, a 195-unit apartment building with 2,100 square feet of retail opening Spring 2017 in Mission Hill. Exterior finish panel installation is well underway, and moisture-resistant cladding is fully installed along the building’s frame. Per an update by Prellwitz Chilinski Architects, interior unit finishing is underway on lower level units. Steel framing is being installed on upper floors to lay out units. The following is the latest aerial footage of Serenity, courtesy Suffolk Construction:



Serenity Apartments
- Sep 30, 2016

Serenity website released with new renderings and drone footage, apartments opening Spring 2017


Developer Longwood Group and Property Manager Greystar have released a new website, TheSerenity.com, for Serenity, a 195-unit residential apartment building with 2,100 square feet of ground-floor retail opening Spring 2017 in Mission Hill. Per the website, Serenity will feature studio, one-bedroom, two-bedroom and three-bedroom residences. 24 residences overlooking Olmsted Park will feature private elevator access. With the website, new interior renderings of Serenity and a building logo have been released along with drone footage of the under-construction building. Renderings of Serenity and additional information can be found above; the following is the drone footage video:



Serenity Apartments
- Sep 25, 2016

Serenity exterior finish installation underway


Exterior finishes have reached the top level of Serenity's 15-story frame and are installed along a large frame section. Concrete has been poured on nearly all floors, and framing of interior units is underway.


Located in Mission Hill overlooking the Emerald Necklace, Serenity will feature 195 rental residential apartments and a 2,100 square foot retail space fronting South Huntington Avenue. Amenities at Serenity will include a swimming pool, a fitness center and a green roof deck. The following are photographs of Serenity, courtesy Newman Associates:


Serenity Photos September 2016


The Eddy
- Aug 22, 2016

The Eddy, opening September on the East Boston Waterfront, ready to welcome residents


The Eddy, a 16-story, $135 million mixed-use tower on the East Boston Waterfront, is ready to welcome its first residents this coming month. Visit the Eddy website for residential leasing information. The Eddy will feature 258 studio, one and two-bedroom residences with a ground-floor waterfront destination restaurant operated by Navy Yard Hospitality Group and Chef Marc Orfaly. State-of-the-art residential unit finishes are designed in keeping with the building’s waterfront location, with blue kitchen tiles, an open floor plan and oversized windows throughout. With sweeping harbor and skyline views from every corner, and a particularly breathtaking vista from the top-floor communal roof deck, The Eddy is a uniquely positioned offering that is sure to be a great place to call home.


Matt Edlen, Director of Acquisitions and Development at Gerding Edlen, sees being able to invite people to experience the East Boston neighborhood as “a tremendous opportunity.” In addition to “very cool, show-stopping” water views that will be “a huge part” of the Eddy resident experience, explains Edlen in an interview with BLDUP, East Boston is “contextually is not the same [experience] you would find in Back Bay or downtown,” with unique culture, art and food and an inherent sense of community. Kelly Saito, a Partner at Gerding Edlen, notes in an interview with BLDUP that while East Boston “seems distant across [Boston Harbor], it is actually really well connected.” With Downtown Boston one subway stop away, Saito notes, East Boston is a “very viable place to live for downtown workers” that is close to, but outside of, downtown and surrounded by water, parks and beaches. “The most unique thing about [The Eddy] is the views,” explains Saito, but “the biggest surprise will be its’ convenience.”


The following are photographs of views from The Eddy’s top-floor roof deck:


The Eddy Views


The following are photographs of the Eddy building:


The Eddy Building


The following are photographs of a unit at The Eddy:


The Eddy Unit


The following are photographs of the pool deck at The Eddy:


The Eddy Pool Deck


The following are photographs of the Harborwalk and waterfront park at The Eddy:


The Eddy Harborwalk and Public Park


Proto
- Aug 05, 2016

Initial garage demolition complete at 88 Ames in Kendall Square


J. Derenzo Companies’ JDC Demolition division has demolished the section of the existing East Garage in Kendall Square on which 88 Ames, a 22-story mixed-use tower containing 280 residential units and 16,000 square feet of retail space, will be built. The section of the parking garage which will be retained has been sealed off with wood panels, clearing the way for foundation and superstructure construction at the 88 Ames site. Along Ames Street, utility work is underway to prepare for tower construction. The following are photographs of the 88 Ames site:


88-Ames-4
Utility work on Ames Street with sealed garage section in background


88-Ames-6
JDC Demolition rigs


88-Ames-3
88 Ames site


88-Ames-2
JDC Demolition rig


88-Ames-1
View of sealed garage section


More information about 88 Ames is posted below.


Serenity Apartments
- Jul 21, 2016

Serenity apartment tower in Mission Hill tops off


We had the honor and privilege of attending the official Serenity topping off ceremony this past Monday, July 11th. We would like to extend huge congratulations and thanks to Longwood Group on this important milestone. Serenity will further enliven Mission Hill with 195 new residential rental apartments and approximately 2,100 square feet of ground-floor retail space. Amenities at Serenity will include a swimming pool, a fitness center and a green roof deck. Serenity will be LEED Silver certified and is anticipated to open in Spring 2017. Greystar will be Serenity's property manager.


The following is a link to an official press release announcing Serenity's topping off. The following are renderings of Serenity. Serenity's architect is Prellwitz Chilinski Associates, and the building's interior designer is RD Jones + Associates.


Serenity Apartment_Rendering_CWDG_Nickerson
View of Serenity from Emerald Necklace (Courtesy Prellwitz Chilinski Associates/Longwood Group)


Serenity Apartment_Rendering_Interior2
Serenity common space (Courtesy RD Jones + Associates/Longwood Group)


Serenity Apartment_Rendering_Interior1
Serenity common space (Courtesy RD Jones + Associates/Longwood Group)


Prior to speeches, ceremony attendees were given the opportunity to sign the final steel beam of Serenity’s frame.


Serenity-Beam-Signing-1
Construction team members sign final steel beam


Serenity-Beam-Signing-2
Signed final beam


Serenity-Beam-Signing-3
Members of the Nader family of Longwood Group


Serenity-Beam-Signing-4
Ceremony prior to speeches


Speakers at the Serenity topping-off ceremony included Serenity Project Manager Ralph Cole, Mission Hill Main Streets Executive Director Richard Rouse, Longwood Group Principal Tony Nader, Suffolk Construction Vice President and Chief Operating Officer Jim Grossman and Boston Redevelopment Authority Executive Director Brian Golden.


Serenity-Speeches-1
Serenity Project Manager Ralph Cole


Serenity-Speeches-2
Mission Hill Main Streets Executive Director Richard Rouse


Serenity-Speeches-3
Longwood Group Principal Tony Nader


Serenity-Speeches-4
Suffolk Construction Vice President and Chief Operating Officer Jim Grossman


Serenity-Speeches-5
Boston Redevelopment Authority Executive Director Brian Golden


Serenity-Speeches-6
Speeches stage


Serenity-Speeches-7
Serenity branding


Speeches were followed by the raising and installation of the final steel beam of Serenity’s frame.


Serenity-Beam-Raising-1
Construction workers prepare to raise the final steel beam


Serenity-Beam-Raising-2
Final steel beam prior to raising


Serenity-Beam-Raising-3
Raising of final steel beam


Serenity-Beam-Raising-4
Raising of final steel beam


Serenity-Beam-Raising-5
Installation of final steel beam


Serenity-Beam-Raising-6
Installation of final steel beam


Serenity-Beam-Raising-7
Installed final steel beam


Serenity-Beam-Raising-8
Frame prior to final steel beam installation


Serenity-Beam-Raising-9
A drone monitors final steel beam raising


Work will now commence upon installation of Serenity’s exterior and interior finishes. A construction elevator is being installed to lift workers, equipment and materials throughout Serenity’s frame. Framing for installation of insulation and moisture-resistant cladding is being installed along the frame's exterior.


Serenity-Frame-1
View of Serenity along Huntington Avenue


Serenity-Frame-2
Construction elevator installation underway


Serenity-Frame-3
A worker installs framing along Serenity's frame's exterior


Serenity-Frame-4
Construction materials staged inside Serenity's frame


Serenity-Frame-5
View of Serenity along Huntington Avenue


Serenity-Frame-6
View of Serenity along Huntington Avenue


More information about Serenity is posted below.


Serenity Apartments
- Jun 27, 2016

Steel frame rising at Serenity


Serenity’s concrete foundation is complete, and construction of the building’s steel frame is well underway. The construction team is using a tower crane to raise and install the frame’s structural elements. The section of Serenity bordering Jamaicaway has risen to the fifth floor, which will be the top floor for that section. Along South Huntington Avenue, frame construction will continue until the frame tops off at 15 stories tall. Serenity will be a 195-unit residential apartment tower with 2,100 square feet of retail.


Serenity-at-105A-South-Huntington-3
View from South Huntington Avenue

Serenity-at-105A-South-Huntington-7
View from Jamaicaway

Serenity-at-105A-South-Huntington-13
Tower crane

Serenity-at-105A-South-Huntington-1
Foundation and steel I-beam frame

Serenity-at-105A-South-Huntington-10
View from Jamaicaway

Serenity-at-105A-South-Huntington-2
View from South Huntington Avenue

Serenity-at-105A-South-Huntington-4
View from South Huntington Avenue

Serenity-at-105A-South-Huntington-12
Construction materials


J. Derenzo Companies continues to perform excavation and utility work at Serenity’s base.


Serenity-at-105A-South-Huntington-8
J. Derenzo Companies backhoe alongside steel frame

Serenity-at-105A-South-Huntington-11
J. Derenzo Companies excavation rig under the building

Serenity-at-105A-South-Huntington-9
J. Derenzo Companies backhoe

Serenity-at-105A-South-Huntington-6
View from Jamaicaway

Serenity-at-105A-South-Huntington-5
Substructure and J. Derenzo Companies excavation rig


More information about Serenity is posted below.


Proto
- May 22, 2016

J. Derenzo Companies breaks ground at 88 Ames Street


J. Derenzo Companies recently broke ground at 88 Ames Street in Kendall Square and has begun work on installation and improvement of sewage and utilities for the new 22-story mixed-use tower. The tower will contain approximately 280 rental apartments and 16,000 square feet of ground-floor retail.


Work underway along Ames Street


Utility installation by J. Derenzo Companies


Excavation by J. Derenzo Companies in preparation for utility installation


Materials including manhole caps and pipes are staged at 88 Ames Street for upcoming installation. Work is also underway to reinforce the existing parking garage for construction of the adjacent tower. The garage will be partially demolished to make way for the tower.


A J. Derenzo Companies excavator alongside materials for utilities construction


J. Derenzo Companies excavators alongside materials for utilities construction


Pipes staged for utilities installation


Manhole covers staged for utilities installation


A groundbreaking ceremony for 88 Ames Street was held on April 14th, 2016. A live webcam has been installed with a live stream of construction activity at 88 Ames Street. The following is a link to the live webcam.


More information about 88 Ames Street is posted below.


South Bay Town Center
- May 13, 2016

South Bay Town Center approved for construction


The Boston Redevelopment Authority approved South Bay Town Center for construction at last night's board meeting. Located in Dorchester at the existing South Bay Center shopping mall, the 720,000 square foot mixed-use development project will include approximately 475 residential units, 120,000 square feet of retail space, a 60,000 square foot cinema and a 130-room hotel. Construction of South Bay Town Center could start in the third quarter of 2016.


A rendering of South Bay Town Center is posted above. More information about South Bay Town Center is posted below.


Serenity Apartments
- Feb 26, 2016

Excavation and foundation work underway at Serenity


J. Derenzo Companies is at work performing excavation and foundation work to prepare the Serenity site for tower construction. Much of the tower's foundation has already been excavated; S&F Concrete is pouring concrete along the excavated foundation. Suffolk Construction is managing Serenity's construction. Serenity will feature 195 apartments and a 2,100 square foot retail space in the heart of Mission Hill along the Emerald Necklace park.


Serenity-105A-South-Huntington-Mission-Hill-Jamaica-Plain-Cedar-Valley-Development-LLC-Longwood-Group-Prellwitz-Chilinski-Associates-Suffolk-Construction-J-Derenzo-Company-S-F-Concrete-1
View of Serenity construction site


Serenity-105A-South-Huntington-Mission-Hill-Jamaica-Plain-Cedar-Valley-Development-LLC-Longwood-Group-Prellwitz-Chilinski-Associates-Suffolk-Construction-J-Derenzo-Company-S-F-Concrete-2
View of foundation construction and concrete pouring underway


Serenity-105A-South-Huntington-Mission-Hill-Jamaica-Plain-Cedar-Valley-Development-LLC-Longwood-Group-Prellwitz-Chilinski-Associates-Suffolk-Construction-J-Derenzo-Company-S-F-Concrete-3
View of excavation underway


Serenity-105A-South-Huntington-Mission-Hill-Jamaica-Plain-Cedar-Valley-Development-LLC-Longwood-Group-Prellwitz-Chilinski-Associates-Suffolk-Construction-J-Derenzo-Company-S-F-Concrete-4
J. Derenzo Companies excavator


Serenity-105A-South-Huntington-Mission-Hill-Jamaica-Plain-Cedar-Valley-Development-LLC-Longwood-Group-Prellwitz-Chilinski-Associates-Suffolk-Construction-J-Derenzo-Company-S-F-Concrete-5
Concrete poured along foundation


Serenity-105A-South-Huntington-Mission-Hill-Jamaica-Plain-Cedar-Valley-Development-LLC-Longwood-Group-Prellwitz-Chilinski-Associates-Suffolk-Construction-J-Derenzo-Company-S-F-Concrete-6
J. Derenzo Companies bobcat vehicle


Serenity-105A-South-Huntington-Mission-Hill-Jamaica-Plain-Cedar-Valley-Development-LLC-Longwood-Group-Prellwitz-Chilinski-Associates-Suffolk-Construction-J-Derenzo-Company-S-F-Concrete-7
J. Derenzo Companies vehicles


Serenity-105A-South-Huntington-Mission-Hill-Jamaica-Plain-Cedar-Valley-Development-LLC-Longwood-Group-Prellwitz-Chilinski-Associates-Suffolk-Construction-J-Derenzo-Company-S-F-Concrete-8
Freshly poured concrete foundation


Serenity-105A-South-Huntington-Mission-Hill-Jamaica-Plain-Cedar-Valley-Development-LLC-Longwood-Group-Prellwitz-Chilinski-Associates-Suffolk-Construction-J-Derenzo-Company-S-F-Concrete-9
Excavation underway


Serenity-105A-South-Huntington-Mission-Hill-Jamaica-Plain-Cedar-Valley-Development-LLC-Longwood-Group-Prellwitz-Chilinski-Associates-Suffolk-Construction-J-Derenzo-Company-S-F-Concrete-10
View of construction site


Serenity-105A-South-Huntington-Mission-Hill-Jamaica-Plain-Cedar-Valley-Development-LLC-Longwood-Group-Prellwitz-Chilinski-Associates-Suffolk-Construction-J-Derenzo-Company-S-F-Concrete-11
Foundation work underway


Serenity-105A-South-Huntington-Mission-Hill-Jamaica-Plain-Cedar-Valley-Development-LLC-Longwood-Group-Prellwitz-Chilinski-Associates-Suffolk-Construction-J-Derenzo-Company-S-F-Concrete-12
Foundation work underway


Serenity-105A-South-Huntington-Mission-Hill-Jamaica-Plain-Cedar-Valley-Development-LLC-Longwood-Group-Prellwitz-Chilinski-Associates-Suffolk-Construction-J-Derenzo-Company-S-F-Concrete-13
View along Huntington Avenue


The Eddy
- Feb 19, 2016

Ten New's facade is just about complete. Interior work continues to progress on the 16-story building's apartments, resident amenities and ground-floor commercial space. Located on Boston Harbor, Ten New residents will enjoy sweeping views of the downtown Boston skyline. Ten New's ground floor is anticipated to house a waterfront restaurant.


The Eddy February 2016


The Eddy
- Jan 15, 2016

Exterior finishes and glass are just about fully installed at Ten New!

   

   


Serenity Apartments
- Jan 15, 2016

Work starting at Serenity


Suffolk Construction has begun work at Serenity! Concrete will be poured next week:

Beginnings of our Serenity 105 Apartments project...concrete pour coming next week! #Boston #construction #jamaicaplain

A photo posted by Suffolk Construction (@buildsmart) on Jan 12, 2016 at 1:06pm PST


The Eddy
- Nov 16, 2015

We stopped by the 6-26 New Street, since officially named Ten New, construction site and were excited to see that installation of finishes had progressed significantly! We were able to gain a closeup view of the finishes as they were delivered on street level; see our photographs above. Ten New was officially topped off on Friday, November 13th; congrats to Gerding Edlen, Suffolk Construction and all involved!

   

   


The Eddy
- Nov 09, 2015

We stopped by 6-26 New Street last week and were thoroughly impressed. The building has grown significantly and appears just about ready to top off. Finishes and windows are also beginning to be installed on the building's ground floors. With its added height, 6-26 New Street is now visible from all around, throughout East Boston as well as from downtown Boston.

   

   


Lee Peters RA
- Nov 06, 2015

Our site photographs of 660 Ocean Avenue at Waterfront Square from our tour last week are posted above. Learn more about the Waterfront Square development at our Waterfront Square project page.


Serenity Apartments
- Oct 24, 2015

Start of construction imminent at 105A South Huntington


Start of construction at 105A South Huntington appears imminent as the project's official status was changed yesterday, 10/23/2015, to "Under Construction" on the Boston Redevelopment Authority (BRA)'s website. The status change is shown on the BRA's project page for 105A South Huntington.


The Eddy
- Oct 01, 2015

We stopped by 6-26 New Street on the East Boston Waterfront recently. Construction is progressing smoothly. We are excited to watch this game-changing development continue to take shape!

   

   


The Eddy
- Apr 30, 2015

We stopped by 6-26 New Street recently. Construction appeared to be actively progressing. At the time, demolition of the structurally unsound nine-story building was not yet approved. (The Boston Redevelopment Authority approved the new development plans on April 16th, 2015.) The tallest building shown on site is the nine-story building that would have been renovated along with a seven-story height addition. Both buildings shown in our site photos will now be demolished, and new ones will be built in their stead.

   

   