• Helical faneuil04
  • Helical hartford101415 004
  • S boston102615 071

Totals

Total Square Footage 4735812
Total Dollar Volume $ 549,500,000

General

Established 1986
Employees 50
Website http://helicaldrilling.com/
Phone Number 781-848-2110

Description

Helical Drilling is a geotechnical design/build contractor focused on providing innovative, efficient and adaptable geotechnical engineering and ground construction solutions to general contractors, owners, and engineers throughout the Northeastern United States. Helical is an ENR Top 600 Specialty Contractor specializing in Geopier® Rammed Aggregate Pier® ground improvement, earth retention, grouting, deep foundations, and piles, underpinning and additional geotechnical construction solutions.

Email: info@helicaldrilling.com

Updates

AVA North Point
- Jul 11, 2018

Phase II Complete at Ava North Point

Callahan Construction Managers has completed construction on Phase II of AVA North Point in Cambridge. The 265 total unit luxury buildings (2), developed by AvalonBay Communities, features a mix of studio, one, two, and three bedroom residences. Resident amenities include a 24hr fitness center, gaming lounge, pool, elevated courtyard, pet spa, and a bike workshop with a unique DIY space.

The distinct apartments exterior was designed by Kyu Sung Woo Architects Inc. with CUBE 3 Studio designing the interior units. Most feature sliding barn doors, gear walls, utility charging stations, and chalkboard walls. In addition, the apartments include stainless steel appliances, granite countertops, in-unit laundry, and are designed for LEED Silver sustainability.

Callahan's work on the six-story, wood framed building also includes 3,000 square-feet of retail space on the ground floor and three levels of underground parking. AVA North Point is ideally situated less than a 5 minute walk from the Lechmere MBTA station and just one mile from Boston.


Montaje
- Jul 02, 2018

Callahan completes 20-story Montaje luxury apartment tower at Assembly Row in Somerville

Callahan Construction Managers has completed Montaje for Federal Realty Investment Trust. The 768,000-square-foot luxury apartment and retail development, located at the heart of Assembly Row in Somerville, features a landmark 20-story, 236-foot-tall tower and a 77-foot-tall, six-story, wood framed building. Designed by Stantec, Montaje features 447 studio, one-bedroom, two-bedroom and three-bedroom residences that are outfitted with luxurious finishes, including quartz countertops and stainless steel appliances.

At Montaje’s summit is a top-floor Sky Lounge featuring striking views of Boston and the nearby Mystic River. The Sky Lounge includes an outdoor roof deck, a chef’s kitchen, a dining area and a media/living room. A second, lower level courtyard features grilling stations, a bocce court and an outdoor fireplace. Additional Montaje amenities include a resort-style swimming pool, a fitness center with a yoga studio, artist space, a resident lounge featuring a billiards table and a meeting room. A seven-story precast parking garage with space for 650 cars has also been constructed on site.

On Montaje’s ground floor is 40,000 square feet of retail, home to multiple shops, restaurants and bars including MidiCi Pizza, Ann Taylor Factory Shop, Yankee Candle, Fragrance Outlet, Columbia Sportswear Company, Mass General Hospital and American Fresh Brewhouse. Montaje is located next to the Assembly MBTA Orange Line station and minutes from Interstate 93, offering a short commute to Downtown Boston and Cambridge by transit or car.





75 Moulton Street
- Apr 20, 2018


Invesco Acquires 75 Moulton Street in Cambridge 

Dallas-based Invesco Real Estate has acquired the property at 75 Moulton Street in Cambridge for $17.95 million. The site features a newly renovated 37,500-square-foot lab and R&D building with state of the art lab infrastructure. The building is located within Fresh Pond Technology Park near the Alewife MBTA Red Line station. 


South Bay Town Center
- Apr 01, 2018

Exterior Work at South Bay Town Center

Exterior framing and drywall are going up at South Bay Town Center as they aim for a summer 2018 opening. The project will include approximately 475 residential units, 120,000 square feet of retail space, a 60,000 square foot cinema and a 130-room hotel. A total of five new buildings will be built. South Bay Town Center will be pedestrian-oriented, with active ground-floor uses and open spaces.







AVA North Point
- Feb 26, 2018

Finishing touches underway at AVA North Point luxury apartments in East Cambridge, built by Callahan Construction Managers


The exterior facade of AVA North Point, a new six-story, wood framed, 265-unit luxury apartment community, has been completed. The complex, developed by AvalonBay Communities and built by Callahan Construction Managers, is set to open this summer. In addition to the façade completion, finishes are currently being installed within apartments that include granite countertops, stainless steel appliances, hard surface flooring and in-unit washers and dryers. Common spaces, including lounges, a fitness center, landscaped elevated courtyards and a swimming pool are also being fit out.


AVA North Point will feature studio, one-, two- and three-bedroom apartments, efficiently designed to LEED Silver sustainability specifications. The community will also include a 3,000-square-foot ground-floor retail space and three levels of underground parking. AVA North Point is located steps from the Lechmere MBTA Green Line station, Kendall Square and the 45-acre, 4.5-million-square-foot Cambridge Crossing development, soon to be home to the North American headquarters of global healthcare technology leader Philips. The following is a photograph of AVA North Point:



Meriel Marina Bay
- Jan 25, 2018

Callahan completes Meriel Marina Bay luxury apartments on Quincy waterfront


Callahan Construction Managers has completed Meriel Marina Bay, a 352-unit luxury apartment community located on the Quincy waterfront overlooking Boston Harbor. Meriel Marina Bay, developed by Hines, features studio to three-bedroom apartments available for immediate lease, and also includes a new extension of the Marina Bay public waterfront with 20,000 square feet of retail space.


Residences at Meriel Marina Bay feature open layouts and luxurious finishes such as oversized windows, wide plank flooring and kitchens with stainless-steel appliances, center islands with breakfast bars, quartz countertops and European-style soft-close cabinets. Many apartments are equipped with oversized balconies or private patios. Resident amenities at Meriel Marina Bay include four elevated courtyards featuring fire pits, barbeque grills, wet bars and deck swings, a heated outdoor swimming pool, a club room with lounge seating, a catering kitchen and a fitness center.


Sweeping views of Boston Harbor and the Boston skyline are visible throughout Meriel Marina Bay. Both of the developments’ buildings structural frames include five stories of wood above a base two-level steel podium that contains a total of 500 garage parking spaces, in addition to indoor storage for bikes, paddle boards and kayaks. Meriel Marina Bay is conveniently located near Downtown Boston and Interstate 93. The community is also adjacent to Squantum Point Park, which features a two-mile Riverwalk trail and beaches. The following is a photograph of Meriel Marina Bay:


Meriel Marina Bay Aerial


Coppersmith Village
- Jan 10, 2018

Coppersmith Village apartments on East Boston Waterfront top off, condominium foundation work underway


Coppersmith Village’s two multifamily buildings along Border Street, which will feature 56 rental apartments located steps from the East Boston Waterfront, have topped off at five stories tall. Along Liverpool Street, the foundation of 15 ownership condominium townhouses are being constructed. Green Zip R sheathing has been fully installed along the multifamily buildings’ facades, and exterior balconies have been framed. Installation of the multifamily buildings’ windows is expected to begin imminently, and roofing work is nearing completion. Once the multifamily buildings are sealed, interior finishing work will be able to commence. Construction of the townhouses’ wooden structural frames is expected to begin later this month. The following are photographs of Coppersmith Village:


Coppersmith Village Photos


Peterborough Apartments
- Jan 02, 2018

New-construction Peterborough Apartments in Fenway open to residents


Peterborough Apartments, a new-construction Fenway residential building featuring 20 apartments, has opened to residents. The building’s apartments feature luxurious finishes such as hardwood flooring, granite kitchen and bath countertops, stainless steel appliances and video intercom systems. A total of 12 garage parking spaces are located on site. Peterborough Apartments is located steps from the Emerald Necklace park, Fenway Park and the shops and restaurants of the Fenway and Back Bay neighborhoods. The following are photographs of Peterborough Apartments:


Peterborough Residences Photos


RE150
- Nov 29, 2017

Callahan completes new-construction RE150 apartments along Mystic River in Medford


Callahan Construction Managers has completed RE150, a 282-unit new-construction luxury apartment complex along the Mystic River in Medford, the latest residential building at the 30-acre Rivers Edge mixed-use development. Located at 150 Rivers Edge Drive, RE150 features desirable amenities including a clubhouse, a fitness center, a swimming pool and outdoor entertainment areas such as two private courtyards and green space overlooking the Mystic River. On RE150’s ground floor is 18,200 square feet of retail and restaurant space, which could soon be home to a full-service bar/restaurant and specialty/convenience retailers, as well as vehicle parking.


RE150 features two five-story buildings constructed with four-stories of wood framing above one-story steel podiums. The buildings are wrapped around an above-grade precast concrete parking garage, with a total of 1,042 parking spaces.


RE150 is located across from 100 Rivers Edge Drive, the first residential building at Rivers Edge, which features 222 apartments and was completed in 2009. RE150 is located a short distance from the Wellington MBTA Orange Line station and Interstate 93, minutes from Downtown Boston and Cambridge. Apartments and retail space at RE150 are now available for lease. The following are photographs of RE150:


RE150 Photos


170 West Broadway
- Nov 13, 2017

KEMS Corporation completes 170 West Broadway luxury residences, now on sale in South Boston


KEMS Corporation has completed installation of high-end finishes throughout 170 West Broadway's facade and 33 one- and two-bedroom luxury condominium residences, a few of which remain for sale, and the building is now ready to welcome its’ first residents. The building’s 5,000-square-foot ground-floor retail space, which is available for lease, is now fully glassed in.


Located in the heart of South Boston steps from the South End, the Seaport District and Downtown Boston, 170 West Broadway's exclusive, new-construction residences feature amenities including top-grade appliances, hardwood floors, high ceilings, an intercom service and secure garage parking on site. Eight penthouse residences at 170 West Broadway feature private rooftop decks.


Please click Contact Broker above, or email info@bldup.com, for more information about available residences and retail space at 170 West Broadway. The following are photographs of 170 West Broadway:


170 West Broadway Photos


99 Tremont Street
- Oct 19, 2017

BPDA approves switch from apartments to condominiums for 99 Tremont Street


The Boston Planning & Development Agency (BPDA) has given Saracen Properties approval to market 62 newly constructed residences at 99 Tremont Street in Brighton as condominiums, as opposed to apartments as originally approved. Eight condominiums at 99 Tremont Street will be designated affordable. Saracen’s decision to switch 99 Tremont Street to condominiums from apartments comes in light of the Allston-Brighton condominium market’s strong recent performance, including the 85-unit Telford 180 new-construction condominiums selling out pre-completion. A number of new condominium buildings have since been proposed for Allston-Brighton, including 46 units at 46 Hichborn Street and 82 units at 70 Leo M. Birmingham Parkway.


Boston East
- Sep 28, 2017

Pre-leasing underway at Boston East apartments on East Boston Waterfront, opening this Fall


Pre-leasing has begun at the 200-unit Boston East new-construction apartment development opening this Fall on the East Boston Waterfront, which will feature studio, 1- and 2-bedroom apartments with rents starting at $1,950/month. Studios at Boston East range from $1,950 to $2,250 per month, 1-bedrooms begin at around $2,200 and cap out at about $2,800 per month, 2-bedrooms range from just under $3,100 to about $3,700 per month and 3-bedrooms can be rented starting at $4,800 per month. 1-, 2-, and 3-bedroom loft-style apartments range from about $2,400 to just over $5,000 per month. Boston East apartments feature luxurious amenities including patios and balconies in select apartments, quartz countertops, hardwood flooring and oversized windows, with sweeping views of Boston Harbor throughout. Communal amenities include a top floor lounge and terrace, a courtyard with a fire pit and lounge areas, a state-of-the-art fitness center and on-site parking. The latest renderings of Boston East are posted above.


South Bay Town Center
- Sep 20, 2017

Edens acquires junk company site at gateway to South Bay Town Center development for $3.6 million


Edens, developer of the $200 million, 720,000-square-foot South Bay Town Center project in Dorchester, has acquired the 0.2-acre site of the Lenox Junk Company, located at the future gateway to South Bay Town Center, for $3.6 million. The parcel, located at 1170 Massachusetts Avenue at the corner of Allstate Road, presents an unprecedented opportunity for Edens to construct an engaging, appropriate gateway for South Bay Town Center, a pedestrian-oriented development which will feature approximately 475 residential units, 120,000 square feet of retail space, a 60,000 square foot cinema and a 130-room hotel. 1170 Massachusetts Avenue’s seller is Core Investments, who acquired the site for $900,000 in May 2013. Core Investments is currently developing the nearby $400 million, 735,000-square-foot Washington Village mixed-use development in South Boston’s Andrew Square.


South Bay Town Center
- Sep 14, 2017

Helical Drilling provides ground improvement solution at South Bay Town Center development in Dorchester


Helical Drilling has completed ground improvement at the 720,000-square-foot South Bay Town Center mixed-use development in Dorchester. Ground improvement was necessitated by South Bay's geotechnical composition of unstable urban fill, including up to 15 feet of loose-to-medium dense granular fill with ash, slag, cinders, and brick underlain by up to 10 feet of soft organic silt and followed by medium dense sand and gravel. In order to strengthen the soil, Helical Drilling installed Geopier® Rammed Aggregate Pier® Elements (RAPs), providing both spread footing support and slab-on-grade support. GeoConcrete® Column Rigid Inclusions (GCCs) were used in areas with thicker organic deposits and high footing bearing pressures.


Upon completion in 2018, the 10-acre South Bay Town Center will feature 475 apartment residences, 120,000 square feet of retail space, a 60,000-square-foot AMC cinema, a 130-room addition to the existing Holiday Inn Express hotel and three precast concrete parking garages. The following are photographs of ground improvement underway at South Bay Town Center, courtesy Helical Drilling:


South Bay Town Center Photos


Coppersmith Village
- Aug 28, 2017

Foundation work nearing completion at East Boston’s Coppersmith Village, featuring rammed aggregate piers installed by Helical Drilling


The foundation of Coppersmith Village, a $33 million mixed-use development in East Boston featuring 71 residences and approximately 3,000 square feet of ground-floor retail, is nearing completion, with Helical Drilling about to complete installation of Geopier® Rammed Aggregate Pier® (RAP) elements in the development’s soil. RAP elements reinforce unsuitable soils, providing an improved subgrade in order to support conventional shallow footings and slab-on-grade floor loads. RAPs are particularly suitable for sites with caving soils, contaminated soils and/or shallow groundwater and provide enhanced stiffness of relatively soft soil layers, making RAPs an optimal choice to reinforce foundations of development projects built on sections of Boston, for instance the East Boston Waterfront, which were constructed through land-making with urban fill. RAP installation also generates little to no excess spoils and eliminates the need for casing or dewatering.


The foundation of Coppersmith Village’s south mixed-use building is complete; the building’s first-floor steel podium has been erected, and elevator shafts are about to top off at five stories tall. The south building’s concrete foundation base slab will be poured in mid-September, after which the top four floors will be framed with wood. Coppersmith Village's north mixed-use building’s foundation has been 80%-installed, and elevator shaft erection has begun. The north building’s steel podium will be erected starting the first week of September. Helical Drilling has completed installation of RAPs in the foundations of both mixed-use buildings, which are located along Border Street, and will install RAPs in the future foundation of Coppersmith Village’s 15 townhouse residences, which will be located along Liverpool Street, starting the first week of September. The following are photographs of Coppersmith Village, courtesy Tocci Building Corporation:


Coppersmith Village Photos (Courtesy Tocci Building Corporation)


Boston East
- Aug 24, 2017

Boston East apartments facade nears completion, interior finishing underway


Nearly all brick and metal panel exterior finishes have been installed along the six-story facade of Boston East, an upcoming 200-unit luxury apartment building situated on the East Boston Waterfront. Boston East's exterior has been fully fireproofed, and all windows are in place. Inside the building, installation of luxurious reisdence and common space finishes is well underway. Boston East is expected to open this Fall. As part of the project, a new Harborwalk extension and public open space will be constructed along the waterfront. The following are photographs of Boston East:



Meriel Marina Bay
- Aug 22, 2017

Ribbon cut on newly completed Meriel Marina Bay luxury apartments, and Marina Bay boardwalk expansion, on Quincy waterfront


A ribbon cutting ceremony was held Saturday, August 12th for the newly completed Meriel Marina Bay luxury apartments on the Quincy waterfront, and the associated expansion of the Marina Bay boardwalk. The boardwalk’s size has been nearly doubled as part of Meriel Marina Bay’s development, creating new publicly-accessibly waterfront space and retail. Meriel Marina Bay features two five-story buildings featuring 352 studio, one-, two- and three-bedroom residences and 20,000 square feet of ground-floor retail, with resident amenities including a fitness center, three elevated courtyards, a swimming pool and on-site garage parking. Breathtaking views of Boston Harbor and the Boston skyline are visible throughout Meriel Marina Bay. Over 25% of apartments at Meriel Marina Bay are leased following the launch of leasing last Spring; apartments are now available for lease.


Meriel Marina Bay is the latest addition to Quincy’s thriving Marina Bay neighborhood, located a short drive, transit trip or boat ride to Downtown Boston. “The expansion of the Marina Bay boardwalk is a truly meaningful milestone in our work to complete the Meriel Marina Bay community and further enhance the many wonderful aspects of this neighborhood,” said Hines Managing Director Michael Francis in a prepared statement. “The new boardwalk and new retail spaces will provide additional opportunities to complement the already thriving mix of retail offerings along the waterfront and provide both locals and visitors with added space to enjoy the unique benefits of this waterfront neighborhood.”


Meriel Marina Bay complements Quincy’s recent resurgence, with hundreds of thousands of square feet of new housing and commercial space currently under development and recently completed. “Our city has experienced an ongoing positive evolution across all neighborhoods over the last number of years with the steady addition of new businesses and residents proud to call Quincy home,” said Quincy Mayor Thomas P. Koch in a prepared statement. “Marina Bay has particularly continued to thrive as a destination where residents and visitors alike come to live, work and play, and I’m thrilled to see the continued growth of this community with the expansion of the boardwalk through the construction of Meriel Marina Bay.”


Holiday Inn Chelsea
- Aug 20, 2017

Helical Drilling completes ground improvement at future site of Holiday Inn along Mill Creek in Chelsea


Helical Drilling has completed installation of Geopier GeoConcrete Columns (GCCs), rigid inclusion ground improvement elements that enhance unsuitable soil conditions, at the future site of a Holiday Inn hotel opening in late 2018 along Mill Creek in Chelsea. The high-stiffness columns were installed to depths of 60 feet, strengthening the site’s soil in order to allow for conventional shallow footing and slab-on-grade foundation construction.


Use of GCCs is ideal for sites such as Mill Creek and its’ surroundings, which have underwent significant decontamination and have been vastly improved in recent years. GCCs, combined with engineered footing pads installed atop the columns, provide a significantly strengthened subgrade, allowing for traditional shallow footing support on sites with softer, weaker soil or shallow groundwater. The columns work together with surrounding soil to transfer heavy loads below soil down to suitable geotechnical bearing.


GCC installation is clean and efficient, generating little to no spoils without the need for casing or dewatering. GCCs are also a cost-effective alternative to traditional driven piles, allowing for rapid installation on shorter construction schedules.


The new, full-service Holiday Inn will open in late 2018 and feature 124 rooms, as well as a restaurant with waterside outdoor seating. As part of the project, a new public pedestrian path will be created along Mill Creek. The following is a video of Helical Drilling installing GCCs at the future site of Holiday Inn Chelsea:



170 West Broadway
- Aug 06, 2017

Interior finishing nearing completion at 170 West Broadway luxury residences, now on sale in South Boston


Installation of high-end finishes throughout 170 West Broadway's 33 one- and two-bedroom luxury condominium residences, located in the heart of South Boston steps from the South End, the Seaport District and Downtown Boston, is nearing completion ahead of the premier, professionally-managed building's opening this Fall. 170 West Broadway's exclusive, newly built residences will feature top-grade appliances, hardwood floors, high ceilings, intercom service and the latest luxury finishes. Eight penthouses at 170 West Broadway will feature private rooftop decks. Secure garage parking will be located on site.


170 West Broadway condominium residences are now available for sale, with the unprecedented opportunity to customize finishes. Ground-floor retail space at 170 West Broadway is also available for lease. Click Contact Broker above for more information about available residences and retail space at 170 West Broadway. The following are photographs of 170 West Broadway:


170 West Broadway Photos


South Bay Town Center
- Jul 18, 2017

475 new residences break ground at South Bay Town Center in Dorchester


Two new buildings featuring 475 residences have broken ground at the 720,000-square-foot South Bay Town Center mixed-use development in Dorchester. Initial site work for a 45,000-square-foot addition to the existing Holiday Inn Express hotel on site is underway as well. A 602-space precast concrete parking garage is nearing completion at South Bay Town Center, and interior and exterior finishing are underway at the development’s new AMC movie theater. The 10-acre South Bay Town Center is expected to open in 2018 and will feature approximately 475 residential units, 120,000 square feet of retail space, a 60,000 square foot cinema and a 130-room hotel, all oriented about an active pedestrian streetscape. The following is an aerial photograph of South Bay Town Center, courtesy Lee Kennedy Company:


South Bay Town Center


170 West Broadway
- Jul 13, 2017

BLDUP’s Building of the Week: 170 West Broadway luxury condominiums in South Boston


Opening this Fall in South Boston, 170 West Broadway will feature 33 luxurious condominium residences now on sale in addition to 5,170 square feet of ground-floor retail space now leasing. The following is a video exhibiting 170 West Broadway and its’ multiple desirable amenities:



99 Tremont Street
- Jul 13, 2017

Dellbrook | JKS completes Phase I of 99 Tremont Street, new Brighton luxury apartments now leasing


Dellbrook | JKS has completed Phase I of the 62-residence 99 Tremont Street luxury apartment development in Brighton, with studio, one and two-bedroom residences now available for lease. Luxurious finishes have been installed throughout the Phase I building’s residences and amenity spaces, which include a fitness area and a common room. Construction of Phase II is nearing completion and will feature additional residences, along with a landscaped courtyard. 99 Tremont Street is located steps from Brighton’s Oak Square, a short drive or express bus ride to Downtown Boston. The following are photographs of 99 Tremont Street, courtesy Dellbrook | JKS:


99 Tremont Photos


170 West Broadway
- Jul 09, 2017

Finishing touches underway at 170 West Broadway luxury condominiums, now on sale in South Boston


Brick finishes and windows have been fully installed along the facade of 170 West Broadway, a luxurious new residential building in South Boston featuring 33 distinctive one- and two-bedroom condominium residences now on sale. Inside the professionally-managed, state-of-the-art building built by KEMS Corporation, finishing touches to residences and common amenity spaces are nearing completion. Residences will feature modern amenities, top-grade appliances, high ceilings and the latest luxury finishes, in addition to secure garage parking. Eight penthouses at 170 West Broadway will feature private rooftop decks.


170 West Broadway condominium residences are now available for sale, with the unprecedented opportunity to customize finishes. Ground-floor retail space at 170 West Broadway is available for lease as well. Click Contact Broker above for more information about available residences and retail space at 170 West Broadway; the building is expected to open this Fall. 170 West Broadway is located steps to the Broadway MBTA Red Line station, surrounded by desirable restaurants and shops. The Seaport District, the South End and Downtown Boston are all located a short walk away. The following are photographs of 170 West Broadway:


170 West Broadway Photos


75 Moulton Street
- Jul 09, 2017

Renovations complete at 75 Moulton lab and R&D building in Alewife, Helical Drilling provides geotechnical design/build solution


Renovations are complete at 75 Moulton Street, a newly renovated 37,500-square-foot lab and R&D building in Cambridge located a short distance to Alewife Station and now leasing. Renovation work included reinforcement of the building’s pile-supported foundation and columns in order to support a higher roof load given 75 Moulton Street’s state-of-the-art HVAC, roofing and facade upgrades; Helical Drilling installed high-capacity STELCOR® micropiles, an optimal solution for achieving high axial load capacity in limited access and overhead clearance applications such as existing buildings.


STELCOR® micropiles can be efficiently installed with no vibration or spoils, ideal for repositioning of existing buildings. The piles are smaller and more space-efficient than traditional piles, and offer a lower overall cost per kip of support. Helical’s innovative approach was instrumental towards the creation of the state-of-the-art 75 Moulton Street, which features top-quality infrastructure and a sleek new insulated metal panel facade. Lab and R&D space at 75 Moulton Street is now available for lease. The following is a photograph of STELCOR® micropile installation at 75 Moulton Street:


Helical Drilling Installs Micropiles at 75 Moulton Street


Faneuil Hall Marketplace Pavilion
- Jun 27, 2017

Sephora opens in Boston’s Faneuil Hall Marketplace Pavilion, Helical Drilling provides helical pile geotechnical design/build solution


The replacement of an aging 1970s retail structure at Faneuil Hall Marketplace downtown with a gleaming new pavilion featuring a sweeping glass curtain wall is now complete, with a new Sephora high-end cosmetics store now open. The project presented a unique construction challenge given its’ small footprint and location in a popular historic neighborhood constantly bustling with tourists and office workers. Furthermore, the site is located in an area of Boston created with urban fill, which can be unstable if not properly reinforced. The associated transportation needs to replace existing urban fill would have been unsuitable for Faneuil Hall Marketplace’s tight, busy urban location. Accordingly, it was deemed necessary to install piles on the site in order to strengthen the soil.


Traditional pile driving, which is very loud and requires large equipment to perform, not to mention very long individual piles, would not have been ideal for Faneuil Hall Marketplace. Accordingly, geotechnical design/build specialist Helical Drilling was brought in to install helical piles, smaller, more space-efficient foundation elements that can be very cost-effective in a tight urban environment such as Faneuil Hall Marketplace. Helical Drilling performed the helical pile installation in just eight days, allowing the project to proceed quickly, on budget and on schedule. The result is a new modern landmark for Quincy Market that will serve the district for years to come. The following is a photograph of the new Faneuil Hall Marketplace Pavilion, courtesy Helical Drilling:


Sephora Now Open at Faneuil Hall Marketplace Pavilion


The following are photographs of helical pile installation underway at Faneuil Hall Marketplace Pavilion, courtesy Helical Drilling:


Helical Pile Installation - Faneuil Hall


Walter Huntington Apartments
- Jun 23, 2017

Facade and interior finishing underway at Walter Huntington Apartments, luxury apartments opening September in Mission Hill


Windows are now fully installed at Walter Huntington Apartments, a new luxury apartment building in Mission Hill located steps to the Longwood Medical Area featuring 38 residences with 7,080 square feet of ground-floor retail, and exterior weatherproofing is complete. Clapboard siding exterior finishes have been installed along a large section of Walter Huntington Apartments’ facade. Inside the building, luxurious finishes are being installed in residences and common spaces. Walter Huntington Apartments will open this September, with studio, two-bedroom and three-bedroom residences now available for lease. The following are photographs of Walter Huntington Apartments:


35 South Huntington Photos


112 Rantoul Street
- Jun 15, 2017

112 Rantoul Street new mixed-use transit-oriented development in Downtown Beverly, breaks ground


112 Rantoul Street, a new $20 million, 70,000-square-foot mixed-use development located next to the Beverly Depot commuter rail station in Downtown Beverly, has broken ground. A groundbreaking ceremony was held for 112 Rantoul Street this past Wednesday (June 14th, 2017) on the project site, where initial site preparations to construct the six-story building’s foundation have begun. 112 Rantoul Street will feature 67 market-rate apartment residences with approximately 4,500 square feet of ground-floor retail/commercial space. Given the building’s location adjacent to a commuter rail station in the heart of Downtown Beverly, no new vehicle parking will be built on site; parking will be available in the station’s existing garage. 112 Rantoul Street’s structural frame will be comprised primarily of wood framing, which will be constructed above a steel podium. The following is a photograph from the 112 Rantoul Street groundbreaking ceremony:



Boston East
- Jun 08, 2017

Brick finish installation underway at Boston East waterfront apartments in East Boston, artist residence applications begin


Brickwork has been installed along a large section of Boston East’s six-story facade facing Border Street. The building is fully framed, and fireproofing, weatherproofing and windows have all been installed along Boston East’s facade. Inside the building, fit-out of residences and common spaces has begun.


Developer Trinity Financial has begun accepting applications for Boston East’s six artist live-work residences, which will be rented to households earning no more than 70% of Area Media Income (AMI); Boston East will include a ground-floor local artwork gallery. Artist residences will be available for $1,450 per month; rents for market-rate residences at Boston East will range from $2,000 to $4,700 per month, averaging $2,900 per month. Opening in September, Boston East will feature 200 apartment residences along with a new Harborwalk extension and public waterfront space. The following are photographs of Boston East:


Boston East Photos


Coppersmith Village
- Jun 08, 2017

Initial demolition nears completion at East Boston’s Coppersmith Village mixed-use development


Initial demolition work is just about complete at Coppersmith Village, with only one partially-demolished structure left to clear. Following completion of demolition, work to construct foundations for Coppersmith Village’s two rental apartment buildings and 15 individually-owned townhouses will commence. In total, Coppersmith Village will feature 71 residences and approximately 3,000 square feet of ground-floor retail. The following are photographs of Coppersmith Village:


Coppersmith Village Photos


75 Moulton Street
- May 07, 2017

75 Moulton Street, new Alewife lab and R&D space, set for completion this June


75 Moulton Street, a newly renovated 37,500-square-foot lab and R&D building located in Cambridge near Alewife Station, is set for completion this June. Located within Fresh Pond Technology Park, 75 Moulton Street offers a top-quality, well-located, lower-cost alternative to lab and R&D space in Kendall Square and the Seaport District and is now leasing. The Davis Companies, developer of 75 Moulton Street, broke ground in February on Alewife Research Center, a 223,000-square-foot lab and R&D building located across from Alewife Station.


Deco
- Apr 19, 2017

TA Realty acquires newly-built, 180-unit Deco luxury apartments in Quincy for $68.5 million


Real estate investor TA Realty of Boston has acquired Deco, a 180-unit luxury apartment development completed in 2016 located across from the Quincy Adams MBTA Red Line station, for $68.5 million, or $380,556 per unit. Developer Cabot, Cabot & Forbes acquired the 2.3-acre parcel on which Deco is built for nearly $10.4 million ($10,391,456), or $4,518,024 per acre, in May 2014 and paid around $36 million to develop the building. Lincoln Property Company will take over as Deco's property manager; Deco was previously managed by The Bozzuto Group.


Boston East
- Apr 09, 2017

Fireproofing underway at Boston East, framing just about complete


Fireproofing and windows have been installed along a large section of Boston East’s topped-off north wing, and moisture-resistant cladding is in place along large sections of both the north and south wings. Wood framing of the south wing is just about topped off. Interior metal framing of individual apartment residences is underway across Boston East. Opening this Fall, the mixed-use development will feature 200 apartment residences with a Harborwalk extension and public waterfront amenities including art galleries, historic exhibits and a boat launch. The following are photographs of Boston East:


Boston East Photos


262 Monsignor O'Brien Highway
- Mar 30, 2017

262 Monsignor O’Brien Highway condominiums in Cambridge top off, interior concrete pouring and framing underway


262 Monsignor O’Brien Highway’s 7-story steel frame has topped off, and concrete pouring and framing of individual units are both underway inside. The building perimeter is entirely wrapped with a protective weather barrier, which is essential to allow interior work to continue throughout cold New England winters. Metal balcony frames have been installed along 262 Monsignor O'Brien's facade. Located a short walk from the Lechmere MBTA Green Line station, 262 Monsignor O’Brien Highway will feature 55 luxurious condominiums opening this Fall. The following are photographs of 262 Monsignor O’Brien Highway:


262 Monsignor O'Brien Highway Photos


AVA North Point
- Mar 30, 2017

Wood superstructure framing underway at Avalon NorthPoint Phase Two in Cambridge


Construction of wood superstructure framing is well underway at Avalon NorthPoint Phase Two, a new mixed-use building located across from the Lechmere MBTA Green Line station, and will soon reach its’ full height of six stories. The first section of Avalon NorthPoint Phase Two’s post tensioned concrete podium structure, which will house the building’s ground floor lobby and retail space and is serving as the wood framing’s base, is complete. Underneath Avalon NorthPoint Phase Two are three completed levels of below-grade parking. Upon completion, Avalon NorthPoint Phase Two will feature 285 apartment residences with approximately 3,000 square feet of ground-floor retail. The following are photographs of Avalon NorthPoint Phase Two:


Avalon NorthPoint Phase Two Photos


Walter Huntington Apartments
- Mar 26, 2017

35 South Huntington Avenue in Mission Hill nears weather tightening


35 South Huntington Avenue, a new apartment and retail building in Mission Hill, is nearly fully weather tight, with windows and moisture-resistant cladding installed along over half of the topped-off building’s facade. Exterior facade finishes will soon be installed, and plastering of interior units will soon commence. 35 South Huntington Avenue will feature 38 residential units and 7,080 square feet of ground-floor retail space. The development is located near the Longwood Medical Area and next to Riverway Station on the MBTA Green Line. The following are photographs of 35 South Huntington Avenue:


35 South Huntington Photos


Meriel Marina Bay
- Mar 21, 2017

Meriel Marina Bay nears opening


Interior and exterior finishing touches are well underway at Meriel Marina Bay, a waterfront luxury apartment community opening Phase 1 this Spring in Quincy. Callahan Construction Managers is building this mixed-use property in Quincy’s thriving Marina Bay neighborhood in partnership with client Hines. The construction team is installing luxurious features including stainless steel appliances, porcelain backsplash kitchen tiles, solid quartz countertops, Kronoswiss® hardwood flooring and plush bedroom carpeting in Meriel Marina Bay’s 352 apartments.


Windows have been fully installed across both of Meriel Marina Bay’s buildings, and exterior finish panel installation is just about complete. The construction team is also installing railings and finishes along communal elevated courtyards and apartments’ private balconies. Along Meriel Marina Bay’s ground floor, a public waterfront boardwalk is being constructed overlooking Boston Harbor. The property will also include approximately 20,000 square feet of retail space that will line the boardwalk. The following are photographs of Meriel Marina Bay:


Meriel Marina Bay Photos


Peterborough Apartments
- Mar 12, 2017

Facade finish installation underway at Peterborough Apartments in Fenway


Brickwork is currently being installed along the facade of Peterborough Apartments, with the building fully weatherproofed. When complete, Peterborough Apartments will feature 20 apartment residences. The following are photographs of Peterborough Apartments:


Peterborough Apartments Photos


99 Tremont Street
- Mar 08, 2017

Facade nearly complete at 99 Tremont Street Apartments in Brighton


Exterior finishes have been fully installed along the 4-story front section of 99 Tremont Street Apartments, a luxury apartment development built by Dellbrook | JKS. Finishes are now being installed along the facade of 99 Tremont’s 5-story rear section, in addition to windows and moisture-resistant sheathing. Interior finishes are being installed in front section residences, and interior framing is underway within the rear section. When complete, 99 Tremont will feature 62 luxury apartment residences located convenient to Brighton’s Oak Square and the Massachusetts Turnpike. The following are photographs of 99 Tremont Street Apartments:


99 Tremont Photos


170 West Broadway
- Feb 24, 2017

Exterior finish installation underway at 170 West Broadway luxury condominiums in South Boston


Installation of brickwork and finish panels is well underway at 170 West Broadway, with a full brick wall installed along the building’s west side. Bricks and finish panels are now being installed along the building’s front facade facing West Broadway. Windows have been fully installed at 170 West Broadway, and interior finishing of the building’s 33 luxury condominium residences is also underway. 170 West Broadway is expected to open in Spring 2017. The following are photographs of 170 West Broadway:


170 West Broadway Photos


Coppersmith Village
- Feb 22, 2017

Demolition underway to make way for East Boston's Coppersmith Village


Demolition of existing buildings has commenced at the future site of East Boston's 71-unit mixed-income Coppersmith Village residential development. Once the buildings are cleared, foundation work will begin for Coppersmith Village's 2 main rental apartment buildings and 15 individual ownership townhouses. In addition to residences, Coppersmith Village will include approximately 3,000 square feet of ground-floor retail. The following is a photograph of demolition underway at Coppersmith Village:



Boston East
- Feb 05, 2017

Weatherproofing underway at East Boston's Boston East development


The 6-story Boston East superstructure on the East Boston Waterfront is being weatherproofed and prepared for installation of windows. Boston East’s north wing has topped off, and wood framing of the south wing has reached the third floor. Hardscaping has been installed at Boston East’s ground level for the public pedestrian atrium that will connect Border Street to the East Boston Waterfront. Opening this fall, Boston East will feature 200 apartment residences, a Harborwalk extension and public waterfront amenities including art galleries, historic exhibits and a boat launch. The following are photographs of Boston East:


Boston East Photos


South Bay Town Center
- Feb 02, 2017

South Bay Town Center structural framing rising


Structural framing for the cinema and precast parking garages at the upcoming 720,000 square foot mixed-use South Bay Town Center, opening 2018 in Dorchester, is rapidly rising. A new parking garage is 25% erected, and interior structural framing is being installed to construct individual cinema screening halls. Site work is underway to construct the project's residential component, with the construction team at work installing site utilities and removing excess soils in order to commence foundation work. The following is an aerial photograph of the South Bay Town Center site:



Boston East
- Jan 03, 2017

Boston East superstructure nears topping off


Wood framing of Boston East’s six-story superstructure is well underway and has reached as high as the fifth story at the north wing of the East Boston Waterfront development and the second story at the south. Steel erection of Boston East’s ground-floor podium and center pedestrian atrium is complete. Masonry elevator cores have topped off for both building wings. Opening in Fall 2017, Boston East will feature 200 residential apartments and will activate the East Boston Waterfront with a Harborwalk extension, a boat launch and exhibition space. The following are photographs of Boston East:


Boston East Photos


Walter Huntington Apartments
- Dec 27, 2016

New Mission Hill mixed-use building, 35 South Huntington Avenue, tops off


A topping-off ceremony was held for 35 South Huntington Avenue, a new 38-unit residential building with 7,080 square feet of ground-floor retail in Mission Hill, last Friday. 35 South Huntington Avenue has reached its’ full height of six stories tall, and concrete is now being poured on the building’s deck slabs to construct interior flooring. 35 South Huntington Avenue will bring a fresh modern feel to the intersection of Huntington and South Huntington Avenues, one of Mission Hill’s gateway intersections. The following are photographs from the 35 South Huntington Avenue topping off:



170 West Broadway
- Dec 20, 2016

Facade work underway at South Boston's 170 West Broadway condos


Window installation is nearing completion, and exterior finish work is well underway at the new 170 West Broadway condominium and retail building in South Boston. Rigid insulation panels have been installed around the building's exterior in anticipation of installation of exterior finishes. Interior finishing work is also underway on 170 West Broadway's 33 luxury condominiums. Opening Spring 2017, pre-sales of 170 West Broadway condominiums are now underway. The following are photographs of 170 West Broadway:


170 West Broadway Photos


Coppersmith Village
- Dec 18, 2016

East Boston’s Coppersmith Village development closes financing, site work starts


Coppersmith Village developer Neighborhood of Affordable Housing, Inc. (NOAH) closed Friday (December 16th) on over $26 million of funding, allowing the 71-unit mixed-income East Boston Waterfront development to proceed. Financing for Coppersmith Village is provided by the State of Massachusetts and East Boston Savings Bank. Site work at the Coppersmith Village site is now underway following completion of the project’s construction agreement earlier this month. Construction will last 18 to 24 months and will replace a vacant, deteriorating industrial site with housing and retail. Demolition of the industrial building will commence later this month or in early January. Tocci Building Companies is the project’s general contractor.


Montaje
- Dec 14, 2016

Montaje, Assembly Row’s next luxury apartment community, opening mid-2017


Montaje, 447 luxury residential apartments at Somerville’s Assembly Row, will begin leasing in Spring 2017 in anticipation of a mid-2017 opening. Formerly known as Block 6 at Assembly Row, Montaje’s 20-story tower topped off last month. Exterior and interior finishing are now underway at Montaje in anticipation of leasing.


South Bay Town Center
- Dec 06, 2016

South Bay Town Center foundation work underway


Concrete foundations are being installed for the future cinema and parking garages at the 720,000 square foot South Bay Town Center development in Dorchester. Across the South Bay Town Center site, which will host five new buildings on former surface parking lots, site work and utility installation are also underway. The 720,000 square foot mixed-use South Bay Town Center is expected to open in 2018. The following is an aerial photograph of the South Bay Town Center site:



Walter Huntington Apartments
- Dec 01, 2016

35 South Huntington Avenue structural frame construction underway


Superstructure steel has risen four stories out of the ground at 35 South Huntington Avenue, an upcoming six-story mixed-use building in Mission Hill, following successful completion of the building's foundation and precise installation of helical structural piles by Helical Drilling. Helical Drilling's innovative foundation installation methods allowed the construction team to build 35 South Huntington Avenue's foundation, located on a tight lot in dense Mission Hill, while causing little to no vibration.


Composite steel deck slabs are now being installed along the base of the 35 South Huntington Avenue’s first story. Concrete will soon be poured atop the deck slabs to construct the building's floors. The following are photographs of 35 South Huntington Avenue:



Montaje
- Nov 15, 2016

Block 6 at Assembly Row officially tops off


A topping off ceremony was held Monday (November 14th, 2016) for Block 6 at Assembly Row, a 20-story development with 447 residential apartments and 40,000 square feet of retail opening in Early 2018 in Somerville’s rapidly growing Assembly Row neighborhood. Representatives of the Block 6 development and construction team gathered to sign the 20-story Block 6 tower’s final steel beam then lifted the beam and connected it to the tower’s top floor.


Block 6, along with neighboring Alloy, will bring increased vitality to Assembly Row. “We are honored to play a role in the advancement of one of the region’s most exciting new neighborhoods in collaboration with such valued partners,” said Patrick Callahan, President of Block 6 General Contractor Callahan Construction Managers. Both Block 6 and Alloy are developed by Federal Realty Investment Trust. Upon completion, Assembly Row will include over 600,000 square feet of retail, 1,800 residential units and 2.8 million square feet of office space. The following are photographs from the Block 6 topping off ceremony, courtesy the Block 6 team:


Block 6 Topping Off


99 Tremont Street
- Nov 14, 2016

Dellbrook | JKS installs finishes at 99 Tremont Street Apartments in Brighton


Dellbrook | JKS has installed exterior finishes along 99 Tremont Street Apartments’ facade fronting Tremont Street. The four-story building section along Tremont Street is topped off and fully sealed with windows and moisture-resistant sheathing. The five-story section at the property’s rear is just about topped off, with installation of the last wood framing sections underway. Framing of interior apartments and installation of electrical, HVAC and plumbing utilities is underway. 99 Tremont Street Apartments will open to residents in Spring 2017. The following are photographs of the 99 Tremont Street Apartments site:


99 Tremont Photos


Meriel Marina Bay
- Nov 08, 2016

Meriel Marina Bay reaches full height


Meriel Marina Bay’s Building Two has reached six stories tall, the building’s full height. The frames of both buildings at Meriel Marina Bay are now being prepared for installation of exterior finishes. Windows have been installed along large sections of both buildings. Meriel Marina Bay will open in Spring 2017 and will feature 352 luxurious residential apartments overlooking Boston Harbor with sweeping views of the Boston skyline.


Geotechnical design/build contractor Helical Drilling prepared the Meriel Marina Bay construction site, which overlooks scenic waterfront Squantum Point Park, for development of the two new Meriel Marina Bay buildings. The existing urban fill on which the Park and its’ surroundings are built was deemed unsuitable for traditional foundation support methods such as over-excavate/replace and deep pile foundations. Accordingly, Helical Drilling installed several hundred Geopeir grouted rammed aggregate pier elements in the Meriel Marina Bay site’s soil. These elements extend 9 to 16 feet below grade and support the footings of Meriel Marina Bay. The following are photographs of Meriel Marina Bay, courtesy the development team on Twitter:





AVA North Point
- Oct 19, 2016

J. Derenzo Companies excavates Avalon NorthPoint Phase Two foundation


J. Derenzo Companies has excavated Avalon NorthPoint Phase Two’s three-level underground parking garage. Concrete is now being poured to construct the building’s foundation and the garage. The following is an Instagram photograph by Feldman Land Surveyors of the Avalon NorthPoint Phase Two construction site:


14714450_204847789924579_3916809577504440320_n

Northpoint II, setting column line control for the concrete sub. #landsurveyors #surveylife #linecontrol #construction

A photo posted by Feldman Land Surveyors (@feldmanboston) on Oct 17, 2016 at 8:06am PDT


Montaje
- Oct 16, 2016

Block 6 at Assembly Row nears topping off


The 20-story tower at Block 6 at Assembly Row is about to top off. Concrete has been poured on many floors. Exterior finish panels have been installed along a large section of the tower's steel structural frame. Moisture-resistant sheathing and fireproofing are being installed along the adjacent six-story wood-framed structure. A new pre-cast parking garage has been constructed at the project's rear. Block 6 is targeting a January 2018 opening and will contain 447 residential units and 40,000 square feet of retail space. Across from Block 6 is Alloy at Assembly Row, a mixed-use hotel, residential and retail building that is about to top off. The following are photographs of Block 6 at Assembly Row:


View From Wynn Casino Site -


View From Wynn Casino Site


Tweet by Girder-Slab with Aerial View. Alloy at Assembly Row is in foreground, Block 6 is in background -


CuCPjuzXEAASRp8

Low Floor to Floor Heights with Structural Steel. Designed, fabricated and built by you. pic.twitter.com/YdEilAVslf

— GIRDER-SLAB® (@GirderSlab) October 5, 2016


112 Rantoul Street
- Oct 10, 2016

Plans filed for 67 apartments next to Beverly commuter rail


Proponent Sarah Barnat of Barnat Development has filed plans with the Beverly Planning Board proposing to construct a $20 million six-story building on a Downtown Beverly parcel located adjacent to the Beverly Depot commuter rail station; the following is a link to the filed plans and Site Plan Review Application. The building, located at 112 Rantoul Street, would contain 67 residential rental apartments and approximately 4,500 square feet of ground-floor retail/commercial space. The Massachusetts Bay Transportation Authority (MBTA), who owns the 112 Rantoul Street parcel, designated Barnat Development as the parcel's developer in July 2016. Additional information about 112 Rantoul Street can be found above.


Meriel Marina Bay
- Aug 29, 2016

Meriel Marina Bay wood framing nearly complete, exterior finishing underway


The wood frame of Meriel Marina Bay's Building One, overlooking Boston Harbor and the Boston skyline, is complete. Windows and moisture-resistant sheathing are now being installed along Building One's exterior. Building Two's five-story frame is just about to top off; exterior finishing of Building Two will commence shortly afterwards. Opening Spring 2017, Meriel Marina Bay will feature 352 waterfront luxury rental residential apartments ranging from studios to three-bedrooms located on the Marina Bay boardwalk steps to beaches, ferry service to Downtown Boston and multiple waterfront dining and entertainment options. Visit MerielMarinaBay.com for apartment leasing information. As part of Meriel Marina Bay, the Marina Bay boardwalk will be extended along Boston Harbor; approximately 20,000 square feet of ground-floor retail will be located at Meriel Marina Bay fronting the new boardwalk. The following are photographs of Meriel Marina Bay:


Meriel Marina Bay August 2016


The following is a panoramic view of the Marina Bay boardwalk:


Meriel Marina Bay August 2016 Panorama


262 Monsignor O'Brien Highway
- Aug 26, 2016

Concrete foundation pouring underway at 262 Monsignor O’Brien Highway


262 Monsignor O’Brien Highway’s 55-car underground parking garage has been excavated. Sheet piles have been installed along the garage’s perimeter to reinforce the foundation, and concrete is being poured vertically to construct the garage’s walls. Concrete footings are also being poured above pile caps along the garage’s base. 262 Monsignor O’Brien Highway will contain 55 one and two-bedroom residential luxury condominiums. The following are photographs of 262 Monsignor O’Brien Highway:


262 Monsignor O'Brien Highway


AVA North Point
- Aug 26, 2016

Excavation and foundation work underway at Avalon NorthPoint Phase Two


J. Derenzo Companies has nearly fully excavated the underground parking structure of Avalon NorthPoint Phase Two, a six-story residential building located steps away from the Lechmere rapid transit station. A total of three levels of underground parking will be excavated. Sheet pile walls reinforced by horizontally-mounted large diameter round steel beams are being used to support the excavated garage. A reinforced concrete foundation is being poured vertically along the garage’s perimeter to support the building’s substructure. Approximately 285 residential rental apartments and 3,000 square feet of retail space will be constructed at Avalon NorthPoint Phase Two. The following are photographs of Avalon NorthPoint Phase Two:


Avalon NorthPoint Phase Two


Meriel Marina Bay
- Jul 12, 2016

Meriel Marina Bay on Quincy waterfront tops off


A topping-off ceremony was held for Meriel Marina Bay on June 28th, 2016. The following is a link to the official press release announcing the topping-off. During the ceremony, Meriel Marina Bay's last beam of steel was lifted into place and installed, completing Building Two's structural steel frame. 163 wood-framed residential apartments will now be constructed above Building Two's steel frame. Wood framing is underway on Building One, which will contain 189 apartments.


Located in Quincy's waterfront Marina Bay neighborhood with sweeping views of Boston Harbor and the Boston skyline, Meriel Marina Bay will feature 352 luxury apartments across two new buildings. Resident amenities will include a fitness center, three elevated courtyards and a swimming pool in addition to sweeping ocean and skyline views. The project will also include a public waterfront boardwalk extension and approximately 20,000 square feet of retail.


Initial occupancy of Meriel Marina Bay is expected in Spring 2017. Bozzuto will be Meriel Marina Bay's property manager. The following are links to pre-leasing information and to the Meriel Marina Bay website.


The following are photographs from the Meriel Marina Bay topping-off ceremony, courtesy Nickerson PR:


MerielMarinaBay_ToppingOff_Nickerson_062816-4
The final beam is lifted into place


MerielMarinaBay_ToppingOff_Nickerson_062816-3
The final beam is installed


MerielMarinaBay_ToppingOff_Nickerson_062816-6
A worker signs the final beam


MerielMarinaBay_ToppingOff_Nickerson_062816-9
A worker signs the final beam


MerielMarinaBay_ToppingOff_Nickerson_062816-7
Wood framing of units underway at Building One


The following is a rendering of Meriel Marina Bay, courtesy Elkus Manfredi Architects:


MerielMarinaBay_ElkusManfrediArcitects_2016


The following are aerial photographs of the Meriel Marina Bay project site taken in early June, courtesy Nickerson PR:


Meriel-Marina-Bay_Aerial-View_Callahan
Aerial view of Building One


Meriel-Marina-Bay_Aerial-View_2_Callahan
Aerial view of Building One (background) and Building Two (foreground)


Peterborough Apartments
- Jun 30, 2016

Exterior shell complete at Peterborough Apartments


Peterborough Apartments’ exterior shell is complete and sealed with Pella windows. The building is wrapped on all sides with Carlisle CCW-705 air and vapor-proof coating; exterior finishes will soon be installed. Peterborough Apartments’ 10-car parking area, located underneath the building, is complete and can accessed via the rear alley way. Peterborough Apartments will feature 20 two-bedroom residential rental apartments.


16-20-Peterborough-3
Rear of the building

16-20-Peterborough-7
View from Peterborough Street

16-20-Peterborough-4
Garage accessed via the rear of the building

16-20-Peterborough-1
Pella windows in the rear of building

16-20-Peterborough-8
Window wells in the front of the building

16-20-Peterborough-6
View from Peterborough Street

16-20-Peterborough-2
Rear of the building

16-20-Peterborough-5
View from Peterborough Street


More information about Peterborough Apartments is posted below.


Walter Huntington Apartments
- Jun 28, 2016

Excavation underway at 35 South Huntington Avenue


Preparations for foundation construction are underway at 35 South Huntington Avenue in Mission Hill. Excavation of the underground parking structure is nearly complete; the entire site has been excavated and graded. Concrete will soon be poured along the sides and base of the parking structure to construct the foundation of a new six-story building with 38 residential units and 7,080 square feet of ground-floor retail.


35-South-Huntington-3
View from the northwest corner

35-South-Huntington-1
View from the rear

35-South-Huntington-2
View from the southeast corner


35-South-Huntington-4

View from South Huntington Avenue

More information about 35 South Huntington Avenue is posted below.


262 Monsignor O'Brien Highway
- Jun 07, 2016

Nauset Construction begins work on 262 Monsignor O’Brien Highway condos in East Cambridge


Foundation work is underway on the 84,000 square foot condominium project at 262 Monsignor O’Brien Highway in East Cambridge located steps to the Lechmere rapid transit station. Nauset Construction, the project’s general contractor, commenced work in June 2016. The project will feature 55 one and two bedroom residential units.


Expected completion of the project is in fall 2017. The following is a link to a press release with more information. Additional information is posted below.


170 West Broadway
- Jun 06, 2016

Foundation and parking structure construction underway at 170 West Broadway


Demolition at 170 West Broadway and excavation of the foundation is complete. The construction team is at work constructing the new building's foundation and underground parking structure.

170-West-Broadway-8
Panoramic view of excavated 170 West Broadway foundation towards Athens Street

170-West-Broadway-6
View of underground parking garage ramp under construction at 170 West Broadway

The concrete foundation perimeter is built to street level along Athens Street and West Broadway. Concrete footings are under construction within the foundation perimeter.

170-West-Broadway-2
View of concrete foundation perimeter from Athens Street

170-West-Broadway-1
View of concrete foundation perimeter from Athens Street

170-West-Broadway-3
View of concrete footings under construction at 170 West Broadway

More information about 170 West Broadway is posted below.


Boston East
- May 24, 2016

Boston East officially breaks ground


We had the honor and privilege of attending the official Boston East groundbreaking ceremony this past Thursday, May 19th. We would like to extend huge congratulations and thanks to Trinity Financial and East Boston Community Development Corporation on this important milestone. Boston East will enliven the East Boston Waterfront with public amenities including a Harborwalk, art galleries, historic interpretive exhibits and a boat launch in addition to 200 new residential units. Above and below are the latest renderings of Boston East.


Boston-East-Building

View of Boston East from Boston Harbor


Boston-East-View

View of Boston Harbor at sunset from Boston East


Speakers at the Boston East groundbreaking ceremony included Trinity Financial Vice President Abby Goldenfarb, Governor Charlie Baker, Mayor Martin J. Walsh, State Representative Adrian Madaro, City Councillor Sal LaMattina and East Boston Community Development Corporation Executive Director Al Caldarelli.


Boston-East-Abby-Goldenfarb

Trinity Financial Vice President Abby Goldenfarb


Boston-East-Governor-Baker

Governor Charlie Baker


Boston-East-Mayor-Walsh

Mayor Martin J. Walsh


Boston-East-Rep-Madaro

State Representative Adrian Madaro


Boston-East-Councillor-LaMattina

City Councillor Sal LaMattina


Boston-East-Al-Caldarelli

East Boston Community Development Corporation Executive Director Al Caldarelli


Speeches were followed by a ceremonial groundbreaking along the East Boston Waterfront.


Boston-East-Shovel-Fly

Shovels fly at Boston East


Boston-East-Shovels

View of shovels overlooking Boston Harbor


Boston-East-Future-Harborwalk

View from the future Harborwalk at Boston East


Initial site work at Boston East has been underway since February. The six-story building’s sheet pile wall is complete. The sheet pile wall will reinforce the building’s foundation and one-story underground parking structure.


Boston-East-Sheet-Pile-1

Completed sheet pile wall at Boston East's south side


Boston-East-Sheet-Pile-2

Completed sheet pile wall at Boston East's north side


The Boston East building’s foundation is nearly fully dug, and final excavations are taking place.


Boston-East-Piles-Excavation-4

Final excavations underway at Boston East's north side

The construction team is driving concrete piles at the foundation’s base to support the building.


Boston-East-Piles-Excavation-1

The construction team directs a pile driver onto the construction site


Boston-East-Piles-Excavation-2

The construction team moves a concrete pile (gray rod at right) to the pile driver (at left)


Boston-East-Piles-Excavation-3

Base of Boston East's foundation following concrete pile driving. Note bumps in the ground, under which are driven piles.


Concrete will soon be poured along the base and sides of the foundation, enabling construction of the building’s superstructure.


Boston-East-Foundation-Pour

Concrete will be poured along the base and sides of the foundation upon completion of excavation


Boston East is expected to open in fall 2017. Pre-leasing of residences at Boston East has begun, visit bostoneast.com for more information. Below is a video exhibiting Boston East.


Boston East video


More information about Boston East is posted below.


AVA North Point
- May 15, 2016

J. Derenzo Companies breaks ground on NorthPoint’s next residential development


J. Derenzo Companies has broken ground on Phase Two of the Avalon NorthPoint residential development project and is excavating the project’s foundation and underground parking structure. Two new buildings will be built as part of Avalon NorthPoint Phase Two containing approximately 285 residential units and 3,000 square feet of ground-floor retail.


J. Derenzo Companies excavates Avalon NorthPoint Phase Two's foundation and underground parking structure


J. Derenzo Companies excavators at Avalon NorthPoint Phase Two

Excavation at Avalon NorthPoint Phase Two


Driving of sheet piles is underway along the foundation to construct the sheet pile wall. The wall will reinforce Avalon NorthPoint Phase Two’s foundation and three-level underground parking structure.


Sheet piles being driven along Avalon NorthPoint Phase Two's foundation


Allied Pile Driving, Inc. driving sheet piles at Avalon NorthPoint Phase Two


Sheet piles driven at Avalon NorthPoint Phase Two


Driving of sheet piles underway at Avalon NorthPoint Phase Two


NorthPoint master developer DivcoWest acquired the 42-acre master-planned NorthPoint site for $300 million in August 2015. Upon completion, NorthPoint will contain a mix of residential and commercial uses located near Downtown Boston and Kendall Square. A new 355-unit residential apartment tower at NorthPoint, Twenty|20, opened in summer 2015.


Locus map of NorthPoint site


Avalon NorthPoint Phase Two is being developed in partnership with AvalonBay Communities and The McKinnon Company. AvalonBay Communities is building a 38-story mixed-use tower, Avalon North Station, across the Charles River from NorthPoint. Avalon NorthPoint Phase Two is located across from both the existing Lechmere rapid transit station and the new relocated Lechmere station planned as part of the Green Line Extension project.


Rendering of future Lechmere station with Avalon North Point (white buildings) and the NorthPoint site in the background


More information about Avalon NorthPoint Phase Two is posted below.


South Bay Town Center
- May 13, 2016

South Bay Town Center approved for construction


The Boston Redevelopment Authority approved South Bay Town Center for construction at last night's board meeting. Located in Dorchester at the existing South Bay Center shopping mall, the 720,000 square foot mixed-use development project will include approximately 475 residential units, 120,000 square feet of retail space, a 60,000 square foot cinema and a 130-room hotel. Construction of South Bay Town Center could start in the third quarter of 2016.


A rendering of South Bay Town Center is posted above. More information about South Bay Town Center is posted below.


Boston East
- Apr 19, 2016

Sheet pile wall foundation under construction at Boston East on East Boston Waterfront


Construction of Boston East's sheet pile wall is moving forward swiftly. The sheet pile wall will reinforce Boston East's foundation and underground parking structure. A 120-car underground garage will be built at Boston East.


Once the sheet pile wall is complete, the construction team will excavate the project's foundation and underground parking structure. Excavation equipment has been parked at the Boston East site including excavators and a dump truck. The following are photographs of the equipment:


Boston-East-Excavation-1   Boston-East-Excavation-2


A blue Mantis 15010 crane is being used to drive the wall's sheet piles into the ground. The following are photographs of the crane driving piles at Boston East:


Boston-East-Mantis-1   Boston-East-Mantis-2


Many sheet piles have already been driven along the Boston East building's future perimeter. The following are photographs of the sheet piles:


Boston-East-Wall-2   Boston-East-Wall-3


As foundation construction progresses at Boston East, timber and earth fill used to originally construct today's East Boston Waterfront is being uncovered. The East Boston Waterfront, like much of Boston, was constructed using land filling techniques to expand the original land area. The following is a photograph of unearthed fill:


Boston-East-Landmaking-1


Fuse Cambridge
- Mar 30, 2016

Newly opened Fuse Cambridge offers the best of city dwelling and suburban living


The newly-built Fuse Cambridge apartment building has been open to new residents since November 2015. Fuse Cambridge is uniquely positioned along the Alewife Brook Greenway, a great place to walk, run and bike. Fuse Cambridge residents have access to complementary bicycles, ensuring residents can take full advantage of Fuse Cambridge's surroundings.

Units at Fuse Cambridge feature abundant natural light and views of the lush green surroundings. Residents have access to a rooftop terrace with a pool and a panoramic view of Alewife Brook. Fuse Cambridge is a thoughtfully and distinctively designed building that offers the best of city dwelling and suburban living.

New photographs of Fuse Cambridge are posted above. Additional project information is posted below.


Walter Huntington Apartments
- Mar 18, 2016

35 South Huntington Avenue approved for construction


The Boston Redevelopment Authority approved a new mixed-use building at 35 South Huntington Avenue in Mission Hill for construction at last night's board meeting.


Deco
- Mar 01, 2016

Deco's 180 apartments are now leasing targeting a March 15th opening. Finishing touches are being installed along the building's facade. Deco's bright, distinctive finishes and Art Deco architectural inspiration have a strong presence at the gateway to Quincy Center. With a number of resident amenities and a walkable location convenient to rapid transit and highways, Deco is a great choice for those seeking an urban lifestyle.


Boston East
- Feb 19, 2016

Construction commences at Boston East


Construction has commenced at Boston East. LM Heavy Civil Construction is performing initial earthwork to prepare the site for foundation construction. Boston East will be a 200-unit apartment building with ground-floor art gallery space. An extension of the East Boston Harborwalk waterfront park and walking trail will also be built on the Boston East site. The following are photographs of earthwork underway at Boston East:

Boston-East-Waterfront-Trinity-Financial-Cranshaw-Construction-ICON-Architecture-1   Boston-East-Waterfront-Trinity-Financial-Cranshaw-Construction-ICON-Architecture-2

Boston-East-Waterfront-Trinity-Financial-Cranshaw-Construction-ICON-Architecture-4   Boston-East-Waterfront-Trinity-Financial-Cranshaw-Construction-ICON-Architecture-5


99 Tremont Street
- Feb 01, 2016

Foundations are being dug at 99 Tremont Street Apartments by the Dellbrook Construction/JK Scanlan Company team. The team is hard at work transforming a formerly vacant lot into a 62-unit residential development. 99 Tremont Street Apartments will bring an increased residential presence to Oak Square, an eclectic commercial center in Boston's Brighton neighborhood. Expected construction completion is in late 2016. Our latest site photographs are posted above; project renderings and more project information are posted below.


Walter Huntington Apartments
- Jan 31, 2016

Mixed-use building proposed at 35 South Huntington Avenue


A Small Project Review Application was filed with the Boston Redevelopment Authority on Friday to construct a new mixed-use building at 35 South Huntington Avenue in Mission Hill. The following is a link to the full review application. More project information is posted below.


Peterborough Apartments
- Jan 12, 2016

Peterborough Apartments tops off


Peterborough Apartments’ five-story frame, built by Boston Design Construction, has topped off. Installation of exterior framing and cladding will soon commence.


Peterborough_Apartments_Fenway_Neighborhood_Boston_Boston_Design_Construction_General_Contractor_Betterbuilt_Enterprises_LLC_Developer_Residential_Nunes_Trabucco_Architects_1
View along Peterborough Street


Peterborough_Apartments_Fenway_Neighborhood_Boston_Boston_Design_Construction_General_Contractor_Betterbuilt_Enterprises_LLC_Developer_Residential_Nunes_Trabucco_Architects_3
View along Peterborough Street


Peterborough_Apartments_Fenway_Neighborhood_Boston_Boston_Design_Construction_General_Contractor_Betterbuilt_Enterprises_LLC_Developer_Residential_Nunes_Trabucco_Architects_4
View along Peterborough Street


Peterborough_Apartments_Fenway_Neighborhood_Boston_Boston_Design_Construction_General_Contractor_Betterbuilt_Enterprises_LLC_Developer_Residential_Nunes_Trabucco_Architects_5
Building frame


Peterborough_Apartments_Fenway_Neighborhood_Boston_Boston_Design_Construction_General_Contractor_Betterbuilt_Enterprises_LLC_Developer_Residential_Nunes_Trabucco_Architects_6
Building frame


Boston East
- Dec 24, 2015

Boston East parcel transferred to development team for $2 million


A deed was recorded in the Suffolk County Registry of Deeds on December 23rd, 2015 transferring the parcel at 102-148 Border Street in East Boston from the City of Boston to Trinity Border Street, LLC for $2 million, clearing the way for construction of Boston East. The following is the recorded deed:


   


Trinity Border Street, LLC is a partnership of Trinity Financial, Inc. and the East Boston Community Development Corporation. Boston East is fully approved for construction. The following are photographs of the Boston East site:


Boston_East_Trinity_Financial_Cranshaw_Construction_1   Boston_East_Trinity_Financial_Cranshaw_Construction_2


One North of Boston Phase Two
- Nov 25, 2015

We visited the One North of Boston—Phase Two construction site in Chelsea. Callahan Construction has done a beautiful job; the building's finishes are attractive, and the structure, designed by Sheskey Architects, fits well within the existing neighborhood fabric.

We look forward to One North of Boston—Phase Two's anticipated opening in April 2016! Residents will be located in a convenient, walkable setting near downtown Chelsea and shopping options. Downtown Boston is also easily accessible by car or MBTA Commuter Rail, and soon by MBTA Silver Line bus service! Judging by One North of Boston—Phase One's success, One North of Boston—Phase Two is sure to be a great place to live.

View our construction site photographs above, and stay tuned for further updates!


Meriel Marina Bay
- Sep 30, 2015

Meriel Marina Bay officially breaks ground


A groundbreaking ceremony was held for Meriel Marina Bay on September 21st, 2015. Guests included Quincy Mayor Tom Koch, Massachusetts State Senator John F. Keenan, Massachusetts State Representative Bruce J. Ayers and Quincy Planning Board Chairman William Geary. Meriel Marina Bay will feature 352 waterfront luxury residential apartments, 20,000 square feet of retail and a public waterfront boardwalk. Occupancy of Meriel Marina Bay is expected in Spring 2017. The following is a link to the official press release for the groundbreaking. The following is a photograph from the groundbreaking, courtesy Hines:


K3A6872


Thought Leadership

New bedford warehouse addition
When should Geopier rigid inclusions be considered for a ground improvement project?
Jun 13, 2018 -   line-height: 1.38; margin-top: 0pt; m...

Headquarters

See Helical Drilling's Full Portfolio >>