For over 35 years, Whitney Veigas has been providing great-looking and cost-effective architectural sign programs throughout the Greater Boston area.

 Our work is rooted in the conviction that great sign design is both achievable and essential to the success of all projects, regardless of budget or prominence. We work hand in hand with architects, contractors, and owners to complement their vision, and are experts in design that results in practical and smart solutions.

Most of our work utilizes the design-build model because it is efficient, provides upfront costs, and ensures a single point of responsibility from start to finish. With multiple environmental graphic designers and implementation experts on staff, we hold a rare position in the sign industry as a true design-build studio that places equal emphasis on quality design and streamlined implementation.

Updates

Packard Crossing
- Jan 10, 2020

Site Clear for 2nd Phase of Packard Crossing Demo of a commercial building at 45-55 Brighton Ave. is complete and the site is now clear for Phase 2 of Packard Crossing. This new building will feature a below-grade parking garage with 175 spaces, 3,050 square feet of retail space, plus 76 apartments. The first phase of the project, along Gardner Street, features 38 apartments and parking for 39 cars. 


545 East Third Street
- Nov 14, 2019

Certificate of Occupancy Issued for 545 East Third St. in South Boston A certificate of occupancy has been issued for the 18 unit condo project at 545 East Third Street in Southie. These luxury homes feature chef's kitchens, GE Cafe Designer Appliances, crown molding, and quartz countertops. The project also includes garage parking for 22 cars plus a fitness center.


Powder House
- Nov 05, 2019

Construction Continues on The Redevelopment of the Powder House School in Somerville Construction is ongoing for the redevelopment of the Powder House school building near Teele Square in Somerville. Modifications to the materials and arrangement of portions of the facade were approved last month by the Somerville Planning Board. When complete the project will feature 48 apartments along with over 11,000 square feet of commercial space and ample open, green space. 48 vehicle parking spaces and 118 bike spaces will also be located on-site. 


Packard Crossing
- Oct 24, 2019

Demo Permit Pulled for Phase II of Packard Crossing Hamilton Construction Management has pulled a permit to demo the existing 1-story commercial building at 45-55 Brighton Avenue in Allston. Removal of the building will make way for phase II of Packard Crossing. The new building will feature 76 units, 3,050 square feet of ground-floor retail space and a below-grade parking garage with 175 spaces. 


Cambria Hotel South Boston
- Oct 01, 2019

Cambria Hotel South Boston Now Open South Boston’s newest hotel, The Cambria, is now open. This upscale hotel features 159 guest rooms inspired by the South Boston neighborhood, the local art scene, and the natural beauty of New England. The hotel offers an array of amenities including a 2,400 square foot gym with Gronk Fitness equipment, 4,000 square feet of meeting space, plus a ground floor restaurant and rooftop lounge, Six \ West. On the ground floor, connected to the neighboring luxury condo building 14 West, the restaurant will serve breakfast, lunch, dinner offering both indoor and outdoor seating. Up above, the Rooftop at Six \ West spans 4,000 square feet and features a dramatic, overhanging wood canopy to cover up to 240 guests enjoying the unique-in-Southie spot for dining, drinking, and lounging during the warm summer months. Along with the connection on the ground level, the residents at 14 West have access to the shared fitness center plus the property features concierge service, valet parking, and its own private roof deck complete with stunning Boston views. For more information on 14 West contact The Caulfield Properties team at 617-501-3685 or visit https://www.14westbroadway.com/.  


Madison Melnea Cass Apartments
- Jul 30, 2019

CO Issued for Madison Melnea Cass Apartments A certificate of occupancy has been issued for the first 60 apartments in the Madison Melnea Cass development in Roxbury. The 5-story building at 40 Raynor Circle features 1, 2, and 3 bedrooms. In total the project will feature 76 homes, 39 of which are designated affordable, at either 60% or 100% AMI. 


Cambria Hotel South Boston
- Jul 16, 2019

Final Touches Wrapping Up for Cambria South Boston: Opening August 16th The finishing touches are underway for the Cambria Hotel in South Boston. The 159 boutique hotel is set to open next month on August 16th.  The guest rooms at the Cambria hotel offer casual and contemporary furnishings and include complimentary WiFI and locally inspired art. The Cambria is ideal for both business and leisure travelers, situated an easy walk to the South End or Seaport or a quick redline ride into downtown Boston or Cambridge. The Cambria South Boston also features a rooftop bar with stunning views of Boston and 4,000 square feet of event space. The hotel’s ground floor will connect to the neighboring new construction luxury condo complex 14 West. The shared ground floor space will include a restaurant set to showcase local cuisine offering room service to both the hotel and residences. The two buildings also share a state of the art fitness center featuring Peloton bikes. Construction on 14 West wrapped up earlier this year with floor plans still remaining. The luxury homes at 14 West feature valet parking, concierge service, and a private roof deck with panoramic views. For more information on 14 West visit https://www.14westbroadway.com/ or contact The Caulfield Properties Team at 781.534.2526.


Boston East
- Jul 03, 2019

Boston East Refinanced for $55 Million The property at 126 Border Street has been refinanced for $55 million via TD Bank. Boston East is a six-story mixed-use development on the East Boston Waterfront. Boston East features 200 residential apartments and public waterfront amenities including a Harborwalk, art galleries, historic interpretive exhibits, available kayaks and paddleboards and a boat launch.


Packard Crossing
- Jul 02, 2019

Facade Install Nearly Complete for 1st Phase of Packard Crossing Facade install is almost complete for the first phase of the Packard Crossing development in Allston. This first phase integrates the new four-story building into the existing Victorian house on the site and will feature 38 apartments. Underneath the building, a parking garage was also constructed with space for 39 cars. The second phase of the project will construction another larger building along Brighton Avenue to feature 76 units and around 3,000 square feet of ground floor retail along with another  175 parking spaces.


545 East Third Street
- Jun 19, 2019

Construction Wrapping up at 545 East Third in South Boston: Expected Occupancy in July Final interior finishing is wrapping up for the 18 luxury condos at 545 East Third Street in South Boston as the development team expects to have the project completed in July. The condos feature custom chef's kitchens, GE Cafe Designer Appliances, crown molding, and quartz countertops. Many units also have private outdoor space. Resident amenities including garage parking for 22 cars along with a fitness center.


Madison Melnea Cass Apartments
- May 30, 2019

Interior Finishing Wrapping Up for Madison Melnea Cass Apartments Interior finishing is wrapping up for the Madison Melnea Cass Apartments in Roxbury with expected completion in the coming months. The project will feature a total of 76 units at different levels of affordability ranging from deeply affordable to market rate. 


545 East Third Street
- May 28, 2019

Interior Finishing Underway for 545 East Third St. in Southie Interior finishing is underway for the 18 condos coming to 545 East Third Street in South Boston. The project also includes parking for 22 cars along with a fitness center for residents. Residences feature private outdoor spaces and chefs kitchens. Construction is expected to be complete in  July.  