Montaje Update 10/16/16

Block 6 at Assembly Row nears topping off


The 20-story tower at Block 6 at Assembly Row is about to top off. Concrete has been poured on many floors. Exterior finish panels have been installed along a large section of the tower's steel structural frame. Moisture-resistant sheathing and fireproofing are being installed along the adjacent six-story wood-framed structure. A new pre-cast parking garage has been constructed at the project's rear. Block 6 is targeting a January 2018 opening and will contain 447 residential units and 40,000 square feet of retail space. Across from Block 6 is Alloy at Assembly Row, a mixed-use hotel, residential and retail building that is about to top off. The following are photographs of Block 6 at Assembly Row:


View From Wynn Casino Site -


View From Wynn Casino Site


Tweet by Girder-Slab with Aerial View. Alloy at Assembly Row is in foreground, Block 6 is in background -


CuCPjuzXEAASRp8

Low Floor to Floor Heights with Structural Steel. Designed, fabricated and built by you. pic.twitter.com/YdEilAVslf

— GIRDER-SLAB® (@GirderSlab) October 5, 2016

View Montaje >>

Search BLDUP

Search BLDUP for news, projects, and companies to find the information that pushes your business forward.

Related News