The Factory at 46 Wareham
Update
06/14/16
Construction surveying begins at The Factory at 46 Wareham
Preliminary surveying of the existing structure at The Factory at 46 Wareham has begun. A plumb bob is hanging from the existing structure’s roof to survey the site and determine a reference point for construction plan implementation. A safety perimeter is also installed on the roof. A bobcat skid loader is on site to commence excavation and foundation construction.
View from Wareham Street
Plumb bob being used to survey the site
View from Wareham Street
Bobcat rig and construction staging as seen off of Malden Street
View from Malden Street
A rendering of The Factory at 46 Wareham is posted above. More information about The Factory at 46 Wareham is posted below.