Parking structure excavation complete at 14 West, concrete pouring underway
Excavation of 14 West’s underground parking structure is complete. Concrete pouring is underway along the base and sides of the parking structure to construct the 10-story building’s foundation. A slab of concrete has already been poured along the base of the parking structure. Steel and wood forms are set along the base and sides; concrete will be poured into the forms to construct the foundation.
14 West will feature 49 residential condominiums and a 350-seat restaurant. Pre-sales marketing of condominiums at 14 West has begun, visit 14WestBroadway.com for more information. Delivery of 14 West is expected in the fourth quarter of 2017. 14 West is located at 14 West Broadway in South Boston.
Completed concrete slab
Completed concrete slab (at left) and steel and wood form ready for concrete pouring (at right)
View of 14 West site from West Broadway towards Athens Street
View of 14 West site from Athens Street towards West Broadway
Steel and wood forms (foreground) with shoring wall (background)
Steel and wood forms (foreground) with shoring wall (at right)
Vertical steel forms along foundation edge
Steel and wood forms (foreground) with shoring wall (background)
Steel and wood forms (foreground) with shoring wall (background)
Branding
More information about 14 West, including additional renderings, is posted below.
May 8, 2016
Excavation underway at 14 West
Excavation of 14 West’s underground parking structure is underway. Massive quantities of earth have been removed from the project site to construct 70 new parking spaces. Wooden shoring walls are installed along the sides of the project site to ensure stability of the foundation perimeter and minimize impact upon surrounding buildings and utilities during excavation.