10 Farnsworth
Update
10/27/16
10 Farnsworth micropile drilling complete
Approximately 50 micropiles have been drilled into the ground across the 10 Farnsworth site, enabling foundation concrete pouring to begin. These micropiles will provide structural support for the six-story 10 Farnsworth building. Excavation is now underway at 10 Farnsworth, after which formwork will be laid to shape concrete pouring to construct the building’s foundation. The following are photographs of the 10 Farnsworth site: