Five New Buildings Topping Off Update



Five-New-Buildings-Topping-Off-Boston
Above: The final steel beam is installed at Serenity Apartments' topping-off ceremony last summer


2017 will bring several exciting new buildings to Boston. These buildings will infuse Boston’s neighborhoods with new residents, enticing retail options and adaptive public spaces. Here are five new buildings wrapping up construction next year that have recently, or will soon, top off:


Parcel 1B

Causeway-1-768x576


In booming Bulfinch Triangle across from North Station, Parcel 1B, a 14-story building developed by Related Beal featuring 239 affordable apartments and a 220-room hotel, topped off this fall. Scheduled for completion in early 2018, Parcel 1B will bring an important affordable housing option to Boston’s downtown core. Learn more about Parcel 1B here.


1350 Boylston

Evening view of building along Boylston Street


In the heart of the Fenway overlooking the Emerald Necklace, 1350 Boylston, a 17-story building developed by Skanska with 212 apartments and 7,000 square feet of ground-floor retail, topped off this fall. At the topping-off ceremony, Skanska was joined by students from the nearby McKinley Preparatory High School, who Skanska is educating about the 1350 Boylston construction process. 1350 Boylston is targeting a Fall 2017 opening. Learn more about 1350 Boylston here.


Pierce Boston

Living Area


Across Boylston Street from 1350 Boylston is the Fenway’s Pierce Boston, a 30-story tower developed by LandseaSamuels & Associates and Weiner Ventures with 349 luxury residential units and a 20,000 square foot retail podium. With concrete nearly fully poured on all stories and the building’s distinctive glass facade nearly 11 stories high, Pierce Boston is expected to fully top out in the first week of December. Full completion of Pierce Boston is expected in Winter 2018. Learn more about Pierce Boston here.


50 Liberty

Penthouse View


In the Seaport District on the Boston Harbor waterfront, 50 Liberty, a 14-story building developed by The Fallon Company with 120 luxury condominiums and ground-floor retail, has just about reached its’ full height. 50 Liberty will open in Fall 2017 and will energize Boston’s Harborwalk with new retail space overlooking Boston Harbor. Learn more about 50 Liberty here.


14 West

Residential unit


In South Boston across from the Broadway rapid transit station, 14 West, a 10-story building developed by City Point Capital featuring 49 luxury condominiums and a 6,000 square foot ground-floor restaurant, topped off this fall. 14 West will open in 2017 and will feature a resident roof deck with sweeping views of the Boston skyline. Learn more about 14 West here.

Related News

Harvard university science and engineering complex western avenue allston behnisch architekten
Harvard University Science and Engine... in Boston
Sep 21, 2018 - Construction Continues on Harvard's $1 Billi...
12 harvard street waltham ma
12 Harvard Street in Waltham
Sep 21, 2018 - Waltham Retail Property Acquired for $6.825...
Park 77 cambridge ma development
Park 77 in Cambridge
Sep 20, 2018 - The Developers Abode Z + Acorn Holdings have...
290 292 main street mit kendall square initiative development graduate student housing
290-292 Main Street in Cambridge
Sep 20, 2018 - Addition of New Floors Begins at MIT's 290-2...
Treadmark ashmont tod2 mixed use residential retail transit oriented mbta development project trinity financial the architectural team rendering
Treadmark in Boston
Sep 20, 2018 - Interior Finishing Underway at Treadmark 2.0...
Kendall square initiative cambridge ma
MIT Kendall Square Initiative in Cambridge
Sep 20, 2018 - Concrete Core Construction Underway at 314 M...
401   419 washington street brighton boston ma
401-419 Washington Street in Boston
Sep 19, 2018 - Brighton retail property acquired for $5.6 m...
642 main st wakefield
642MAIN in Wakefield
Sep 19, 2018 - 642Main Expected to Open Spring 2019
140 150 shirley street roxbury boston ma
140-150 Shirley Street in Boston
Sep 19, 2018 - Roxbury industrial property acquired for $2....
Education first ef phase iii hult international business school new building development northpoint cambridge 10 north point boulevard
Education First Phase III in Cambridge
Sep 19, 2018 - Exterior Work Progressing at EF III
10 essex street central square cambridge apartments retail development 3mj realty
10 Essex Street in Cambridge
Sep 19, 2018 - Construction Ongoing at 10 Essex Street in C...
Img 2797
NAIOP Event Showcases Three of Boston's Top Developers in
Sep 18, 2018 - NAIOP Event Showcases Three of Boston's Top ...
Northpoint parcel jk development cambridge somerville office lab retail building northpoint common baldwin park
250 North Street in Cambridge
Sep 18, 2018 - Exterior Work Ongoing at 250 North Street in...
145 broadway kendall square office retail space for lease cambridge boston properties mxd development project district pickard chilton stantec rendering
145 Broadway in Cambridge
Sep 18, 2018 - Facade Work Nearing Completion at 145 Broadw...
Harrison albany block south end boston medical center leggat mccall properties multi employer property trust bentall kennedy proposed residential apartments housing retail office development
The Smith South End in Boston
Sep 18, 2018 - Groundbreaking Held for The Smith South End
1690 revere beach parkway everett ma
1690 Revere Beach Parkway in Everett
Sep 17, 2018 - Everett Stop and Shop property acquired for ...
Screen shot 2018 09 16 at 3.31.12 pm
1943 Dorchester Avenue in Boston
Sep 17, 2018 - 1943 Dot Ave looks to welcome first resident...
Screen shot 2018 09 09 at 10.11.30 pm
Market Central in Cambridge
Sep 17, 2018 - Union House @ Market Central Set to Open thi...
1073 1081 massachusetts avenue cambridge ma
1073-1081 Massachusetts Avenue in Cambridge
Sep 14, 2018 - 1073-1081 Massachusetts Avenue has been refi...
500 talbot avenue dorchester ashmont peabody square development housing retail rode architects
500 Talbot Avenue in Boston
Sep 14, 2018 - Small Project Application Filed for 500 Talb...