BLDUP Update 11/01/18

Below are BLDUP's most active* Boston-area new-construction multifamily buildings as of October 2018. All of these buildings are either approved, under construction or recently completed. Each building contains either apartments or condominiums; a number of buildings are mixed-use and contain retail space.

*Most active based on page traffic

 


 

1. The Hub on Causeway

Bulfinch Triangle - Boston

Projected Opening: Late 2018 (Phase One)

The Hub on Causeway is a 1.87 million square foot mixed-use development featuring three towers with retail, office, hotel, and residential uses. The Hub on Causeway will be constructed in three phases. Completion of Phase One of The Hub on Causeway is expected in late 2018. Phase Two will consist of a 38-story residential tower with approximately 440 units and a 10-story citizenM hotel tower with approximately 260 rooms. Phase Three will consist of a 21-story office tower totaling approximately 525,000 square feet. Learn more >>>

 

2. Winthrop Center

Financial District - Boston

Projected Opening: 2022

Upcoming 53-story, 691-foot-tall tower that would replace a decrepit City-owned parking garage located in Winthrop Square in the heart of Downtown Boston. Across the $1.3 billion, 1.592-million-square-foot tower’s top 26 floors would be approximately 500 condominium residences, with approximately 750,000 square feet of commercial office space across 20 floors below. As part of the proposed project, 115,000 square feet of new affordable housing would be created, most likely in Boston’s Chinatown in collaboration with the Asian Community Development Corporation. Learn more >>>

 

3. St. Regis Residences at 150 Seaport

Seaport District - Boston

Projected Opening: 2022

Upcoming 22-story mixed-use waterfront building in Boston's Seaport District. 150 Seaport will contain 124 residential condominiums, 10,700 square feet of ground and second level retail space and three levels of underground parking. 19 condominiums at 150 Seaport will be designated affordable. A Harborwalk extension will be built around the building. 150 Seaport will be built at the present site of the Whiskey Priest and Atlantic Beer Garden waterfront  Learn more >>>

 

4. Fenway Center

Fenway - Boston

Projected Opening: Early 2020

$600 million, 1.1-million-square-foot mixed-use air rights development project in Kenmore Square that will consist of five new buildings, including a 27-story tower, above the Massachusetts Turnpike and on existing surface parking lots. A total of approximately 550 residential units, 160,000 square feet of office space and over 50,000 square feet of retail will be built at Fenway Center, in addition to over 30,000 square feet of park and green space. A seven-story parking garage at Fenway Center will include 1,290 parking spaces. As part of the project, the Yawkey MBTA commuter rail station was recently overhauled, and new public access roads were constructed throughout the existing parking lots. Learn more >>>

 

5. Avalon at Hilltop

Saugus, MA

Projected Opening: Late 2019

Approved mixed-use redevelopment of the 14-acre former Hilltop Steakhouse site located on Route 1 in Saugus. Three new four-story residential buildings will be constructed at the site’s rear containing 280 luxury apartments. Apartments will include 16 studios, 122 one-bedroom and 142 two-bedroom surrounding a landscaped courtyard with a pool, grills, fireplaces and dog parks. 10% of apartments will be designated affordable. Learn more >>>

 

6. Garden Garage

Bulfinch Triangle  - Boston

Projected Opening: Late 2021

The Garden Garage development will consist of the replacement of existing 650-space parking garage with a 44-story, 469-unit residential apartment tower. The tower will include approximately 20,000 square feet of common resident amenities and approximately 2,300 square feet of ground-floor retail space. A new parking garage will be built underground with approximately 830 spaces, increasing parking capacity. Improvements will also be made to surrounding sidewalks and landscaping, increasing existing open space by approximately one acre.  Learn more >>>

 

7. Arsenal Yards

Arsenal Mall - Watertown

Projected Opening: TBD

The approved multi-phased redevelopment and expansion of the former Arsenal Mall in Watertown’s East End. Arsenal Yards will feature 350,000 square feet of retail and entertainment, approximately 425 residences ranging from studios to three-bedrooms, a 145-room Hampton Inn and Suites by Hilton hotel and 100,000 square feet of office space. Retail at Arsenal Yards will include a 30,000 square foot specialty grocer, a cinema with 6-8 limited-seating screens, active entertainment, a combination of boutiques and national retailers, half a dozen chef-driven restaurants and a premium wine superstore.  Learn more >>>

 

8. One Dalton

Back Bay - Boston

Projected Opening: 2019

One Dalton will consist of 712,500 square feet of residential, hotel and retail space. One Dalton's upper floors will contain 180 private luxury condominium residences. Underneath will be a Four Seasons luxury hotel with 215 rooms. Building amenities will include a lap pool, a fitness center, a salon with manicure, pedicure and hair styling services, a private yoga and pilates studio, a golf simulator room with a wet bar and a private theater room, and more. Learn more >>>

 

9. Waterside Place Phase 1B

Seaport District - Boston

Projected Opening: Late 2020

Upcoming 23-story tower featuring 307 apartment residences ranging from studios to three-bedrooms. 62 residences will be "innovation units", and 15 residences will be designated affordable. The tower will include 3,500 square feet of ground-floor retail and a second-floor parking garage with approximately 84 spaces. Waterside Place Phase 1B will be located steps from the MBTA Silver Line, minutes from Downtown Boston. Learn more >>>

 

10. 500 Ocean Ave

Revere Beach - Revere, MA

Projected Opening: Late 2020

Currently, under construction, 500 Ocean Ave is located along Ocean Avenue and fronting Revere Beach, a vibrant public beach facing the Massachusetts Bay. This mixed-use development consists of an apartment building with shared amenities and retail on a 2.4-acre parcel. The parcel is part of the master-planned Waterfront Square district, which will also include hotel and retail programming. The site is adjacent to the Blue Line “T” Wonderland Station and only a fifteen-minute ride to Downtown Boston. Located less than 0.1 miles from Route 1A, the site provides vehicular access to downtown Boston and Logan Airport, and convenient connections to both I-90 and I-93, providing access to major employment areas outside of Boston. Learn more >>>

View BLDUP >>

Search BLDUP

Search BLDUP for news, projects, and companies to find the information that pushes your business forward.

Related News