AC Hotel Boston Downtown
Update
04/13/17
Window installation underway at AC Hotel South End
Window installation is well underway at the new AC Hotel South End, and fireproofing is being installed along the building’s façade. Inside AC Hotel South End, metal framing is being installed to partition individual hotel rooms. Opening later this year, AC Hotel South End will feature 200 guest rooms located adjacent to the Ink Block development. The following are photographs of AC Hotel South End: