Project Progress: Under Construction

75% Complete (success)

About Fenway Center

820 Beacon Street, Fenway, Boston, MA


$600 million, 1.1-million-square-foot mixed-use air rights development project in Kenmore Square that will consist of five new buildings, including a 27-story tower, above the Massachusetts Turnpike and on existing surface parking lots. A total of approximately 550 residential units, 160,000 square feet of office space and over 50,000 square feet of retail will be built at Fenway Center, in addition to over 30,000 square feet of park and green space. A seven-story parking garage at Fenway Center will include 1,290 parking spaces. As part of the project, the Yawkey MBTA commuter rail station was recently overhauled, and new public access roads were constructed throughout the existing parking lots.


Fenway Center will be constructed in two phases. The $240 million Phase 1 will entail two residential buildings (Buildings 1 and 2) of 7 and 13 stories, respectively, containing a total of approximately 339,000 square feet that will be built on existing surface parking lots. Phase I will construct 312 apartments, 37,000 square feet of ground-floor retail and 200 underground parking spaces. A 12,000-square-foot air rights deck and landscaped pedestrian walkway will be constructed over Yawkey Station as part of Phase I. Construction of Phase I is now underway, with completion expected in early 2020.


Phase 2 of Fenway Center will include a 27-story, 375,000-square-foot mixed-use office and residential tower (Building 3) and a 7-story, 111,000-square-foot residential building (Building 4) that will be built on an air rights deck above the Massachusetts Turnpike. All four main buildings at Fenway Center will have ground-floor retail space. Phase 2 will also entail the construction of a 7-story, 274,000-square-foot parking garage (Building 5) on the air rights deck. The following are renderings of Fenway Center:


Fenway Center Renderings


The following is a site plan of Fenway Center, with Phase 2 outlined in red:


Site Plan

Dollar Volume $600,000,000.00
Square Feet 1,300,000
Sector

Retail

Housing

Office

Stories 27
Height (feet) 305
Start Date Dec 08, 2017

Latest Updates


Fenway center phase 1

Aug 14, 2018

Site Work Begins on Phase 1 of the Fenway Center

Read More >>


Fenway center phase i

Dec 10, 2017

Fenway Center secures ground lease and construction financing, groundbreaking planned mid-January

Read More >>


Fenway center one kenmore yawkey mbta commuter rail mixed use residential retail office transit oriented development project meredith management john rosenthal gerding edlen the architectural team rendering

Jul 09, 2017

Fenway Center developers finalizing air rights lease, construction launch expected this Fall

Read More >>


286af9cd 0bc7 40d3 8117 d039e7f639e2

Oct 21, 2016

BPDA approves minor changes to Fenway Center, Phase 1 financing secured

Read More >>


Aerial view from brookline avenue

Sep 18, 2016

Fenway Center moving forward, project changes proposed

Read More >>


Fenway center one kenmore yawkey mbta commuter rail mixed use residential retail office transit oriented development project meredith management john rosenthal gerding edlen the architectural team rendering

Jun 23, 2016

Financing raised to build 313 new residential units at Fenway Center:

Read More >>


Latest Press Releases

Recent Comments

There are no recent comments.

Add Comment