ITK

Catamount Management Corporation At A Glance


PROJECT STATUS
Construction Complete: 2 |
Under Construction: 1 |
Project Approved: 2

WORK BY SECTOR
Housing: 2 |
Retail: 3 |
Parking: 1 |
Restaurant: 1 |
Lab: 2 |
Office: 1 |
Other: 1

PROJECT SIZES
$0 - $10M: 2 | $10M - $100M: 2 | $100M+: 0

Totals

Total Square Footage Free
Total Dollar Volume Free

General

Established 1988

Real estate developer affiliated with dairy company HP Hood LLC

Updates

6 Stack Street
- Jul 01, 2020

Site Mobilization Permit Pulled for Charlestown Project A permit has been pulled for site mobilization for the 6 Stack Street project within Hood Park. Initial work will include site clearing prep for foundation piles along with the setup of construction trailer and fencing. 6 Stack Street will feature around 4,000 square feet of space to include bike storage, retail, and amenity space.


100 Hood Park Drive
- Jan 25, 2020

100 Hood Park Drive Taking Shape The new garage/retail space within the Hood Park Development in Charlestown is taking shape with exterior work nearly complete for the front half of the project. The building will offer parking for over 900 cars plus 50,000 square feet of lab and 24,000 square feet of retail space. The garage will also include a solar array on the rooftop and will be equipped with electric vehicle charging stations in 50 of the parking spaces.


6 Stack Street
- Dec 13, 2019

6 Stack St. Approved by the BPDA 6 Stack Street within the Hood Park Master Plan has been approved by the Boston Planning Board. The one-story, approximately 3,912 square foot building will contain bicycle storage, retail, and amenity space.


6 Stack Street
- Oct 04, 2019

6 Stack Street Under Official Review 6 Stack Street in Charesltown is under official review. The small component of the Hood Park Master Plan will feature a one-story, approximately 3,912 square foot building containing bicycle storage, retail, and amenity space.


The Harvey
- Aug 28, 2019

CO Issued for The Harvey in Charlestown A certificate of occupancy has been issued for The Harvey in Charlestown. The luxury apartment project features 177 rental units along with over 10,000 square feet of ground-floor retail, just steps from Sullivan Square. Resident amenities include an outdoor courtyard with city views, a fitness/yoga studio, a social lounge, and a dog wash station.    


The Harvey
- Jul 09, 2019

Interior Finishing Nearly Complete for The Harvey Interior finishing is wrapping up for Charlestown's newest luxury residential project, The Harvey. The 177 unit project is expected to welcome first residents in mid-August. Units at The Harvey range in size from studios at 475 square feet starting at $2215 per month up to 2 bedroom, 2 bathroom homes featuring over 1,000 square feet of living space renting for over $4,000 per month. Resident amenities include an outdoor courtyard with city views, a fitness/yoga studio, a social lounge, and a dog wash station. The Harvey is targeting LEED Platinum-certifiable.


100 Hood Park Drive
- Jul 05, 2019

Structural Steel Nearly Complete for 100 Hood Park Drive Structural steel work is nearly complete for 100 Hood Park Drive in Charlestown. The project will include 990 parking spaces along with around 75,000 square feet of retail, lab and office space. 100 Hood Park Drive will be the first new parking garage in Charlestown in 30 years. 


The Harvey
- Mar 27, 2019

Facade Install is Underway for The Harvey (and Parts of it are Yellow) Facade install has begun for The Harvey along Rutherford Avenue in the Hood Business Park in Charlestown. The building will be clad in terra-cotta colored rainscreen panels, including a sunny yellow on the interior courtyard facing section of the facade. Architects, CBT designed the building to both emulate the scale and proportion of the existing industrial structures along Rutherford Avenue while serving as a bold and inviting gateway to the revitalized Hood Business Park. The six-story, 177-unit residential building will also feature 10,500 square feet of retail space and parking for 90 cars and 172 bicycles. Construction is expected to be complete later this year.


100 Hood Park Drive
- Mar 25, 2019

Framing Underway for 100 Hood Park Drive Structural framing has started and the concrete core is in place for the upcoming mixed-use project at 100 Hood Park Drive in Charlestown. The new building will house 990 parking spaces along with 75,000 square feet of retail, office, and lab space. 100 Hood Park Drive is part of the 20 acre Hood Park redevelopment, just behind the upcoming luxury apartment building The Harvey, also under construction along Rutherford Avenue.


The Harvey
- Jan 25, 2019

Window Install and Exterior Work Ongoing for The Harvey in Sullivan Square Window installation and exterior work are ongoing for The Harvey along Rutherford Ave. just outside Sullivan Square in Charlestown. This upcoming 177 unit apartment building will also include over 10,000 square feet of ground-floor retail space and parking for 90 cars and 172 bikes. The Harvey is named for Harvey Perly Hood, founder of the H.P. Hood Dairy. This project and several others including 100 Hood Park Drive sit on the site of the former Hood Plant.


100 Hood Park Drive
- Jan 23, 2019

Site Work Underway for 100 Hood Park Drive Initial Site work is underway for the upcoming retail/parking garage property in Hood Park in Charlestown. The building will feature parking for 990 cars along with 75,000 square feet of ground-floor retail space.  The site, formerly a surface parking lot, is located behind 480 Rutherford Avenue, an upcoming 177 unit rental building under construction. 


100 Hood Park Drive
- Oct 30, 2018

Building Permit Issued for Charlestown Development Project A building permit has been issued for the project at 100 Hood Park Drive in Charlestown. The project consists of a 990-car parking garage with approximately 75,000 square feet of ground-floor retail space. The proposed structure would be located at the 20-acre Hood Park development, behind a 177-unit residential apartment building with 10,500 square feet of ground-floor retail currently under construction at 480 Rutherford Avenue, replacing a surface parking lot. Each parking floor would be 60,000 square feet in size. Lab space could be located on the garage's second floor.


No new thoughts. Inquire about becoming a thought leader by clicking here

Average User Rating

Rating Breakdown
1
2
3
4
5