• Jacobs logo

Totals

Total Square Footage 3,037,500
Total Dollar Volume $2,600,000,000.00

General

Established 1947
Website Please click here to verify >>

Proud Member Of:


Jacobs, with annual revenues of nearly $13 billion, is one of the world's largest and most diverse providers of technical, professional, and construction services. Building strong, long-term relationships with our clients is the key to our success as a company. We offer full-spectrum support to industrial, commercial, and government clients across multiple markets.

Updates

Encore Boston Harbor
- Dec 20, 2019

Encore Boston Harbor Refinanced for $1.85 Billion The Encore Boston Harbor casino has been refinanced by Wynn Resorts for $1.85 billion via Deutsche Bank. Encore Boston Harbor is a 34-acre, 3 million square foot five-star casino that opened on June 23rd, 2019 along the Mystic River in Everett. Encore Boston Harbor features a 210,000 square foot gaming facility with approximately 3,200 slot machines and 160 gaming tables. A 24-story, 350-foot tall curved glass tower contains over 600 luxury hotel rooms with a standard room size of over 600 square feet.


Encore Boston Harbor
- Jun 24, 2019

ICYMI Encore Boston Harbor is Now Open In case you had skipped town for a weekend break or may be living under a rock, Encore Boston Harbor is now open. The massive, 3 million square foot project which officially broke ground in early August of 2016 welcomed large crowds on opening day June 23rd. Around 7,400 construction workers helped build the $2.6B project. The Encore features... - 671 guest rooms ranging in size from 650 - 5800 square feet- 210,000 square foot of casino space including 3158 slot machines & 231 table games- 15 restaurants & 5 shops- 50,000 square feet of meeting space- 26,000 square foot spa- Public waterfront park with boat dock


Encore Boston Harbor
- Dec 13, 2018

Marquee in Place for Encore Boston Harbor With an investigation by the Gaming Commission putting the gaming license of the Encore Boston Harbor in question work still continues on the 3 million square foot project. Steve Wynn has filed a lawsuit to block the release of the report, claiming it will violate his privacy rights. Amidst these questions, The Encore marquee has been put in place that will welcome guests this coming June. The $2.5 billion project will feature over 600 luxury hotel rooms along with 210,000sf of gaming area. A public waterfront park is also being constructed along the Mystic River. Along with interior work, road improvement work has also started around the development.  


Encore Boston Harbor
- Oct 11, 2018

Big Night Entertainment Group Confirms Restaurant and Nightclub  Back in March BLDUP reported that a lease had been signed by Big Night Entertainment Group for 15,236 square feet in the Promenade area of Encore Boston Harbor casino and hotel. The New England based entertainment group has formally announced plans for the space within the $2.5 billion casino this week. The group said that the restaurant will be called Mystique, and the nightclub will be called Memoire. The restaurant will feature an Asian-fusion menu and will seat more than 530, including a 94-seat lounge with wraparound bar. The nightclub will overlook the resort’s casino floor and will accommodate up to 600 people. Encore Boston Harbor is set to open in June 2019.


Encore Boston Harbor
- Jun 22, 2018

A Year Away From Encore Boston Harbor OpeningScheduled to open June 2019, construction continues at Encore Boston Harbor. As the project moves along, road improvement work has started in areas around the casino resort including Sullivan Square, Route 99/Broadway, Sweetser Circle and Santilli Circle.The 34-acre, 3 million square foot five-star casino opening June 2019 will feature a 210,000 square foot gaming facility with approximately 3,200 slot machines and 160 gaming tables. A 24-story, 350-foot tall curved glass tower will contain over 600 luxury hotel rooms with a standard room size of over 600 square feet. When complete, the project will transform Everett, surrounding cities, and impact the other casinos across New England.


75 Moulton Street
- Apr 20, 2018

Invesco Acquires 75 Moulton Street in Cambridge Dallas-based Invesco Real Estate has acquired the property at 75 Moulton Street in Cambridge for $17.95 million. The site features a newly renovated 37,500-square-foot lab and R&D building with state of the art lab infrastructure. The building is located within Fresh Pond Technology Park near the Alewife MBTA Red Line station. 


Encore Boston Harbor
- Mar 28, 2018

Big Night Entertainment Group Adds to Growing Portfolio BNEG has committed to lease approximately 15,236 square feet in the Promenade area of Wynn Boston Harbor casino and hotel. The entertainment group, which operates 12 venues in Connecticut (Foxwoods Casino) and Massachusetts is continuing to build off of their success with their most recent Seaport District projects, The Grand and Scorpion Bar.


Encore Boston Harbor
- Mar 20, 2018

Wynn Boston Harbor casino staying on target for 2019Work has begun on the 21st floor of the Everett superstructure casino hotel.  The project, which began in August of 2016, is slated for a completion date of June 2019. In addition to work on the hotel, the state of the art convention center's (above) roof and facade are also nearing completion. The center will rival that of the neighboring Boston Convention and Exhibition Center.Interior installation of specialty curved escalators have also begun in the building. Wynn officials are leaving no detail overlooked as this multi-billion dollar development is the most expensive in the history of Massachusetts.The project timing can be attributed to Touchplan, a construction software that allows developers to plan, impliment, and monitor projects in their entirety.  The innovative software gives developers the ability to see the full spectrum of their project down to every last detail. Touchplan has let developers keep their projects on or ahead of time leading to lower costs and more efficient construction.


Encore Boston Harbor
- Nov 02, 2017

Wynn Boston Harbor casino superstructure nearing full height of 24 stories The $2.4 billion, 3-million-square-foot Wynn Boston Harbor casino in Everett is nearing its’ full height of 24 stories, on schedule for completion of framing by the end of 2017. A three-story steel section of the casino along the Mystic River has topped off, and concrete pouring of the casino’s 24-story tower has reached approximately the 15th floor. The tower will be 350 feet high and house over 600 luxury hotel rooms. Following completion of framing, the casino’s facade will be installed. By the end of 2018, the casino will be sealed and interior finish work will commence. Wynn Boston Harbor is on schedule to open in summer 2019 and will be set over 34 scenic waterfront acres with a 210,000 square foot gaming facility featuring approximately 3,200 slot machines and 160 gaming tables, as well as a 24/7 public waterfront park featuring sweeping views of the Boston skyline. Wynn Boston Harbor will also include retail and restaurant space as well as a spa and health club. The following is a photograph of Wynn Boston Harbor, courtesy Cannistraro:


Encore Boston Harbor
- Jul 23, 2017

Superstructure construction underway at Wynn Boston Harbor casino in Everett Construction of the superstructure of the 24-story Wynn Boston Harbor casino, opening June 2019 over 34 waterfront acres overlooking the Mystic River, is well underway. Multiple tower cranes have been installed throughout the site, and are being used to lift the tower’s multiple structural steel girders for installation along the tower’s frame. Concrete pouring has also begun in order to construct the casino's main 24-story tower. The $2.4 billion, 3-million-square-foot casino has already reached four stories high, with the building’s foundation and 3,000-car underground parking structure complete. The long-contaminated site has been fully cleaned, ending the leaching of contaminants into the Mystic River and allowing for the eventual opening of the waterfront site to the public. The following are aerial drone views of Wynn Boston Harbor: Video Wondering what the view will be like from the top of our Boston resort? We put together this Drone footage to show you. A post shared by Wynn Boston Harbor (@wynnboston) on Jul 15, 2017 at 1:21pm PDT Photo


75 Moulton Street
- Jul 09, 2017

Renovations complete at 75 Moulton lab and R&D building in Alewife, Helical Drilling provides geotechnical design/build solution Renovations are complete at 75 Moulton Street, a newly renovated 37,500-square-foot lab and R&D building in Cambridge located a short distance to Alewife Station and now leasing. Renovation work included reinforcement of the building’s pile-supported foundation and columns in order to support a higher roof load given 75 Moulton Street’s state-of-the-art HVAC, roofing and facade upgrades; Helical Drilling installed high-capacity STELCOR® micropiles, an optimal solution for achieving high axial load capacity in limited access and overhead clearance applications such as existing buildings. STELCOR® micropiles can be efficiently installed with no vibration or spoils, ideal for repositioning of existing buildings. The piles are smaller and more space-efficient than traditional piles, and offer a lower overall cost per kip of support. Helical’s innovative approach was instrumental towards the creation of the state-of-the-art 75 Moulton Street, which features top-quality infrastructure and a sleek new insulated metal panel facade. Lab and R&D space at 75 Moulton Street is now available for lease. The following is a photograph of STELCOR® micropile installation at 75 Moulton Street:


75 Moulton Street
- May 07, 2017

75 Moulton Street, new Alewife lab and R&D space, set for completion this June 75 Moulton Street, a newly renovated 37,500-square-foot lab and R&D building located in Cambridge near Alewife Station, is set for completion this June. Located within Fresh Pond Technology Park, 75 Moulton Street offers a top-quality, well-located, lower-cost alternative to lab and R&D space in Kendall Square and the Seaport District and is now leasing. The Davis Companies, developer of 75 Moulton Street, broke ground in February on Alewife Research Center, a 223,000-square-foot lab and R&D building located across from Alewife Station.


No new thoughts. Inquire about becoming a thought leader by clicking here

Average User Rating

Rating Breakdown
1
2
3
4
5

No Reviews


To unlock, this organization must be verified.

Please click here to verify >>

Projects

75 Moulton Street
Encore Boston Harbor