Totals

Total Square Footage 581,905
Total Dollar Volume $101,335,109.00

General

Established 2001
Website WaypointKLA

WaypointKLA offers comprehensive services to clients in real estate development and construction. The WaypointKL A team applies its expertise in each of the complex phases that make up a successful development project, from the early feasibility, acquisition and conceptual phase through successful construction and close out. Our range of services includes pre-development, site evaluation, permitting, design management, value engineering, procurement of third party construction services, construction management and oversight, due diligence investigations, and inspection/capital needs assessments for existing properties.

Updates

The Speedway
- Apr 23, 2020

The Speedway Secures $1.6M in Historic Tax Credit Funding Twain Financial Partners have invested $1.6 million in federal historic tax credit equity in the adaptive reuse of the Charles River Speedway in Brighton. The project will transform the historic buildings of the site into 17,000 square feet of unique and varied spaces that will become home to a collection of small format retail shops, local artisans and makers, small food purveyors and a full-service restaurant, event space, as well as non-profit and creative office space. All of these uses will surround an 8,000 square foot courtyard with seating and space for public events and programs.


The Speedway
- Mar 10, 2020

Renovations Progressing for The Speedway in Brighton Renovations are quickly progressing for The Speedway along Western Ave. in Brighton. The historic site's deteriorated shingles have been entirely stripped away and are being replaced with new ones made of Eastern white cedar. Elsewhere on the project, interior cleanout and abatement have been completed and the restoration is underway for the building's original windows and doors. Expected to open this summer, The Speedway will feature 17,000 square feet of unique spaces offering a collection of small format retail shops, small food purveyors and a full-service restaurant, event space, as well as non-profit and creative office space. All of these uses will surround an 8,000 square foot courtyard with seating and space for public events and programs. Photo courtesy of Jason Baker


Frost Terrace
- Feb 16, 2020

Various Stages of Construction Ongoing for Frost Terrace Various stages of construction are ongoing across the Frost Terrace site along Mass. Ave. in Cambridge. New windows have been installed in buildings C & D and framing is underway in buildings A, C & D. The affordable housing community will feature 40 affordable apartment residences, including 13 one-bedrooms, 14 two-bedrooms, and 13 three-bedrooms. Amenities at Frost Terrace will include a children’s play and homework area. First units are expected to welcome residents in winter 2020.  


839 Beacon Street
- Feb 04, 2020

CO Issued for 839 Beacon A certificate of occupancy has been issued for the mixed-use project at 839 Beacon Street. The building includes 45 modern apartments along with 4,500 square feet of ground-floor retail space. Communal amenities include a lounge, a meeting room, a fitness center, a dog washing station and a roof terrace featuring a kitchen facility and sweeping Boston skyline views.


455 Harvard Street
- Jan 31, 2020

CO Issued for 455 Harvard in Brookline A temp. certificate of occupancy has been issued for the 17 rental units at 455 Harvard Street near Coolidge Corner in Brookline. Amenities at the project include a fitness center, lobby lounge, bike storage, and garage parking. The building also includes a ground-floor retail space.


455 Harvard Street
- Jan 23, 2020

Permit Pulled for Fire Alarm Install at 455 Harvard St. in Brookline With construction wrapping up a permit has been pulled for the fire alarm install at 455 Harvard St. in Brookline. The mixed-use project features 17 apartments above 1,735 square feet of ground-floor retail space. The project also includes a common roof deck and 12 parking spaces. 


Old Colony Phase III
- Dec 28, 2019

Wood Framing Underway for Old Colony Phase III With concrete cores in place, wood framing has now started for the third phase of the Old Colony redevelopment in South Boston. The project will create 4-new buildings in total to include 301 affordable apartments. All buildings will have townhouse-style direct entry apartments on the first floor. 


Westminster House
- Dec 22, 2019

Wood Framing Ongoing for Westminster House in Roxbury Wood framing is ongoing for the Westminster House along Washington Street in Roxbury. The four-story building will feature 32 affordable apartments along with a licensed childcare center, offices for administrative and service work, and several programming rooms. The new Elizabeth Stone House is expected to open in late summer of 2020. 


The Speedway
- Nov 26, 2019

Construction Underway for Revamp of The Speedway in Brighton After a groundbreaking ceremony last month, construction is underway for the revamp of the Charles River Speedway Headquarters Administration Buildings in Brighton. The Speedway will offer 17,000 square feet of space for small retail shops, a restaurant, events, and non-profit and creative offices. Notch Brewing’s second brewery and taproom will serve as the project's anchor tenant. Construction is expected to be complete in summer 2020.


839 Beacon Street
- Nov 25, 2019

Construction Nearly Complete for 839 Beacon The exterior of 839 Beacon Street has been completed with interior finishing wrapping up When completed this five-story building will feature 45 residential apartments; ground floor retail, and 30 parking spaces. 


455 Harvard Street
- Nov 18, 2019

Construction Nearly Complete at 455 Harvard St: First Units Expected to Open on 12/1 Construction is wrapping up at 455 Harvard Street in Brookline with first units expected to be open on December 1st. The 4-story building features 17 apartments plus just over 1,700 square feet of ground-floor retail space. Units range in size from 1 through 3 bedrooms, including some offering private outdoor space.   


Old Colony Phase III
- Oct 25, 2019

Plumbing Permits Pulled for Old Colony Phase III Two plumbing permits have been pulled by EM Duggan for upcoming new buildings along East 8th Street and Rev. Burke St. in South Boston as part of phase III of the Old Colony redevelopment. The project will replace 250 aging units of public housing with 301 new affordable apartments. 