Flats on Savin
Update
12/04/16
Flats on Savin steel base complete, wood framing begins
The first-story steel base of Flats on Savin is complete, with concrete poured across the top of the base to form the building’s deck. Wood framing of Flats on Savin’s top two stories above the deck is now underway. Flats on Savin’s apartments are anticipated to open in Summer 2017. The following are photographs of Flats on Savin: