Crossroads Industrial Center
Update
11/14/24
Building 2 Nearing Completion at East Tampa Industrial Center
Construction is progressing at Crossroads Industrial Center, building 2 is on track for completion in January 2025. The center will offer 558,000 square feet among five rear-load buildings on both sides of I-75, just south of I-4 in Eastern Hillsborough County. The East Site, 10608 Tanner Road, on the east side of I-75, contains three buildings with 207,000 square feet. Building one is the largest of the three with approximately 122,000 square feet with 30 dock doors, two ramped drive-in doors, and 36 off-dock trailer drops. Building two includes approximately 58,000 square feet, 34 dock doors, 2 ramped drive-in doors, and five off-dock trailer drops. Building three, the smallest building on the East Site, includes 27,000 square feet, 15 dock doors and two ramped drive-in doors. The West Site, 10407 Tanner, will offer two rear load buildings totaling 351,000 square feet located on the west side of I-75. Building one, the larger of the two, includes 180,000 square feet, with 53 dock doors, two ramped drive-in doors, and 12 off-dock trailer drops. Building two includes approximately 171,000 square feet, 53 dock doors, two ramped drive-in doors, and 13 off-dock trailer drops. The center is 10 miles from Port Tampa Bay.
Photo: Cushman & Wakefield