4225 Ponce De Leon
Update
01/22/25
Construction at Mixed-Development in Coral Gables on Track for Q3 2025 Completion
Construction at 4225 Ponce, a mixed-use development in Coral Gables, is progressing smoothly. Masonry block installation is complete for levels 2 through 6, and rough MEP work is advancing. Elevators have arrived, with shaft preparation underway, while windows are on-site and installation is scheduled to wrap up by month’s end. Cooling towers and chillers have been installed on the rooftop, marking another milestone. The eight-story building will bring Class A office space along with ground level retail space. The approximately 85,000-square foot building, located in Coral Gables’ Merrick Park district, will contain 70,000 square feet of Class A office space, 5,900 square feet of ground floor retail space and parking. The building will feature a rooftop restaurant with panoramic views of the city, outdoor terraces on each floor, and a 1,500-square foot lounge.
Photo: Constellation Group