Nautilus 220
Update
10/01/24
Construction Update: Nautilus 220
Construction of Nautilus 220 is nearing completion, all tower cranes have been removed from the site, marking a significant milestone in the project, indicating that the major structural work is finished. The building is transitioning into its interior finish stage.
Additional Updates:
Exterior: Glass railings for the terraces have been installed up to the rooftop deck of the North Tower, 23rd floor for the South Tower, and completed for the Harborside residences. Exterior stucco and painting continue for the North and South Towers.
Residences: Drywall finishing is in the completion process for the North and South Towers. Kitchen and bathroom cabinet installation continues in the North and South Towers. Tile installation is progressing for the bathrooms. Flooring is installed through the 21st floor of the North and South Towers.
Outdoor Amenity Deck: Waterproofing is in the final stages for the entire one-acre deck. The shell of the resort pool is in process. Concrete walkways are in progress.
North Tower Rooftop Deck: Tile is completed in the pool and spa. Waterproofing is nearing completion. Paver installation is in process.
Nautilus 220 will comprise two towers that will rise 24 stories and include 330 two-to-three- bedroom residences in two, 24 story towers ranging from 1,500 to 3,400 square feet. The residences will feature various floor plans, unobstructed water views, and penthouses with 2,000 square feet private rooftop terraces, plunge pools, and summer kitchens. Amenities will include private beach club access, a resort-style pool, wellness plaza, onsite bowling alley, billiard tables, theater, golf and sports simulator, and multipurpose soundproof studio.