Bancroft Lofts
Update
07/21/20
Permit Pulled to Install Pool at Framingham Multifamily Project
A permit has been pulled to install the pool for the upcoming multifamily project at 59 Fountain Street in Framingham. The development includes the renovation of the historic mill building on-site to include 160 residential units plus a new construction building with 100 residences. The existing powerhouse building is also being renovated and will include tenant amenity space.