AVA North Point Update 07/11/18

Phase II Complete at Ava North Point

Callahan Construction Managers has completed construction on Phase II of AVA North Point in Cambridge. The 265 total unit luxury buildings (2), developed by AvalonBay Communities, features a mix of studio, one, two, and three bedroom residences. Resident amenities include a 24hr fitness center, gaming lounge, pool, elevated courtyard, pet spa, and a bike workshop with a unique DIY space.

The distinct apartments exterior was designed by Kyu Sung Woo Architects Inc. with CUBE 3 Studio designing the interior units. Most feature sliding barn doors, gear walls, utility charging stations, and chalkboard walls. In addition, the apartments include stainless steel appliances, granite countertops, in-unit laundry, and are designed for LEED Silver sustainability.

Callahan's work on the six-story, wood framed building also includes 3,000 square-feet of retail space on the ground floor and three levels of underground parking. AVA North Point is ideally situated less than a 5 minute walk from the Lechmere MBTA station and just one mile from Boston.

View AVA North Point >>

Search BLDUP

Search BLDUP for news, projects, and companies to find the information that pushes your business forward.

Related News