A permit for the amount of was issued on 03/13/24 to Ownership.
Permit Details: Scope: In the Sidewalk of 15th Street NE Install 22’ (x 3) Main Line Conduit - WO# 18799219 - Kenny Dantzler - DMS
Permit Details: Scope: In the Sidewalk of 15th Street NE Install 22’ (x 3) Main Line Conduit - WO# 18799219 - Kenny Dantzler - DMS
A permit for the amount of was issued on 02/29/24 to Ownership.
A permit for the amount of was issued on 02/29/24 to Ownership.
A permit for the amount of was issued on 02/29/24 to Ownership.
A permit for the amount of was issued on 02/29/24 to Ownership.
A permit for the amount of was issued on 02/06/24 to Ownership.
A permit for the amount of was issued on 01/22/24 to Ownership.
Permit Details: Plumbing trade Permit
Permit Details: Plumbing trade Permit
A permit for the amount of was issued on 01/19/24 to Ownership.
A permit for the amount of was issued on 01/18/24 to Ownership.
Permit Details: DGS MINER SCHOOL INTERIOR RENOVATIONS AND VESTIBULE ADDITION. NEW ELEVATOR, COVERED WALKWAY AND PLAYGROUND. AREA OF WORK: 21,137 SQ. FT.
Permit Details: DGS MINER SCHOOL INTERIOR RENOVATIONS AND VESTIBULE ADDITION. NEW ELEVATOR, COVERED WALKWAY AND PLAYGROUND. AREA OF WORK: 21,137 SQ. FT.
A permit for the amount of was issued on 10/19/23 to Ownership.
Permit Details: MINER ELEMENTARY SCHOOL - REPLACE TW0 1400 MBH CAST-IRON SECTIONAL BOILERS WITH TWO HIGH-EFFICIENCY CONDENSING BOILERS UPGRADE CONTROLS FOR BOILER TO INTEGRATE INTO BUILDING METASYS AND ENTELIWEB PLATFORMS
Permit Details: MINER ELEMENTARY SCHOOL - REPLACE TW0 1400 MBH CAST-IRON SECTIONAL BOILERS WITH TWO HIGH-EFFICIENCY CONDENSING BOILERS UPGRADE CONTROLS FOR BOILER TO INTEGRATE INTO BUILDING METASYS AND ENTELIWEB PLATFORMS
A permit for the amount of was issued on 06/29/23 to Ownership.
Permit Details: We plan on advancing five environmental soil borings to a depth of approximately 25 feet below ground surface (bgs). The borings will completed utilizing a track mounted geoprobe. Following the completion, the borings will be abandoned utilizing a grout and bentonite slurry mix.
Permit Details: We plan on advancing five environmental soil borings to a depth of approximately 25 feet below ground surface (bgs). The borings will completed utilizing a track mounted geoprobe. Following the completion, the borings will be abandoned utilizing a grout and bentonite slurry mix.
A permit for the amount of was issued on 06/06/23 to Ownership.
Permit Details: DGS OLD MINER SCHOOL INTERIOR DEMO, REMOVAL OF WINDOWS AND ROOF COVERING WITH ROOF STRUCTURE TO REMAIN.
Permit Details: DGS OLD MINER SCHOOL INTERIOR DEMO, REMOVAL OF WINDOWS AND ROOF COVERING WITH ROOF STRUCTURE TO REMAIN.
A permit for the amount of was issued on 06/02/22 to Ownership.
A permit for the amount of was issued on 02/11/22 to Ownership.
A permit for the amount of $6,008.00 was issued on 07/26/18 to Ownership.
Permit Details: The project scope includes demolishing the existing playground equipment and surfacing down to the concrete and installing a new soft playground surface and playground equipment on top of existing concrete surface. There will be no utility work except connecting a proposed water fountain internally to the building. Limits of disturbance is less than 5,000 SF therefore stormwater management will not be required.
Permit Details: The project scope includes demolishing the existing playground equipment and surfacing down to the concrete and installing a new soft playground surface and playground equipment on top of existing concrete surface. There will be no utility work except connecting a proposed water fountain internally to the building. Limits of disturbance is less than 5,000 SF therefore stormwater management will not be required.