Quick Links
Related Documents (9)
A permit for the amount of $1,360.00 was issued on 04/28/22 to Ownership.
Permit Details: Install 2 data and 1 voice
Permit Details: Install 2 data and 1 voice
A permit for the amount of $0.00 was issued on 07/01/20 to Ownership.
Permit Details: This is a no cost permit. Please reference our existing permit # 28955.
Renovate existing spaces includes but limited to new roof top units, controls, sheet metal, exhaust fans and hydraulic heat.
RC Metal will be preforming all sheet metal work.
Permit Details: This is a no cost permit. Please reference our existing permit # 28955.
Renovate existing spaces includes but limited to new roof top units, controls, sheet metal, exhaust fans and hydraulic heat.
RC Metal will be preforming all sheet metal work.
A permit for the amount of $50,000.00 was issued on 12/24/19 to Ownership.
A permit for the amount of $15,850.00 was issued on 09/13/19 to Ownership.
Permit Details: Wiring of new motorized gates (3)
Permit Details: Wiring of new motorized gates (3)
A permit for the amount of $12,487.00 was issued on 09/12/19 to Ownership.
Permit Details: Install monitor modules for main sprinkler room riser devices (6).
Location: 249 Blackstone Blvd. Providence
Permit Details: Install monitor modules for main sprinkler room riser devices (6).
Location: 249 Blackstone Blvd. Providence
A permit for the amount of $33,000.00 was issued on 07/18/19 to Ownership.
Permit Details: Replace failed transformer (Lightning Storm 7-12-19) with temporary transformer. Relocate primary voltage connections to manhole and install temporary jumpers to feed temporary transformer. Review of preliminary short circuit data indicated that available fault current will increase from 23K to 28K and main breakers are rated 35K. Fault current will be reviewed further upon completion of power system study by PE prior to installation of permanent transformer. New transformer with preferred and alternate primary feeder capabilities is currently on order and will be installed in approximately 20 weeks.
RFA POC: Stephen Landry (slandry@rfaudet.com) 401-569-5070
Permit Details: Replace failed transformer (Lightning Storm 7-12-19) with temporary transformer. Relocate primary voltage connections to manhole and install temporary jumpers to feed temporary transformer. Review of preliminary short circuit data indicated that available fault current will increase from 23K to 28K and main breakers are rated 35K. Fault current will be reviewed further upon completion of power system study by PE prior to installation of permanent transformer. New transformer with preferred and alternate primary feeder capabilities is currently on order and will be installed in approximately 20 weeks.
RFA POC: Stephen Landry (slandry@rfaudet.com) 401-569-5070
A permit for the amount of $2,520,000.00 was issued on 01/07/19 to Ownership.
Permit Details: Renovate existing spaces includes but not limited to new roof top units, controls, sheet metal, exhaust fans, hydraulic heat.
(RC Metals will be preforming all Sheet Metal work)
Permit Details: Renovate existing spaces includes but not limited to new roof top units, controls, sheet metal, exhaust fans, hydraulic heat.
(RC Metals will be preforming all Sheet Metal work)
A permit for the amount of was issued on 03/19/18 to Ownership.
A permit for the amount of was issued on 11/20/17 to Ownership.