226 The Strand Overview
Address:
226 The Strand
Contacts (Sign up for PRO to see this --> property's <-- 1 contacts)
Related Projects (6)
View Related Projects With A BASIC Membership
When you upgrade, you get access to all Related Projects.
View Related Projects With A BASIC Membership
When you upgrade, you get access to all Related Projects.
View Related Projects With A BASIC Membership
When you upgrade, you get access to all Related Projects.
View Related Projects With A BASIC Membership
When you upgrade, you get access to all Related Projects.
View Related Projects With A BASIC Membership
When you upgrade, you get access to all Related Projects.
View Related Projects With A BASIC Membership
When you upgrade, you get access to all Related Projects.
Related Documents (2)
PKG202000983
A permit for the amount of $0.00 was issued on 05/19/20 to Ownership.
Permit Details: 225 Strand St-Final roadway restorations for Washington Gas. (16) All metered spaces on the 100 block of the Strand, North of Prince St intersection.
Permit Details: 225 Strand St-Final roadway restorations for Washington Gas. (16) All metered spaces on the 100 block of the Strand, North of Prince St intersection.
BLDC201903106
A permit for the amount of $28,266.00 was issued on 01/29/20 to Ownership.
Permit Details: Setting four mobile trailers in current gravel lot for EYA and Donohoe offices since demolition of 2 Duke St. is set to begin 1/2/20. The trailers are 56'x12' and will each have a skirt, steps and canopy. Two will have bathrooms that drain to a hidden tank underneath the trailer. Each trailer will have a 100amp power service stemmed from our 1600amp temp power service roughly 20' from the southern most trailer. The trailers will be needed until certificate of occupancy is acquired around July/ August 2020.
Permit Details: Setting four mobile trailers in current gravel lot for EYA and Donohoe offices since demolition of 2 Duke St. is set to begin 1/2/20. The trailers are 56'x12' and will each have a skirt, steps and canopy. Two will have bathrooms that drain to a hidden tank underneath the trailer. Each trailer will have a 100amp power service stemmed from our 1600amp temp power service roughly 20' from the southern most trailer. The trailers will be needed until certificate of occupancy is acquired around July/ August 2020.