135 Athens Street
Update
06/14/16
Sheathing installation underway at 135 Athens Street
Installation of moisture resistant sheathing has begun along 135 Athens Street’s superstructure. The four-story building will soon top off. The two-story wooden frame along Athens Street is complete to the building’s roofline, and the concrete elevator core is topped off. The building’s foundation is fully complete.
View from Athens Street
View from Athens Street
Facing West Broadway, 135 Athens Street’s four-story wooden frame is about to top off. Construction of interior framing is well underway.
View from West Broadway
View from West Broadway
A rendering of 135 Athens Street is posted above. More information about 135 Athens Street is posted below.