499 President Street
Update
05/15/24
Facade Installation Progresses for 350 Unit Mixed-Use Project in Gowanus
Brett Steinberg of masonry subcontractor, King Contracting Group NY, has shared progress photos depicting the facade installation progress at 499 President Street; a topped-out, 9-story mixed-use project, going up in Brooklyn's Gowanus neighborhood.
Jointly developed by The Brodsky Organization and Avery Hall, the building will contain apartments. Offering both market-rate units and affordable housing, these will be available in studio, one, and two-bedroom configurations.
Tenant amenities are to include a fitness center with a yoga studio, resident lounges with co-working spaces, private dining accommodations, game rooms, and a roof deck with a swimming pool and seating areas.
In addition to residential space, the development will feature square feet of ground-floor retail space, and an enclosed parking garage, with enough room for vehicles.
Designed by , 499 President Street stands feet tall and totals square feet altogether. The irregularly shaped project site spans square feet. Due to being a partial through-lot, the development will have frontages on President Street, Nevins Street, and Union Street.
The project is set to cost $155 million, and general contractor, , is overseeing its construction at the top level. Work is ultimately expected to finish by February of 2025.