5100 East Diamond Drive Overview

Permitted Construction:

BLDUP Latest Activity

A permit for the amount of $12,500.00 was issued on 03/17/22 to Ownership.

Permit Details: 103-10-092. ALTERNATE SYSTEM FOR FUTURE 3 BEDROOM RESIDENCE. Installation of a new septic tank and Engineered pad treatment and disposal works to service a total of 3-bedroom equivalents with 16 fixture units. Design flow is 450 gallons per day. 5/5 TSS & BOD. System to consist of: 1-1000 Gallon Septic Tanks 15 Eljen B43 Modules 26 CY ASTM C-33 washed sand