About Australian Embassy
1601 Massachusetts Ave. NW, Washington DC
The 220,000-square-foot, six-story building will feature a custom curtain wall system and expansive interior glass atrium, as well as open public spaces, an exhibition gallery, and office and event spaces. The project team will utilize portions of the existing foundation walls as temporary shoring for the excavation of an additional below-grade story.
The chancery will include environmentally-friendly design features such as a green roof, skylight, and extensive photovoltaic array.
Construction is expected to be completed in Q3 2023 with an official opening in Q4 2024.
1601 Massachusetts Avenue Northwest Overview
Contacts (Sign up for PRO to see this --> property's <-- 21 contacts)
Key Data, Images & News
Basic Details
PRO Data
Related Projects (6)
View Related Projects With A BASIC Membership
When you upgrade, you get access to all Related Projects.
View Related Projects With A BASIC Membership
When you upgrade, you get access to all Related Projects.
View Related Projects With A BASIC Membership
When you upgrade, you get access to all Related Projects.
View Related Projects With A BASIC Membership
When you upgrade, you get access to all Related Projects.
View Related Projects With A BASIC Membership
When you upgrade, you get access to all Related Projects.
View Related Projects With A BASIC Membership
When you upgrade, you get access to all Related Projects.
Related Documents (84)
AH2300955
Permit Details: The Clark Construction Team is requesting an after work hours permit for the Australian Embassy Project to proceed with work from 7pm to 11pm on weekdays from 6/30/2023 thru 7/31/23.
AH2300954
Permit Details: The Clark Construction Team is requesting an after work hours permit for the Australian Embassy Project to proceed with work from 7am to 7pm on Sundays from 6/30/2023 thru 7/31/23.
PA391157R7
Permit Details: Install in Massachusetts Ave NW: 1 ea catch basin, 1 ea manhole, 15 in RCP storm lateral, 6 in PVC storm lateral with 2 ea overflow drains. Install in Alley West of property: 3 ea 6 in storm laterals, 1 ea 8 in storm lateral, 4 ea cleanouts. Manhole access for sewer lining operations.
E2310293
M2304137
P2308538
AH2300920
Permit Details: The Clark Construction Team is requesting an after work hours permit for the Australian Embassy Project to proceed with work from 7am to 7pm on Juneteenth National Independence Day on Monday, May 19 2023. Please refer to the attached letter from the ANC commissioner supporting our operation.
PA391157R6
Permit Details: Install in Massachusetts Ave NW: 1 ea catch basin, 1 ea manhole, 15 in RCP storm lateral, 6 in PVC storm lateral with 2 ea overflow drains. Install in Alley West of property: 3 ea 6 in storm laterals, 1 ea 8 in storm lateral, 4 ea cleanouts. Manhole access for sewer lining operations.
AH2300837
Permit Details: Clark Construction is requesting an After-Hours permit for the Australian , after hours application is for Sunday access from 7AM to 7PM the month of June.
AH2300836
Permit Details: Clark Construction is requesting an After-Hours permit for late access from 7PM to 11PM the month of June for Monday through Saturday.
AH2300760
Permit Details: The Clark Construction Team is requesting an after work hours permit for the Australian Embassy Project to proceed with work from 7am to 7pm on Sundays from 4/30/23 thru 5/31/23. Please refer to the attached letter from the ANC commissioner supporting our operation.
AH2300759
Permit Details: The Clark Construction Team is requesting an after work hours permit for the Australian Embassy Project to proceed with work from 7pm to 11pm, Monday thru Friday from 4/30/23 thru 5/31/23. Please refer to the attached letter from the ANC commissioner supporting our operation.
AH2300714
Permit Details: The Clark Construction Team is requesting an after work hours permit for the Australian Embassy Project to proceed with work from 7am to 7pm on Emancipation Day on Monday, April 17 2023. Please refer to the attached letter from the ANC commissioner supporting our operation.
P2305841
Permit Details: Plumbing trade Permit
AH2300664
Permit Details: The Clark Construction Team is requesting an after work hours permit for the Australian Embassy Project to proceed with work from 8am to 7pm on Sundays from 4/1/23 thru 4/30/23. Please refer to the attached letter from the ANC commissioner supporting our operation.
PA391157R5
Permit Details: Install in Massachusetts Ave NW: 1 ea catch basin, 1 ea manhole, 15 in RCP storm lateral, 6 in PVC storm lateral with 2 ea overflow drains. Install in Alley West of property: 3 ea 6 in storm laterals, 1 ea 8 in storm lateral, 4 ea cleanouts. Manhole access for sewer lining operations.
AH2300665
Permit Details: The Clark Construction Team is requesting an after work hours permit for the Australian Embassy Project to proceed with work from 7pm to 11pm, Monday thru Friday from 4/1/23 thru 4/30/23. Please refer to the attached letter from the ANC commissioner supporting our operation.
B2301381
Permit Details: Revision of Approved Permit B1907535. The scope of work for this Permit Amendment is related to a small interior fit-out located on Level 2 of the Australian Embassy. The interior fit-out includes two storage rooms and an area designated as Expansion Space at the northern end of Level 2. The fit-out includes open offices, conference rooms, telecommunication rooms, and supplemental areas for new high security spaces. The scope of work includes updates new interior partitions, new security partitions, and interior finishes. In addition, new mechanical, electrical, fire alarm, fire protection, technology, and security systems are included in the fit-out.
AH2300584
Permit Details: The Clark Construction Team is requesting an after work hours permit for the Australian Embassy Project to proceed with work from 8am to 7pm on Sundays from 3/1/23 thru 3/31/23. Please refer to the attached letter from the ANC commissioner supporting our operation.
AH2300585
Permit Details: The Clark Construction Team is requesting an after work hours permit for the Australian Embassy Project to proceed with work from 7pm to 11pm, Monday thru Friday from 3/1/23 thru 3/31/23. Please refer to the attached letter from the ANC commissioner supporting our operation.
AH2300515
Permit Details: The Clark Construction Team is requesting an after work hours permit for the Australian Embassy Project to proceed with work from 7am to 7pm on Presidents' Day on Monday, February 20 2023. Please refer to the attached letter from the ANC commissioner supporting our operation.
AH2300485
Permit Details: The Clark Construction Team is requesting an after work hours permit for the Australian Embassy Project to proceed with work from 8am to 7pm on Sundays from 2/1/2023 thru 3/1/2023. Please refer to the attached letter from the ANC commissioner supporting our operation.
AH2300484
Permit Details: The Clark Construction Team is requesting an after work hours permit for the Australian Embassy Project to proceed with work from 7pm to 11pm, Monday thru Friday from 2/1/2023 thru 3/1/2023. Please refer to the attached letter from the ANC commissioner supporting our operation.
PA391157R4
Permit Details: Install in Massachusetts Ave NW: 1 ea catch basin, 1 ea manhole, 15 in RCP storm lateral, 6 in PVC storm lateral with 2 ea overflow drains. Install in Alley West of property: 3 ea 6 in storm laterals, 1 ea 8 in storm lateral, 4 ea cleanouts. Manhole access for sewer lining operations.
AH2300400
Permit Details: The Clark Construction Team is requesting an after work hours permit for the Australian Embassy Project to proceed with work from 7am to 7pm on MLK day on Monday, January 16 2023. Please refer to the attached letter from the ANC commissioner supporting our operation.
PA391157R3
Permit Details: Install in Massachusetts Ave NW: 1 ea catch basin, 1 ea manhole, 15 in RCP storm lateral, 6 in PVC storm lateral with 2 ea overflow drains. Install in Alley West of property: 3 ea 6 in storm laterals, 1 ea 8 in storm lateral, 4 ea cleanouts. Manhole access for sewer lining operations.
EN2300090
Permit Details: Install 1 New Elevator - 2100lbs @ 150FPM
AH2300146
Permit Details: Description of Work: The Clark Construction Team is requesting an after work hours permit for the Australian Embassy Project to proceed with work from 7am to 7pm on Veterans' Day on Friday, October 11 2022. Please refer to the attached letter from the ANC commissioner supporting our operation.
PA391157R2
Permit Details: Install in Massachusetts Ave NW: 1 ea catch basin, 1 ea manhole, 15 in RCP storm lateral, 6 in PVC storm lateral with 2 ea overflow drains. Install in Alley West of property: 3 ea 6 in storm laterals, 1 ea 8 in storm lateral, 4 ea cleanouts. Manhole access for sewer lining operations.
AH2300017
Permit Details: The Clark Construction team is requesting an after work hours permit for the Australian Embassy Project to proceed with work from 7am to 7pm on Indigenous Peoples' Day on Monday, October 10 2022. Please refer to the attached letter from the ANC commissioner supporting our operation.
PA375822R6
Permit Details: This is for work on 16th St NW only: 1 ea 3 in domestic water service with meter vault. 1 ea 6 in fire service. 1 ea 6 in sanitary service with 3 cleanouts. 4 in - 14 in storm laterals with 2 cleanouts. 3 ea manholes. .
PA391157R1
Permit Details: Install in Massachusetts Ave NW: 1 ea catch basin, 1 ea manhole, 15 in RCP storm lateral, 6 in PVC storm lateral with 2 ea overflow drains. Install in Alley West of property: 3 ea 6 in storm laterals, 1 ea 8 in storm lateral, 4 ea cleanouts. Manhole access for sewer lining operations.
E2207376
SOL2201319
Permit Details: Sixteenth Street Historic District Installation of a 84.68 kW roof-mount solar PV system, consisting of 232 solar modules.
AH2200910
Permit Details: We are looking to install a protection film on the inside of the windows which needs to be completed after hours due to the amount of work occurring in the areas during the day. There should not be any noise for the neighbors as a result of these operations
P2205599
AH2200797
Permit Details: We are looking to install a protection film on the inside of the windows which needs to be completed after hours due to the amount of work occurring in the areas during the day. There should not be any noise for the neighbors as a result of these operations.
E2205834
SR22SO03562
PA375822R4
Permit Details: This is for work on 16th St NW only: 1 ea 3 in domestic water service with meter vault. 1 ea 6 in fire service. 1 ea 6 in sanitary service with 3 cleanouts. 4 in - 14 in storm laterals with 2 cleanouts. 3 ea manholes. .
SR22SO03194
TPIA22003461
AH2200528
PA375822R3
Permit Details: This is for work on 16th St NW only: 1 ea 3 in domestic water service with meter vault. 1 ea 6 in fire service. 1 ea 6 in sanitary service with 3 cleanouts. 4 in - 14 in storm laterals with 2 cleanouts. 3 ea manholes. .
AH2200425
AH2200407
AH2200334
TC2000034EXT1
MVQ2200241
AH2200237
Permit Details: Request for additional work hours between 7 pm and 3:30 am daily from November 17, 2021 to December 17, 2021. Work during these hours will allow the team to lift steel beams to construct rooftop skylight structures.
PA375822R2
Permit Details: This is for work on 16th St NW only: 1 ea 3 in domestic water service with meter vault. 1 ea 6 in fire service. 1 ea 6 in sanitary service with 3 cleanouts. 4 in - 14 in storm laterals with 2 cleanouts. 3 ea manholes. .
E2200621
PA362702R5
Permit Details: DC APRP 2 & 4 MAIN ABANDONMENT, 1601 MASS AVE NW, Abandon 746' of existing main, p 924063 w 3649450 bca 296965 (14932)
AH2101463
Permit Details: Clark Concrete is requesting an After-Hours work permit for the Australian Embassy Project for material unloading activities to be effective September 20th to October 20th from 5am-7am
PA375822R1
Permit Details: This is for work on 16th St NW only: 1 ea 3 in domestic water service with meter vault. 1 ea 6 in fire service. 1 ea 6 in sanitary service with 3 cleanouts. 4 in - 14 in storm laterals with 2 cleanouts. 3 ea manholes. .
EN2103115
PA362702R4
Permit Details: DC APRP 2 & 4 MAIN ABANDONMENT, 1601 MASS AVE NW, Abandon 746' of existing main, p 924063 w 3649450 bca 296965 (14932)
AH2101303
Permit Details: Night work permit for curtainwall (exterior glass) installation from 5:00pm to 3:00am.
PA362702R3
Permit Details: DC APRP 2 & 4 MAIN ABANDONMENT, 1601 MASS AVE NW, Abandon 746' of existing main, p 924063 w 3649450 bca 296965 (14932)
P2105693
B1907535EXT1
PA362702R2
Permit Details: DC APRP 2 & 4 MAIN ABANDONMENT, 1601 MASS AVE NW, Abandon 746' of existing main, p 924063 w 3649450 bca 296965 (14932)
AH2100826
Permit Details: Please route to Lamont Jackson due to familiarity with previous permits. Clark Concrete is requesting and After-Hours work permit for the Australian Embassy Project to allow Clark Concrete to continue winter concrete operations until 11:59pm Monday to Saturday. The work that would be performed past 7pm would be that of finishing and protecting the concrete due to longer setting times in the winter.
M2101410
AH2100736
Permit Details: Place crane in roadway working from the west curb of 16th Street, closing the to Scott Circle for hoisting materials and equipment to 1601 Mass Ave (Embassy of Australia) between the hours of 4AM to 7PM Saturday and Sunday. in Conjunction with DDOT Public Space Permit # PA 10841238.
AH2100572
AH2100545
AH2100396
Permit Details: Clark Concrete is requesting an After-Hours work permit for the Australian Embassy Project to allow Clark Concrete to continue winter concrete operations until 10pm Monday to Saturday. The work that would be performed past 7pm would only be that of finishing and protecting the concrete.
FA2100341
Permit Details: Install of New Fire Alarm System.
AH2100239
Permit Details: We are requesting after hours permit to pour the mat slab foundation of the Australian Embassy Project. This operation will be performed 4 nights during the month of November in 4 different pours. Due to the size of the foundation, after hours is needed to start the operation at night time. Please refer to the attached letter from the ANC commissioner supporting our operation.
AH2100172
Permit Details: We are requesting after hours permit to pour the mat slab foundation of the Australian Embassy Project. This operation will be performed 4 nights during the month of November in 4 different pours. Due to the size of the foundation, after hours is needed to start the operation at night time. Please refer to the attached approved Mobile crane 2 day work zone permit and Approval letter from the ANC commissioner supporting our operation from 12:00AM-7:00AM In the following days 11/10/2020 & 11/11/2020 11/17/2020 & 11/18/2020 11/24/2020 & 11/25/2020
AH2100147
Permit Details: We are requesting after hours permit to pour the mat slab foundation of the Australian Embassy Project. This operation will be performed 4 nights during the month of November in 4 different pours. Due to the size of the foundation, after hours is needed to start the operation at night time. Please refer to the attached approved Mobile crane work zone permit four our first pour and Approval letter from the ANC commissioner supporting our operation.
AH2001961
Permit Details: An after hours permit is respectfully requested from 5AM Saturday thru 9PM Sunday
TC2000034
Permit Details: To erect and operate a tower crane for the construction of the new Australian Embassy in Washington DC. The tower crane will be used for cast-in-place concrete operations and curtain wall installation among material handling throughout the project.
P2008316
SB2000169
Permit Details: DRILL AND INSTALL 11 DEWATERING WELLS FOR CONSTRUCTION PURPOSES
E2008514
B1907535
Permit Details: NEW CONSTRUCTION Demolish of existing embassy structure will be on a separate RAZE permit and will be replaced with a new structure.
R1900173
Permit Details: TO RAZE A SIX STORY EMBASSY
E2005074
P2004069
SH2000011
Permit Details: Embassy of Australia - Sheeting and shoring and underpinning. 30,300 sf
PA346008
Permit Details: Embassy of Australia - Sheeting and shoring and underpinning. 30,300 sf
PA345468
Permit Details: Water service abandonments: 3 locations behind sidewalk, West side of 16th St NW. Sewer service abandonments: 2 services behind sidewalk, North side of Massachusetts Ave (plug 1 manhole), 2 services in alley (plug 2 manholes).