Overall, plans call for about 970,000 sq. ft. of total development in three buildings. The 16-story, 375,000 sq. ft. north tower will consist of 372 - 387 apartments.
200 Florida Avenue Northeast Overview
Contacts (Sign up for PRO to see this --> property's <-- 16 contacts)
Key Data, Images & News
Basic Details
PRO Data
Related Projects (6)
View Related Projects With A BASIC Membership
When you upgrade, you get access to all Related Projects.
View Related Projects With A BASIC Membership
When you upgrade, you get access to all Related Projects.
View Related Projects With A BASIC Membership
When you upgrade, you get access to all Related Projects.
View Related Projects With A BASIC Membership
When you upgrade, you get access to all Related Projects.
View Related Projects With A BASIC Membership
When you upgrade, you get access to all Related Projects.
View Related Projects With A BASIC Membership
When you upgrade, you get access to all Related Projects.
Related Documents (59)
CO2201336
CO2200936
TPIA22023826
SG2200065
AH2200161
Permit Details: John Moriarty is requesting permission to work on Thursday, November 11 which is Veterans Day. There will be no deliveries to the site and no work in public space.
AH2200057
AH2101472
Permit Details: John Moriarty is requesting permission to perform landscaping installation around the building and the roof on Sundays.
AH2101471
Permit Details: John Moriarty & Associates is requesting permission to run the interior elevator from 6am-7am. The goal is to bring men/women 16 floors up to the roof as well as materials, for work to commence by 7am.
AH2101435
AH2101367
Permit Details: John Moriarty is requesting permission to perform the dismantling of the overhead protection along the Metropolitan Bike Trail (MBT). It is anticipated that the work will take approximately 1 week. However, as a contingency, the time is extended to take in consideration external factors such as weather, preceding activities, and/or other extenuating circumstances. a. Please note the majority of this work was completed in beginning of August but the remaining overhead protection needs to be taken down. In addition, signage will be posted along the trail
AH2101368
Permit Details: John Moriarty is requesting permission to perform metal panel installation on the exterior fa?ade of the building on Sundays. This involves swing usage within the construction site property and the use of drills to install the metal panel pieces. a. This request is to expedite the completion of the fa?ade prior to our final inspection. The noise will be minimal but the sound of intermediate drilling will occur when securing a panel piece
AH2101366
Permit Details: John Moriarty & Associates is requesting permission to run the interior elevator from 6am-7am. The goal is to bring men/women 16 floors up to the roof as well as materials for work to commence by 7am.
B2109374
Permit Details: Permit revision to B1905439: Revision to the Interim Metropolitan Branch Trail Connection required as part of the Washington Gateway PUD at New York and Florida Avenue NE.
SOL2102038
Permit Details: INSTALLATION OF 28.80 KW DC ROOFTOP SOLAR ARRAYS
AH2101239
AH2101238
AH2101213
AH2101006
Permit Details: John Moriarty & Associates is requesting permission to install sprinkler piping inside of the building on Sundays. 4/27/2021 to 5/27/2021 9:00 AM to 5:00 PM on Sundays
AH2101008
Permit Details: John Moriarty & Associates request permission to run the man/material hoist from 6:30-7am. The goal is to bring workers on site 16 floors up to the roof as well as materials, for work to commence by 7am.
AH2101007
Permit Details: John Moriarty & Associates request permission to work from 7-9 pm, 2 days/per week in order to perform sprinkler work inside of the building. This will not cause external noise or encumbrances to the area.
E2106274
AH2100894
Permit Details: John Moriarty and Associates is requesting permission to work on Friday, April 16 which is DC Emancipation Day. There will be no work or deliveries in public space. We would, however, like to receive 2 deliveries on private property.
AH2100893
Permit Details: John Moriarty and Associates is requesting permission to run the man/material hoist from 6:30-7am. The goal is to bring men/women 16 floors up to the roof as well as materials, for work to commence by 7am work start time.
AH2100830
Permit Details: John Moriarty and Associates is requesting permission to work late 2 days/week in order to perform sprinkler work inside of the building. This work will be quiet.
AH2100817
Permit Details: John Moriarty and Associates is requesting permission to install sprinkler piping inside of the building on Sundays.
PA352644R4
Permit Details: Contractor to install 1-8 Inch domestic water service lateral, 1-10 Inch fire service lateral, 12 Inch 50 L.F. of water main, 1-15 Inch storm sewer service lateral with 2 sewer manholes and 1-15 Inch sanitary sewer service lateral with 1 sewer manhole.
AH2100678
Permit Details: After Hours Permit to work through the holiday of President's Day on February 15, 2021 at Washington Gateway Phase 2 Development at 200 Florida Ave NE.
AH2100670
Permit Details: John Moriarty and Associates is requesting permission to work on Monday, February 15 (Presidents Day). There will be no deliveries to the site or work in public space.
AH2100455
Permit Details: John Moriarty and Associates is requesting permission to work concrete finishers on the deck until 10:00 p.m., 2 days per week, due to colder weather.
AH2100454
Permit Details: John Moriarty and Associates is requesting permission to enter the project site at 6:00 a.m. however no work will be performed. The workforce will simply enter the building.
EN2100790
EN2100787
EN2100789
E2102639
TC2000013EXT1
AH2100306
Permit Details: John Moriarty and Associates is requesting permission to enter the project site at 6:00 a.m. however no work will be performed. The workforce will simply enter the building.
AH2100307
Permit Details: John Moriarty and Associates is requesting permission to work concrete finishers on the deck until 10:00 pm, 2 days per week, due to the colder weather.
E2101457
PA352644R2
Permit Details: Contractor to install 1-8 Inch domestic water service lateral, 1-10 Inch fire service lateral, 12 Inch 50 L.F. of water main, 1-15 Inch storm sewer service lateral with 2 sewer manholes and 1-15 Inch sanitary sewer service lateral with 1 sewer manhole.
AH2100065
Permit Details: Contractor to install underground water and sewer service Laterals along Florida Avenue corridor within public space right of way. Under existing excavation construction permit PA352644-R1.
AH2100051
Permit Details: John Moriarty and Associates is requesting permission to work concrete finishers on the deck until 10:00 pm, 2 days per week, due to the colder weather.
AH2100050
Permit Details: John Moriarty and Associates is requesting permission to enter the project site at 6:00 a.m. however no work will be performed. The workforce will simply enter the building.
SP2100005
AH2001893
Permit Details: John Moriarty and Associates is requesting permission to enter the project site at 6:00 a.m. however no work will be performed. The workforce will simply enter the building.
PP2020008279
Permit Details: FOR MINOR CONSTRUCTION WORK AT THE SUBJECT PROPERTY IN ACCORDANCE WITH ALL APPLICABLE PROVISIONS OF THE PHILADELPHIA CODE, ALL REFERENCES CODES AND STANDARDS, AND THE ATTACHED EZ STANDARD, WHERE INCLUDED. DEVIATION FROM THIS STANDARD SHALL RESULT IN PERMIT REVOCATION. A SEPARATE PERMIT FROM THE PHILADELPHIA DEPARTMENT OF STREETS IS REQUIRED FOR ANY SIDEWALK AND STREET CLOSURES. ALL MEANS OF PEDESTRIAN PROTECTION REQUIRED AT THE SITE IN ACCORDANCE WITH THE PHILADELPHIA BUILDING CODE CHAPTER 33 SHALL BE IN PLACE PRIOR TO START OF WORK.
PA352644R1
Permit Details: Contractor to install 1-8 Inch domestic water service lateral, 1-10 Inch fire service lateral, 12 Inch 50 L.F. of water main, 1-15 Inch storm sewer service lateral with 2 sewer manholes and 1-15 Inch sanitary sewer service lateral with 1 sewer manhole.
AH2001849
Permit Details: Contractor to install underground water and sewer service Laterals along Florida Avenue corridor within public space right of way.
SB2000387
Permit Details: We are abandoning 4 gravel packed dewatering wells. All pumps and associated hardware will be removed from the wells. Each well casing will then be removed of perforated. We will then tremie each borehole using a bentonite slurry (two pounds bentonite powder to one gallon water).
AH2001688
Permit Details: Contractor to install underground water and sewer service Laterals along Florida Avenue corridor within public space right of way.
AH2001671
Permit Details: John Moriarty and Associates is requesting permission to install overhead protection at the Metropolitan Bike Trail from 11 PM - 7 AM.
P2007130
AH2001591
Permit Details: John Moriarty and Associates is requesting permission to install overhead protection at the Metropolitan Bike Trail from 11 PM - 7 AM.
M2002787
PA352644
Permit Details: Contractor to install 1-8 Inch domestic water service lateral, 1-10 Inch fire service lateral, 12 Inch 50 L.F. of water main, 1-15 Inch storm sewer service lateral with 2 sewer manholes and 1-15 Inch sanitary sewer service lateral with 1 sewer manhole.
E2004629
P2003331
SB1900400
Permit Details: Furnish and install 11 gravel packed wells (and 6 contingency wells) along the perimeter of the proposed excavation, using a hollow stem auger.
TC2000017
Permit Details: Permit for Baker DC to erect tower crane on private property
B1905439
Permit Details: THIS PROJECT INCLUDES THE CONSTRUCTION OF A NEW 16 STORY NON-SEPARATED, MIXED USE MULTI-FAMILY BUILDING OVER TWO LEVELS OF BELOW GRADE PARKING. AMENITY SPACES ARE PROVIDED ON FLOORS 1 AND 2. ROOF AREA INCLUDES RESIDENTIAL AMENITIES, GREEN ROOF AREAS, AND MECHANICAL EQUIPMENT. A SWIMMING POOL UNSER A SEPARATE PERMIT APPLICATION. PROPOSED GROSS FLOOR AREA: 339,809 SF. 387 DWELLING UNITS.