About Henle Student Village
3700 O STREET NW
The new facility will house 746 students in apartment-style housing, adding 278 beds to Georgetown’s on-campus housing stock, fulfilling the requirement of the university’s Campus Plan to provide additional beds on campus. Henle will be divided into east and west buildings with open, green spaces between the buildings. The residence will also offer 15,000 square feet of student lounges, wellness spaces and study rooms. Construction is expected to run from May 2023 through July 2025, during which time the space formerly occupied by the Georgetown hotel will house approximately 290 students. During the 2022-23 academic year, the space will continue to provide space for students facing public health needs, such as isolation, along with other flexible student residential space.
Construction is expected to run from May 2023 through July 2025.
3700 3700 O Street Northwest Overview
Organizations Working On 3700 3700 O Street Northwest
Contacts (Sign up for PRO to see this --> property's <-- 29 contacts)
Key Data, Images & News
Basic Details
PRO Data
Related Projects (2)
View Related Projects With A BASIC Membership
When you upgrade, you get access to all Related Projects.
View Related Projects With A BASIC Membership
When you upgrade, you get access to all Related Projects.
Related Documents (122)
SB2400161
Permit Details: Historic District / CFA Soil boring for geotechnical exploration
P2404924
P2404850
E2405688
P2404722
E2405689
B2402242
Permit Details: Commission of Fine Arts jurisdiction area Install heat exchanger & piping in LXR Mechanical room.
P2404481
B2400031
Permit Details: Interior alteration to 7,763 sq ft on the lower level to include demolition; construction to include partitions, ceilings, lighting, electrical, mechanical, plumbing, fixtures, and finishes.
E2404402
FB2400037
P2403485
M2401427
E2404160
AN2100160-EXT-1
AN2100160EXT1
BCIV2200134
Permit Details: Georgetown University, Astronomical Observatory / Georgetown University, Healy Hall Georgetown University, Old North In the Commission of Fine Arts jurisdiction area Utility pipe tie-in to existing system and replacement installation to existing buildings.
P2401029
M2400294
Permit Details: Mechanical trade Permit
B2307536
Permit Details: Georgetown Historic District Historic Landmarks on this site: Georgetown University, Astronomical Observatory Georgetown University, Healy Hall Georgetown University, Old North In the Commission of Fine Arts jurisdiction area - 585 SF OF INTERIOR RENOVATION TO INCLUDE REQUIRED MAINTANENCE AND UPGRADES TO EXISITING MECHANICAL SYSTEM IN VILLAGE A BUILDING
B2308454
Permit Details: Georgetown Historic District Historic Landmarks on this site: Georgetown University, Astronomical Observatory Georgetown University, Healy Hall Georgetown University, Old North In the Commission of Fine Arts jurisdiction area DIGITAL WALKTHROUGH REVIEW - 361 SF OF INTERIOR RENOVATION TO INCLUDE REQUIRED MAINTANENCE AND UPGRADES TO EXISITING MECHANICAL SYSTEM IN NEVILS BUILDING
E2400312
E2400090
TC2300026
Permit Details: Commission of Fine Arts jurisdiction area 1 Tower Crane
P2310433
P2310175
E2312068
P2309575
B2305002
Permit Details: Georgetown Historic District Historic Landmarks on this site: Georgetown University, Astronomical Observatory Georgetown University, Healy Hall Georgetown University, Old North In the Commission of Fine Arts jurisdiction area Install two air source heat pump water heaters for exiting dining and residence halls
B2308208
Permit Details: NEW INTERIOR PARTITION AND DOORS IN 6 EXISTING UNITS. 1500 SF
SB2300239
Permit Details: Commission of Fine Arts jurisdiction area Geotechnical exploration for engineering purposes
P2308787
P2308732
E2309966
E2309959
Permit Details: Electrical Trade Permit
E2309829
Permit Details: Electrical Trade Permit
B2301115
Permit Details: Georgetown Historic District Historic Landmarks on this site: Georgetown University, Astronomical Observatory Georgetown University, Healy Hall Georgetown University, Old North In the Commission of Fine Arts jurisdiction area Renovation of the Jewish Student Center, an interior space, withing the Leavey Student Center. Work includes replacing a wall with an operable partition, updating finishes and MEP systems. No exterior work is included in this project. MEP system scope foes does not include rooftop or exterior units.
P2308520
B2301223
Permit Details: In the Georgetown Historic District Historic Landmarks on this site: Georgetown University, Astronomical Observatory Georgetown University, Healy Hall Georgetown University, Old North In the Commission of Fine Arts jurisdiction area interior alteration to 10115SF on the lower level to include construction of partitions, ceilings, lighting, electrical, mechanical, plumbing, floors, fixtures, and finishes
R2300018
Permit Details: 4 - 4 1/2 Story Brick - Student Housing
SB2300207
Permit Details: Georgetown Historic District Historic Landmarks on this site: Georgetown University, Astronomical Observatory Georgetown University, Healy Hall Georgetown University, Old North In the Commission of Fine Arts jurisdiction area Geotechnical exploration for engineering purposes
SH2300038
Permit Details: Georgetown Historic District Historic Landmarks on this site: Georgetown University, Astronomical Observatory Georgetown University, Healy Hall Georgetown University, Old North In the Commission of Fine Arts jurisdiction area Sheeting and shoring for new dormitory. Building Permit submitted under tracking B2301000.
E2308527
B2303083
Permit Details: Georgetown Historic District Historic Landmarks on this site: Georgetown University, Astronomical Observatory Georgetown University, Healy Hall Georgetown University, Old North In the Commission of Fine Arts jurisdiction area Existing tenant alteration to 774,735SF on floors 1-9 and P1-P4 to include demolition; construction to include full replacement of the fire alarm system throughout
B2301000
Permit Details: New construction for a new student dormitory on Georgetown University's campus to replace the existing Henle Village complex. Proposed gross floor area 259,550 square feet. Raze of existing structure under R2300018 DOEE plan 7583 EISF23-00441
P2307065
Permit Details: Plumbing trade Permit
AN2300039
Permit Details: In the Georgetown Historic District Historic Landmarks on this site: Georgetown University, Astronomical Observatory Georgetown University, Healy Hall Georgetown University, Old North In the Commission of Fine Arts jurisdiction area At&t proposes to remove (2) existing UMTS Cabinets, remove (1) rack mounted DC12 unit, remove (5) existing antennas, relocate/replumb (2) RRF units, remove (6) existing 7/8" coax cables, remove (2) existing 8-6 DC trunks, remove (3) existing HR RET cable, remove (2) existing 18 pair fiber trunks, remove (3) ABIL & (1) ASIK existing antennas (2 per sector, 6 total) At&t proposes to install (2) rack mounted DC12 units, install (1) fiber storage box, install (1) new 48VDC battery rack w/ (2) 48VDC 170AH Battery strings, install (1) new rectifiers, install (3) ABIO & (1) ASIL new equipment cards, install (6) new PWRT-606-S DC trunks, install (3) new RFFT-48SM-001 fiber trunks, new battery cabinet DC Circuits: Install (4) 4/0 Telcoflex II Feeds and (4) 4/0 Telcoflex II Returns to be installed from battery cabinet to power plant inside new conduits sized per NEC code, Install (48) "24 feeds 24 returns" 8AWG Telcoflex II from power plant to new DC12 unit to be run in the cable ladder above with fishpaper and wax string, Install (3) new yellow RF caution 2 signs, Install (3) stand-off antenna pipe mounts, install (3) new RF-14192-IR universal fiber management panels, install (3) new RF-SLOFF013-24 Fiber patch panels, Install (1) new Nokia Ferrule
P2306628
B2303267
Permit Details: Interior Alteration to 4,175Sf on the 1st floor to include demolition; construction to include ceilings, lighting, electrical, fixtures and finishes
E2307090
B2304017
Permit Details: Georgetown Historic District Historic Landmarks on this site: Georgetown University, Astronomical Observatory Georgetown University, Healy Hall Georgetown University, Old North In the Commission of Fine Arts jurisdiction area Interior selective renovations of existing office space, a mail room and a classroom on the second floor. Create three (3) new enclosed faculty offices and upgrade classroom 260.
E2306347
M169140
P89794
E2305299
P2304532
E2304958
ER2301208
Permit Details: Repair/replace valve Maxon
AN2100160
Permit Details: The proposed facilities will consists of Verizon Wireless equipment cabinets mounted to a 9'6"x9'6" steel equipment platform. Additionally, Verizon Wireless will be installing a generator to a proposed 7'6"X3'0" steel frame. (15) antennas will be mounted in RF friendly concealed frames on a 81'6" rooftop with a RAD center of 86'6" above grade level for the transmission of Verizon Wireless communications
E2301979
EA2300209
Permit Details: Modernize 1 Hydro Elevator with replacement of jack, controller, power until, hoistway equipment,cab interior, car top, door operator, hall and car fixture.
B2209623
Permit Details: EMR to include Replace existing shunt trip breakers with new heavy duty shunt trip breakers, replace cab light disconnects with heavy duty disconnects, replace lights in E.M.R. and pit with LED, replace pit ladders, replace sump pumps in elevator pits
E2210109
P2208457
B2208708
Permit Details: INTERIOR ALTERATION TO 10,014 SF ON THE LOWER LEVEL & GROUND FLOOR TO INCLUDE DEMOLITION; CONSTRUCTION TO INCLUDE INSTALLATION OF TEMPORARY RAMP, STEPS, AND PLATFORMS, ARCHITECUTRAL PARTITIONS AND REUSE OF EXISTING MEP FOR WARM CORE-AND-SHELL SPACE, STRUCTURAL, MECHANICAL, ELECTRICAL, AND PLUMBING.
P2208260
BCIV2200106
Permit Details: Georgetown University, Astronomical Observatory/Georgetown University, Healy Hall/Georgetown University,/In the Commission of Fine Arts THE WORK PROPOSED HEREIN INCLUDES MAINTENANCE AND REPAIR TO THE EXISTING HIGH PRESSURE STEAM AND CONDENSATE RETURN PIPING LOCATED ACROSS COOPER FIELD ON THE CAMPUS OF GEORGETOWN UNIVERSITY. THE PROJECT SITE IS SITUATED PREDOMINANTLY ON THE ATHLETIC FIELD, NORTH OF NORTH RD BETWEEN TONDORF RD AND WEST RD.
D2200673
Permit Details: Georgetown Historic District / Commission of Fine Arts jurisdiction area Demolition of 149,436SF on the Lower Level to include interior architectural assemblies and associated electrical, HVAC, and plumbing in preparation of new warm core-and-shell space
TPIA22005133
FS2201535
SB2200214
FA2201300
TPSIA22000313
FA2201280
E2204533
FA2201123
E2202501
B2202336
B2202339
EA2102940
TPSIA21000078
P2103511
TPIA21001730
TPIA21001734
TPIA21001735
TPIA21001733
AN2100063
FA2100433
Permit Details: Install new fire alarm system connecting to existing system.
E2101984
P2101553
FS2100429
Permit Details: Modification of an existing wet pipe sprinkler system due to tenant modification
FS2100428
Permit Details: Modification of an existing fire sprinkler system due to tenant modification
P2101256
P2101258
E2101435
D2100039
Permit Details: Healy Hall Interior Demolition limited to non-laod-bearing partition and existing MEP serving the scope of work.
M2100233
P2100631
E1907600EXT1
Permit Details: Original permit expired on 5/20/2020, First extension expires on 11/28/2020
E2100447
FA2003617
Permit Details: The work being done will consist of an interior alteration to upgrade the fire alarm system for Georgetown University Arrupe Hall.
FB2000097
P2009298
E2011492
B2011013
Permit Details: Interior alteration to upgrade existing fire alarm system. Georgetown University Arrupe Hall
E2011236
E2011052
FS2003352
Permit Details: REPLACE EXISTING FIRE PUMP WITH NEW PUMP.ELECTRIC WORK BY OTHERS
B2011014
Permit Details: Interior alteration to upgrade existing fire alarm system. Georgetown University Darnall Hall
P2008181
Permit Details: REPLACING EXISTING FIRE PUMP WITH NEW FIRE PUMP
B2007715
Permit Details: Village C West only. The project entails phased implementation of deferred maintenance upgrades as well as sleeping room and restroom improvements at Village C, Tower 3, 679 bed residence hall located on the main campus with approximately 140,000SF of impacted interior residential living space and 167,000 total GSF of residential space. The scope of work includes finish replacement to lobbies, corridors, common spaces as well as student rooms. Student bathrooms will receive new finishes and new plumbing fixtures. MEP upgrades will include repairs and replacements on an as-needed basis to existing air handlers, lighting, plumbing and fan coil units in common areas as well as sleeping rooms. A summary of these include: • Existing two-pipe cooling and heating distribution system will be converted to a four-pipe system, • New central heating and chilled water pumps will be provided, • All two-pipe fan coil units will be replaced with four-pipe fan coil units and existing ventilation units and restroom exhaust fans will be replaced, • New air devices associated with exhaust air and outside air systems will be provided in existing locations. • Existing outside air and exhaust air duct risers will be cleaned, • Plumbing systems will be upgrades throughout with a new water filling station at the Lobby, • Electrical systems will be upgraded to include new power for new HVAC equipment, • New fire alarm systems.
B2007701
Permit Details: REVISION TO PERMIT B2000173.
EN2003191
Permit Details: Install 1 new Wheelchair Lift Capacity 750LBS Speed 20 FPM
B2010655
Permit Details: BFPE is to replace the faulty fire pump and associated equipment located at Georgetown University - Village C
EX2000072
Permit Details: Potholing amd directional boring along the West Perimeter Road at Georgetown University
P2007865
E2009706
P2007523
MP2020001084
Permit Details: FOR THE INSTALLATION OF AN HVAC MECHANICAL SYSTEM TO INCLUDE HEAT PUMP, AIR DEVISES, DIFFUSERS/REGISTERS/GRILLES, AND ASSOCIATED DUCTWORK. APPLIANCE TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
E2009284
B2008033
Permit Details: RENOVATION OF INTERIOR SPACE WITHIN LEAVEY STUDENT CENTER. RENOVATION TO INCLUDE LIMITED DEMOLITION, MINOR MEP UPGRADES AND NEW DOORS.
B2009280
Permit Details: Conversion of two storage spaces into a single mail sorting facility. The scope within the mail room will include new finishes, updated MEP system and new lighting.