Alan and Amy Meltzer Center for Athletic Performance & Sports Center Annex
Washington DC
Proposed development on the northwest quadrant of the campus (West Campus) will create an athletic, residential, and campus life village, including a new Center for Athletic Performance, consolidated and enhanced student health and wellness facilities, and additional student housing opportunities in competitive and marketable unit configurations to encourage more students to remain on campus during their time at AU, This collection of new development will effectively transform what is now “back of house” and service areas of campus into a vibrant campus destination.
4400 Massachusetts Avenue Northwest Overview
Organizations Working On 4400 Massachusetts Avenue Northwest
Contacts (Sign up for PRO to see this --> property's <-- 39 contacts)
Key Data, Images & News
PRO Data
Related Projects (6)
View Related Projects With A BASIC Membership
When you upgrade, you get access to all Related Projects.
View Related Projects With A BASIC Membership
When you upgrade, you get access to all Related Projects.
View Related Projects With A BASIC Membership
When you upgrade, you get access to all Related Projects.
View Related Projects With A BASIC Membership
When you upgrade, you get access to all Related Projects.
View Related Projects With A BASIC Membership
When you upgrade, you get access to all Related Projects.
View Related Projects With A BASIC Membership
When you upgrade, you get access to all Related Projects.
Related Documents (158)
B2401650
Permit Details: NEW CONSTRUCTION OF 3 STORY ATHLETIC CENTER WITH GYMNASIUM, WELLNESS CENTER, STRENGTH TRAINING, LOCKER ROOMS, AND OFFICES, LOCATED ADJACENT AND CONNECTED TO THE EXISTING BENDER ARENA BY PEDESTRIAN BRIDGE. THE MELTZER CENTER AND SPORTS CENTER ANNEX (SCAN) IS DESIGNED AS A SINGLE BUILDING FROM A CODE STANDPOINT, BUT SEPARATED FROM THE EXISTING BENDER ARENA BY A FIRE WALL. PROPOSED AREA 92,476 SF EISF24-00438
BCIV2300169
Permit Details: American University - Center for Athletic Performance 99,736SF to include demolition and removal of existing tennis courts, basketball courts, sport court, asphalt parking lot(s), concrete walls, ramps, sidewalks, stairs, curbs, gutters, chain link fencing, metal shed, related small structures and grading of the site area for a future building site under separate permit. The work proposed includes new areas of plantings, bioretention, granite curb, concrete sidewalk, alley and apron, asphalt pavement and paths
M2402631
P2406170
B2310993
Permit Details: Dorm room finish upgrades and core renovations.
E2406100
R2300141
Permit Details: 99,736SF TO INCLUDE DEMOLITION AND REMOVAL OF EXISTING TENNIS COURTS, BASKETBALL COURTS, SPORT COURT, ASPHALT PARKING LOT(S), CONCRETE WALLS, RAMPS, SIDEWALKS, STAIRS, CURBS, GUTTERS, CHAIN LINK FENCING, METAL SHED, RELATED SMALL STRUCTURES AND GRADING OF THE SITE AREA FOR A FUTURE BUILDING SITE UNDER SEPARATE PERMIT. THE WORK PROPOSED INCLUDES NEW AREAS OF PLANTINGS, BIORETENTION, GRANITE CURB, CONCRETE SIDEWALK, ALLEY AND APRON, ASPHALT PAVEMENT AND PATHS.
P2404638
P2404446
E2405203
SB2400037
Permit Details: Drilling 85 closed loop geothermal wells at 500 feet each for heating and cooling purposes only.
P2403512
MVQ2400005
Permit Details: Building permit B2401650 In accordance with Section 104.10 of the Construction Codes (Title 12 of the District of Columbia Municipal Regulations (DCMR)), I hereby request approval of the proposed modification of the following section(s) of the Construction Codes as applied to the above-referenced project/permit. [Please identify by specific citation to Title 12 of the DCMR or to the International Codes as applicable.] 2017 DC BUILDING CODE SECTION 712.1.9 TWO STORY OPENINGS 1) Are there specific individual reasons that make the application of the strict letter of the Construction Codes impractical? If YES, Explain: YES, THE SCAN BUILDING CONSISTS OF THREE STORIES PLUS A MEZZANINE LEVEL THAT IS PART OF THE FIRST STORY. STATIR 01 CONNECTS ALL THRE STORIES BUT IS INTENDEND TO BE AN EXIT ACCESS STAIR AND NOT AN ENCLOSED EXIT STAIR. 2) Is the requested modification is in compliance with the intent and purpose of the Construction Codes? If YES, Explain: YES, TO MITIGATE THIS SITUATION AND AVOID CLASSIFICATION AS AN ATRIUM, WE ARE PROPOSING TO PROTECT THE INTERIOR WALLS OF THE OPENING ON LEVEL 3 WITH 1-HOUR FIRE RESISTANACE RATED CONSTRUCTION. 3) Does the requested modification lessen health, accessibility, life and fire safety, or structural requirements? NO. (If YES, Explain)
MVQ2400007
Permit Details: Building permit B2401650 In accordance with Section 104.10 of the Construction Codes (Title 12 of the District of Columbia Municipal Regulations (DCMR)), I hereby request approval of the proposed modification of the following section(s) of the Construction Codes as applied to the above-referenced project/permit. [Please identify by specific citation to Title 12 of the DCMR or to the International Codes as applicable.] 2017 DCMR 12/A 2015 IBC SECTION 2902.2: SEPARATE FACILITIES District of Columbia Municipal Regulations Title 12 (DCMR 12), District of Columbia Construction Codes Supplement of 2017 ? 2015 International Building Code (IBC) as adopted by DCMR 12-A, Building Code Supplement ? 2015 International Plumbing Code (IPC) as adopted by DCMR 12-F, Plumbing Code Supplement ? The specific code section for which this Code Modification Request seeks an alternate method of compliance is IPC 405.3.2. 405.3.2 Public lavatories. In employee and public toilet rooms, the required lavatory shall be located in the same room as the required water closet. 1) Are there specific individual reasons that make the application of the strict letter of the Construction Codes impractical? If YES, Explain: Per DCMR 12A Section 2902.2 separate facilities for separate genders are required for Group A and B occupancies, unless single-occupancy gender-neutral public toilet facilities are provided. Per Section 405.3.2 of International Plumbing Code, all public restrooms are required to have the lavatories located in the same room as the water closets. The public plumbing facilities throughout the building will be grouped, gender-neutral restroom facilities with multiple toilet compartments (full height partitions) and shared lavatories. Since the lavatories are proposed to be adjacent to toilet compartments rather than within the same room as the water closet, a code modification is needed. For maximum flexibility, the principle of the Districts public accommodations law, an in recognition of recent design trends, multiple-occupancy toilet facilities with shared lavatories are being proposed for this building. 2) Is the requested modification is in compliance with the intent and purpose of the Construction Codes? If YES, Explain: The proposed code modification request is commensurate with the prescriptive requirements of the IBC and IPC when considering the following: ? The proposed configuration is reflective of changes in the 2021 editions of the IBC and IPC. The 2021 IPC adds an exception that allows gender-neutral, multi-compartment toilet rooms in lieu of requiring separate facilities for each gender. The exception states that toilets and lavatories must be designed for use by both sexes and privacy for toilets must be installed. The proposed gender-neutral restroom facilities will consist of multiple, single-user toilet compartments and shared lavatories. The toilet compartments consist of floor to ceiling stalls and doors to allow for privacy. ? The 2017 DC Building Code was amended to include a new exception to Section 2902.2 Separate Facilities. It allows the use of gender-neutral facilities that are single-occupancy if proper signage is provided. Although the facilities are multi-occupancy, all signage will reflect the gender-neutral requirements of the 2017 DC Building Code Section 2902.4. ? There are no requirements for lavatories to be private in the codes. Shared lavatories are already permitted in other occupancies in the District. ? Gender-neutral restrooms are becoming more prevalent as they allow for equitable access to all facilities for people of all genders. ? Current design trends in university facilities focus on providing gender inclusion while maintaining privacy and security. 3) Does the requested modification lessen health, accessibility, life and fire safety, or structural requirements? NO. (If YES, Explain)
MVQ2400006
Permit Details: Building permit B2401650 In accordance with Section 104.10 of the Construction Codes (Title 12 of the District of Columbia Municipal Regulations (DCMR)), I hereby request approval of the proposed modification of the following section(s) of the Construction Codes as applied to the above-referenced project/permit. [Please identify by specific citation to Title 12 of the DCMR or to the International Codes as applicable.] 2017 DC BUILDING CODE SECTION 716.5: Opening Protectives in a fire wall. 1) Are there specific individual reasons that make the application of the strict letter of the Construction Codes impractical? If YES, Explain: YES, To our knowledge, there are no existing fire glazing products that carry a 3-hour fire resistance RATING. 2) Is the requested modification is in compliance with the intent and purpose of the Construction Codes? If YES, Explain: YES, We are proposing an alternative protection strategy using sprinklers on both sides of the glazing. This is supported by an ICC tested assembly. 3) Does the requested modification lessen health, accessibility, life and fire safety, or structural requirements? NO. (If YES, Explain)
MVQ2400010
Permit Details: Building permit B2402058 - DINING HALL AT AMERICAN UNIVERSITY'S MARY GRAYDON CENTER. In accordance with Section 104.10 of the Construction Codes (Title 12 of the District of Columbia Municipal Regulations (DCMR)), I hereby request approval of the proposed modification of the following section(s) of the Construction Codes as applied to the above-referenced project/permit. [Please identify by specific citation to Title 12 of the DCMR or to the International Codes as applicable.] DC PLUMBING CODE 2017 SECTION 403.2 SEPARATE FACILITIES: WHERE PLUMBING FIXTURES ARE REQURIED, SEPARATE FACILITIES SHALL BE PROVIDED FOR EACH SEX. 1) Are there specific individual reasons that make the application of the strict letter of the Construction Codes impractical? YES In lieu of sex-segregated bathrooms, American University (the Owner) seeks to provide a group of gender-neutral single-occupant compartments, each with a water closet, and a shared gender-neutral semi-private area with lavatories in order not to discriminate against gender nonconforming occupants. There will also be a single toilet room with its own lavatory. Please see proposed bathroom layout attached. 2) Is the requested modification is in compliance with the intent and purpose of the Construction Codes? YES The intent of the code is to provide privacy for occupants while they perform toilet and activities. Providing a group of gender-neutral compartments, each with a water closet, affords at least the same, if not an increased, level of privacy as providing water closets in sex-segregated toilet rooms. Activates at lavatories, e.g.: washing hands, brushing teeth, etc, do not require the same level of privacy as activities involving water closets. Approval of this request will advance American Universitys goal to increase diversity, equity, and inclusion within the campus facilities.
MVQ2400108
Permit Details: B2400490 In accordance with Section 104.10 of the Construction Codes (Title 12 of the District of Columbia Municipal Regulations (DCMR)), I hereby request approval of the proposed modification of the following section(s) of the Construction Codes as applied to the above-referenced project/permit. [Please identify by specific citation to Title 12 of the DCMR or to the International Codes as applicable.] DC PLUMBING CODE 2017 SECTION 403.2 SEPARATE FACILITIES: WHERE PLUMBING FIXTURES ARE REQURIED, SEPARATE FACILITIES SHALL BE PROVIDED FOR EACH SEX. The owner of this project would like the restroom facilities to be non-discriminatory and inclusive of all genders and identities, and non specifically segregated into female or male spaces. The project occupancy requires a total of 13 water closets and 7 lavatories. The proposes design features 2 multi-occupancy gender-neutral restroom facilities incorporating a total of 13 private toilet stalls (including 3 ADA-compliant stalls) and 9 lavatories in an open area. Additionally, 2 private unisex ADA restrooms are provided on the floor. Per 403.5, gender neutral signage will be provided. 1) Are there specific individual reasons that make the application of the strict letter of the Construction Codes impractical? YES The user group of this facility includes people that do not identify with a particular gender. The proposed restroom design ensures any individual can use the facility regardless of how they self-identify and not face discrimination. 2) Is the requested modification is in compliance with the intent and purpose of the Construction Codes? YES The intend of the code is to provide an adequate number of restroom facilities for the occupancy, and provide individuals with privacy to address their bodily and hygienic needs. The requested modification provides the required number of fixtures per Code and visual and acoustical privacy with each stall. Each toilet stall has floor-to-ceiling walls and solid door with locking hardware.
E2403296
P2402550
Permit Details: Plumbing trade Permit
P2402491
B2401305
Permit Details: Interior renovation of an existing owner-provided space to a dining club at American University's Butler Pavilion 1st floor. Interior fit-out only with no work to the existing building envelope. THE PROJECT CONSISTS OF THE FOLLOWING WORK: LIMITED LOCAL DEMOLITION ONLY AS NEEDED FOR NEW CONSTRUCTION. EXISTING TENANT SPACE (BUILDING ENVELOPE AND TENANT DEMISING WALLS) EXISTING/ MODIFIED ROOF PER NEW HVAC EXISTING/ MODIFIED FIRE PROTECTION EXISTING/NEW ELECTRICAL DISTRIBUTION NEW INTERIOR PARTITIONS AND DOORS NEW FURNITURE/ MILLWORK NEW FINISHES AS SCHEDULED NEW CEILING AS SCHEDULED NEW LIGHTING AS SCHEDULED NEW SPECIALITY EQUIPMENT & CONNECTIONS NEW PLUMBING AND FLOOR PENETRATIONS Area of work: 942 sq. ft.
BP2401097
BP2400993
E2401856
Permit Details: Electrical Trade Permit
M2400653
P2400825
B2309869
Permit Details: American University Sports Center Building. Replace dry pipe sprinkler system piping in tunnel, replace fire pump and controller, replace lighting in tunnel
E2400605
E2400261
MVQ2300083
Permit Details: This project involves the renovation of the facilities at an American University dormitory McDowell Hall. Per section 403.2 of 2015 International Plumbing Code (IPC) requires separate facilities for each sex and per section 403.1.1 to determine the occupant load of each sex, the total load shall be divided in half. We propose to modify the 2015 IPC sections 403.2 and 403.1.1 to the 2021 IPC Section 403.1.1 and Section 403.2 to provide plumbing facilities to serve all genders. See attached for continuation. 1) Are there specific individual reasons that make the application of the strict letter of the Construction Codes impractical? YES Providing facilities that can be used by all genders is consistent with American University policy and recent renovations at the university. 2) Is the requested modification is in compliance with the intent and purpose of the Construction Codes? YES The modification complies with the intent and purpose of the Construction Codes as the number of fixtures will still be based on Table 403.1 of the IPC, but the fixtures will allow use by all genders as allowed in the 2021 IPC. 3) Does the requested modification lessen health, accessibility, life and fire safety, or structural requirements? NO
B2306770
Permit Details: Exterior Alteration to include demolition of 360 feet of existing 7 feet tall iron fence. Installation of a 360 foot long and 15 foot tall acoustical sound barrier
P2310492
P2310427
E2312086
B2308163
Permit Details: Amend permit B2305523 for minor change in layout. No change in occupancy.
E2307862
Permit Details: Electrical Trade Permit
B2306533
Permit Details: Interior alteration to add new restroom facility, 3rd floor. Work is include MEP. No structure changed. use changed
PA416680R1
Permit Details: EXP- REPLACE GAS SERVICE- WR; 3878641 PERMIT; 978985
P2309004
Permit Details: Plumbing trade Permit
E2310455
Permit Details: Electrical Trade Permit
B2305443
Permit Details: interior build-out of existing foodservice concept into new foodservice concept
P2308979
E2310102
P2308649
P2308558
Permit Details: Plumbing trade Permit
E2309865
B2305444
Permit Details: interior renovation of an existing Starbucks. Back of house and restrooms to remain, scope of work is limited to front of house retail area.
E2309105
P2307776
P2307749
P2307787
E2308690
B2305523
Permit Details: Interior alteration of existing restaurant for new tenant. Work is to include Mechanical, electrical, plumbing and Fire. No structural work. 4,459 sq. ft.
SB2300164
Permit Details: Drilling of 1 closed loop geothermal well at 600 ft for heating and cooling purposes only. Air rotary drilling with 8.5" diameter bore to bedrock and 5.5" bore to target depth.
AN2300109
Permit Details: Remove ALL of Clearwire's cell equipment including but no limited too: Antennas, Lines, all associated components (RRHs, TMAs, Splitters), mounting hardware, cable trays, mounting brackets, battery cabinets, transmitting cabinets, h-frames, equipment pad. Restore site to previous conditions excluding normal wear and tear.
E2308252
P2307147
M2303258
BP2302688
BP2302689
B2303605
Permit Details: RENOVATION AND RECONFIGURATON OF ASSEMBLY SPACES ON LOBBY LEVEL AND SHARED LOUNGES AND BATHROOMS ON ALL FLOORS. INTERIOR FINISHES AND LIGHTING UPGRADE IN RESIDENT ROOMS; EXTERIOR RAMPS AND PAVEMENT REPAIRS. OCCUPANT LOAD TO REMAIN THE SAME AS PRIOR TO RENOVATION. LEVEL 1 THRU 8. TOTAL AREA AFFECTED 89,620 SQ. FT.
P2306784
BP2302606
P2306450
E2306971
M2302665
E2306820
P2305868
B2302456
Permit Details: American University - Anderson/Centennial/Letts Building. Implementation of fire alarm Positive Alarm Sequence. Work includes installation of one Local Operating Console at the main entry desk. Update Fire Alarm system in dorm rooms.
EA2301439
Permit Details: Modernization of 1 Hydraulic elevator including replacement of controller, pump unit, fixtures, travel cables and door operators.
P2305156
B2303103
Permit Details: Fire pump and controller replacement.
B2302288
Permit Details: Interior alteration for bookstore. Work is to include MEP and Fire
P2304918
M2302107
P2304749
P2304621
E2305113
P2304446
E2304904
E2304906
E2304905
E2304908
E2304907
E2304909
P2304241
P2304242
P2304197
P2304192
P2304196
P2304195
B2301730
Permit Details: Interior alteration of existing space (bank) for new proposed retail prepackaged food retail shop. Work is to include interior fit out of market, new partitions new ceilings, Mechanical to support new layout, electrical, plumbing and Fire upgrades. 1603 sq. ft.
B2302506
Permit Details: NEW ADA TOILET ROOM AT LETTS HALL
B2302176
Permit Details: NEW ADA TOILET ROOM AT McDOWELL CENTER
B2302509
Permit Details: NEW ADA TOILET ROOMS AT OSBORN BUILDING
B2302181
Permit Details: NEW ADA TOILET ROOM AT HUGHES HALL
B2302505
Permit Details: NEW ADA TOILET ROOMS AT BATTELLE-TOMPKINS
B2302179
Permit Details: NEW ADA TOILET ROOM AT MARY GRAYDON CENTER
ER2300677
Permit Details: Repair and replace items to upgrade WHEELCHAIR lift. Existing Garaventa GSL Artira Lift with new gear box, platform, and call stations
M2300453
BP2300255
EA2300063
Permit Details: Modernization of one Hydraulic elevator, including replacement on pump unit, controller, travel cables, door operator and fixtures.
PP2300203
AN2200139
Permit Details: Verizon Wireless proposes to remove and replace some of its existing equipment on the existing tower. Details of the proposed work are outlined on Sheet C-3 of the provided. The proposed upgrading and modification of the site includes: Removing 12 existing antennas and 9 RRUs, and adding 6 new antennas and 15 new RRUs.
B2207551
Permit Details: AMERICAN UNIVERSITY - INSTALLATION OF THE MARABAR SCULPTURE AT AMERICAN UNIVERSITY. THE PROJECT INCLUDES: CONSTRUCTION OF A FOUNTAIN AND INSTALLATION OF ASSOCIATED UTILITIES THAT TIE INTO THE KOGOD BUILDING BASEMENT MEP SYSTEMS, CONSTRUCTION OF A CONCRETE PAD, INSTALLATION OF FIVE ART DISPLAY (5) BOULDERS AND MINOR SITE GRADING. THE PROJECT DOES NOT INCLUDE ANY WORK IN THE PUBLIC SPACE.
B2209432
Permit Details: DC03XC260 - T-Mobile proposes to remove unused cellular equipment from the rooftop. Equipment to be removed includes: antennas, radios, cable trays, and cabinets. Scope is strictly the removal of unused equipment from the rooftop and equipment room. Cellular equipment owned by others will remain in place.
AN2200026
Permit Details: Attach 3 antennas to existing tower with related ancillary euipment and cables routed back to proposed steel equipment platform to support cabinets at base of tower
AN2200130
Permit Details: Install 1 Dish antenna on existing tele-communications transmission Tower and install ancillary equipment as per plans.
P2207424
E2208531
E2208048
P2206905
E2207797
P2206651
SB2200281
Permit Details: A geoprobe will be used to advance 4 soil borings (EB-7 through EB-10) to the base of the fill material or to a maximum depth of 15 feet, whichever comes first.
B2205389
Permit Details: AMERICAN UNIVERSITY PARKING GARAGE IS AN EXISTING FULL FLOOR PARKING GARAGE. THIS PROJECT IS A CEILING RENOVATION TO ACCOMODATE FOR NEW CEILING GRID AND TILE, RELOCATED LIGHTING FIXTURES, AND NEW SPRINKLER PIPING AND SPRINKLER HEADS.
SB2200261
Permit Details: ECS proposes to perform a subsurface exploration consisting of six soil test borings. The borings will be extended to depths of 50 feet below existing site grades. The borings will be drilled utilizing 3.25-inch hollow stem, continuous flight augers.
P2205581
B2204433
Permit Details: Replacement of existinf fire pump.
22PPDRM00030
P2205021
M2202100
EA2200731
ER2200734
D2200211
Permit Details: Demolition of existing stacks at the Asbury Building
E2200450
B2110613
Permit Details: ***FOR ELEVATOR REVIEW ONLY*** Modernize one (1) elevator and equipment to include new mainline disconnect, new cab light disconnect, new pit ladder, new LED lights in EMR and pit, new GFIs in EMR and pit, new B-label 1.5 hour door, new HVAC in EMR, and new 2-hour partition in EMR.
ER2102925
Permit Details: Repair/ replace hoist ropes on car # 1
B2108705
Permit Details: PROJECT SCOPE SUMMARY Interior renovation within an existing building. Removal of moveable partitions, installation of new interior fixed wall and new interior doors. The project area is approximately 840SF.
B2105948
Permit Details: Revision to B2007325 for modification of American University's campus Chilled Water System. Changes to original permit include reducing the scope of work eliminating previously proposed work at these buildings, Centennial Hall, Letts Hall, McCabe Hall, Leonard Hall, and Hughes Hall. The original scope at Bender Library, McDowell Hall, and Anderson Hall are maintained with slight modifications.
E2107445
P2105882
B2107178
Permit Details: MODERNIZE (1) ELEVATOR AND EQUIPMENT TO INCLUDE: FURNISH AND INSTALL NEW PIT LADDER FOR ELEVATOR PIT 1, INSTALL ONE (1) NEW MAINLINE DISCONNECT, INSTALL ONE (1) NEW 120V HEAVY DUTY DISCONNECT FOR ELEVATOR CAB LIGHT AND FANS, INSTALL NEW 4-FOOT LED LIGHT FIXTURES IN MACHINE ROOM TO REACH 19-FOOT CANDLES, INSTALL THREE (3) LED LIGHTS WITH NEMA 3R ENCLOSURES IN THE ELEVATOR PIT TO REACH 10-FOOT CANDLES, FURNISH AND INSTALL ONE (1) DEDICATED GFCI DUPLEX RECEPTACLE IN EACH ELEVATOR PIT AND EMR, PROVIDE NEW 2 TON DUCTLESS MINI SPLIT SYSTEM HEAT PUMP TYPE IN THE ELEVATOR MACHINE ROOM. INSTALL NEW ELEVATOR MACHINE, GOVERNOR, CONTROLLER, SAFETIES, AND BUFFERS.
P2105411
FS2101853
EA2101832
UP2100058
UP2100057
UP2100063
UP2100060
UP2100059
UP2100056
UP2100062
UP2100061
B2105551
Permit Details: MODERNIZE ELEVATORS AND EQUIPMENT TO INCLUDE: FURNISH AND INSTALL ONE (1) NEW ILLUMINATED LIGHT SWITCH IN THE ELEVATOR MACHINE ROOM AND IN EACH ELEVATOR PIT. INSTALL TWO (2) NEW 120V HEAVY DUTY DISCONNECTS FOR CAB LIGHTING, FURNISH AND INSTALL DUPLEX GFI'S ON DEDICATED CIRCUITS IN THE ELEVATOR MACHINE ROOM, INSTALL TWO (2) NEW HEAVY DUTY ELEVATOR MAINLINE DISCONNECTS, INSTALL THREE (3) 4-FOOT LED LIGHT FIXTURES WITH 3R ENCLOSURES IN EACH ELEVATOR PIT, INSTALL NEW 4-FOOT LED LIGHT FIXTURES IN THE MACHINE ROOM TO MEET CODE COMPLAINCE.
E2104946
B2102214
Permit Details: INTERIOR RENOVATIONS OF EXISTING DORMITORY BUILDING INCLUDING MECHANICAL, PLUMBING AND ELECTRICAL SYSTEM UPGRADES. EXISTING BUILDING USE IS R2-)DORMITORY AND A-3 (LOUNGE) ABOVE S-2 (PARKING)
P2104157
SB2100126
FB2100046
FB2100043
D2100205
P2102651
M2100983
E2103079
B2007325
Permit Details: The proposed work will modify American University's campus Chilled Water System to decrease the quantity of operational chiller plants. This work includes scope in six (6) Dorm Buildings to connect their individual Chilled Water Systems to the Main Campus System. Additionally, A new Chilled Water Plant will replace the existing one in the Campus's Library Penthouse.
P2101708
Permit Details: Replacing a non functional fire pump with new.
B2100802