901 North Capitol Street Northeast Overview

Permitted Construction:
Construction Status:
Sectors:

Organizations Working On 901 North Capitol Street Northeast

Developers:
Architects:

Contacts (Sign up for PRO to see this --> property's <-- 3 contacts)

BLDUP Latest Activity

A permit for the amount of was issued on 04/28/23 to Ownership.

Permit Details: We propose drilling two (2), seven-inch diameter geotechnical test borings (B-1 and B-2) within the private property using the hollow stem auger method to evaluate the subsurface conditions for stormwater management. The proposed test boring depths will be 14 feet. If a confining unit is encountered, outer casing will be installed which will extend 10 feet into the top of the confining unit or to the top of bedrock. Upon completion, the geotechnical test borings will be backfilled with grout to the existing ground surface. The boreholes will be tremie-grouted in one continuous operation with a positive displacement pump using a bentonite slurry mix (at least 2 pounds bentonite powder to 1 gallon of water) from the bottom of the borehole upward. Drilling spoils, including soils and water from the test borings will be containerized in 55-gallon drums to be removed for disposal after chemical laboratory results of the spoils have been received and reviewed. Spoils will be disposed of in accordance with Federal and District laws and regulations.