34 Mayo Road Overview
Contacts (Sign up for PRO to see this --> property's <-- 1 contacts)
BLDUP Latest Activity
Permit Details: * Replacement of the pumps, valves, and HVAC equipment in the building. A small concrete pad will be added next to the building for an AC compressor. * Replacement of the sewage grinder in the wet well (underground concrete vault) attached to the building. * Demolition of the soil odor filters. One of the odor filters will be replaced with a smaller skid-mounted odor control system located on top of the wet well. * The electrical equipment in the building will be replaced by new equipment in a new pre-cast concrete electrical building located where one of the soil filters was. The new building will have a restroom for DPW employees only. * Buried electrical duct bank between the electrical building and the existing pump building. * 200 feet of water main in Mayo Road (MD-253) with a service connection for the SPS. * The new restroom will connect to the existing sewer onsite that flows into the SPS.