6311 Saint John Avenue Overview

Permitted Construction:

Contacts (Sign up for PRO to see this --> property's <-- 2 contacts)

BLDUP Latest Activity

A permit for the amount of $0.00 was issued on 05/02/24 to Ownership.

Permit Details: Since work is on residential street and Contractor has Annual Traffic Control stickers, no traffic control permit is necessary if contractor can complete work within 72 hours while maintaining two-way directional traffic flow. Traffic control and signage complying with Part 6 of MUTCD will still be necessary; however, no traffic control permit is required. If two-way directional traffic flow cannot be maintained, Contractor shall obtain traffic control permit via Compass KC for work in roadway prior to performing excavation work. PERMIT # PW-EXC-2023-04311 EXPIRED - THE WORK IS NOT COMPLETE YET. SPIRE - Main Replacement - KC IP Header Route 6 Phase A2 (RR Crossings) - Spire - Dig 3x5' hole in the pavement/dirt to nstall 440 ft of 6in PL IP main, 595 ft of 6in ST IP main, and 380 ft of 4in ST IP main. Abandon 75 ft of 3in ST IP main, 314 ft of 4in ST IP main, 3567 ft of 6in ST IP main. Service transfers to be installed along the entire route. WO drawing attached MAX TASK 24058199, PROJECT 805029, APPLICATION 75190