A permit for the amount of was issued on 04/09/24 to
Ownership.
Permit Details: NEW ELECTRICAL SYSTEMS AS PER DRAWINGS FILED HEREWITH. TEMPORARY LIGHT AND POWER FOR CONSTRUCTION WILL REQUIRE ENERGIZING A METER(S). TEMPORARY POWER TO CONSTRUCTION HOIST FROM TEMP SERVICE TO PRIMARY SIDE OF TRANSFORMER AND SECONDARY SIDE OF TRANSFORMER TO DISCONNECT.