A permit for the amount of was issued on 11/15/21 to Ownership.

Permit Details: Utility controlled outage required for complete service rebuild upgrade Building Unistrut rack and relocating service from enclosure to rack Upgrading main distribution panel adding new nonbackup loads to panels at the rack Revenue meter Tesla energy gateway subpanel to be located on the rack install Powerwall batteries and Tesla energy gateway Powerwalls combiner panel to be located inside of garage This permit is in addition to Aux permit required for the installation of a 131kW roof mounted PV solar system