Encore Boston Harbor Update 08/05/16

Wynn Boston Harbor construction officially starts


In an official ceremony Thursday (August 4th, 2016), Wynn Resorts marked the start of construction at the $2.1 billion Wynn Boston Harbor casino. Crews have been on site since last week making preparations for commencement of work. Construction officially kicked off with a celebratory blasting of airhorns led by Mayor Carlo DeMaria of Everett and Bob DeSalvio, Senior Vice President of Development at Wynn Resorts:



Wynn Boston Harbor will be a 3 million square foot five-star casino located on a 34-acre site along the Mystic River in Everett. The casino will feature a 210,000 square foot gaming facility with approximately 3,200 slot machines and 160 gaming tables. A 24-story, 350-foot tall curved glass tower will contain over 600 luxury hotel rooms. An underground parking garage with capacity for approximately 3,000 cars will be constructed on site. Wynn Boston Harbor will also include retail and restaurant space. A 24/7 public waterfront park, including a boat dock, with sweeping views of the Boston skyline will be constructed along the Mystic River. Renderings of Wynn Boston Harbor are posted above; the following is a photograph of the Boston skyline as seen from Wynn Boston Harbor:


Wynn-Boston-Harbor-Skyline
View of Boston skyline from Wynn Boston Harbor


Chris Gordon, President of Wynn Design and Development in Massachusetts, gave a rundown of the Wynn Boston Harbor construction timeline during the ceremony; the casino is expected to open in June 2019. Soil excavation by J. Derenzo Companies and slurry wall construction for Wynn Boston Harbor's foundation by Treviicos is currently underway. A rail line located adjacent to the casino site will be used to remove soil from the Wynn Boston Harbor site. A deal for steel procurement will be signed this week; steel frame construction will begin by the end of this year with completion of framing by the end of 2017. By the end of 2018, the casino will be sealed and interior finish work will commence. The following are photographs of soil excavation and slurry wall construction underway, including detailed construction descriptions:


Wynn-Excavation-1
Soil excavation underway


Wynn-Excavation-2
Soil excavation underway


Wynn-Boston-Harbor-3
Freight train along rail line that will be used to remove soil


Wynn-Slurry-Wall-1
Excavators and slurry wall rigs at 34-acre Wynn Boston Harbor site


Wynn-Slurry-Wall-2
Slurry wall grab excavator used to excavate slurry wall trenches


Wynn-Slurry-Wall-3
Slurry wall rig with hydromill excavator used to excavate slurry wall trenches


Wynn-Slurry-Wall-4
Slurry wall rigs


Wynn-Slurry-Wall-5
Slurry wall steel reinforcement cages; these will be lowered into excavated slurry wall trenches, and concrete will be poured inside


Wynn-Slurry-Wall-6
Slurry wall steel reinforcement cages


Wynn-Slurry-Wall-7
Concrete is poured into a 100 foot deep steel reinforcement cage; the cage has been lowered into an excavated slurry wall trench


Wynn-Slurry-Wall-8
Concrete pouring underway


Wynn-Slurry-Wall-10
A concrete mixing transport truck is washed

View Encore Boston Harbor >>

Search BLDUP

Search BLDUP for news, projects, and companies to find the information that pushes your business forward.

Related News