The 105
Update
05/19/21
Plumbing Install Underway for South Boston R&D Project
Cannistraro has pulled a plumbing permit valued at $2,13,0643.00 for install of water and medical piping along with sanitary for The 105 in South Boston. The upcoming 263,500 square foot building is set to be home to CRISPR Therapeutics. Construction is expected to wrap up in Q1 of 2022.