5101 65th Street West Overview
Address:
5101 65Th Street West
Contacts (Sign up for PRO to see this --> property's <-- 3 contacts)
Related Projects (3)
View Related Projects With A BASIC Membership
When you upgrade, you get access to all Related Projects.
View Related Projects With A BASIC Membership
When you upgrade, you get access to all Related Projects.
View Related Projects With A BASIC Membership
When you upgrade, you get access to all Related Projects.
Related Documents (6)
EXTP2405-3055
A permit for the amount of was issued on 05/10/24 to Ownership.
Permit Details: Electrical Distribution Upgrades
Permit Details: Electrical Distribution Upgrades
BLD2403-1468
EXTP24023077
EXTP24023024
A permit for the amount of was issued on 02/06/24 to Ownership.
Permit Details: MANATEE COUNTY Project consists of rpl of medium voltage switchgear into a new climate-controlled room, rpl & reconfiguration of exist substations 1,2, 9,10,11,12 SOUTHWEST WATER RECLAMATION FACILITY
Permit Details: MANATEE COUNTY Project consists of rpl of medium voltage switchgear into a new climate-controlled room, rpl & reconfiguration of exist substations 1,2, 9,10,11,12 SOUTHWEST WATER RECLAMATION FACILITY
BLD24020228
A permit for the amount of was issued on 02/02/24 to Ownership.
Permit Details: SWWRF OIL STORAGE BUILDING
Permit Details: SWWRF OIL STORAGE BUILDING
BLD23101302
A permit for the amount of was issued on 10/11/23 to Ownership.
Permit Details: I. Demolition of existing EQ Return Pump Station, RAS Pump Station, DAF System, Sludge Transfer Pump Station, internal EQ Tank mixing system components, Subnatant Pump Station, yard piping, and electrical cable tray. II. Remove and dispose of accumulated grit within the structures. Remove and dispose of vegetative growth on EQ Tank existing floating cover. Remove and dispose of EQ Tank floating cover. III. Install new floating cover and compressed air mixing system within EQ Tank, and construct new EQ Tank Return PS, metering assembly, and all related structural, mechanical, electrical, instrumentation and control systems.
Permit Details: I. Demolition of existing EQ Return Pump Station, RAS Pump Station, DAF System, Sludge Transfer Pump Station, internal EQ Tank mixing system components, Subnatant Pump Station, yard piping, and electrical cable tray. II. Remove and dispose of accumulated grit within the structures. Remove and dispose of vegetative growth on EQ Tank existing floating cover. Remove and dispose of EQ Tank floating cover. III. Install new floating cover and compressed air mixing system within EQ Tank, and construct new EQ Tank Return PS, metering assembly, and all related structural, mechanical, electrical, instrumentation and control systems.