Broadway Place
Update
06/07/16
Demolition complete, construction begins at 150 West Broadway
Panoramic view of the 150 West Broadway site from West Broadway
Completed excavation at 150 West Broadway
A Soilmec drilling rig is being used to install large diameter concrete piles for structural support. Steel H pile material is on the site and will be driven along the building’s foundation for additional support.
Pile driving underway at 150 West Broadway
Soilmec drilling rig at 150 West Broadway
More information about 150 West Broadway is posted below.