x
BLDUP Views

Every month users get 5 free search page views. In order to get unlimited views upgrade to our FREE or Pro plans.

/ 5 free pages viewed

Sign in
Upgrade
    BLDUP Newsletter

The Peridot Update 09/28/20

Brick Facade Ongoing for Allston Mixed-Use Project

Install of brick, that will cover a portion of the building facade, is ongoing at 392-398 Cambridge Street in Allston. The new building will feature 32 residential units above 5,100 square feet of ground-floor retail space and a 41 car garage. A 17-car surface parking lot will also be built for retail use.

392 cambridge st september

View The Peridot >>

Related News