1725 South Orme Road Overview

Permitted Construction:

BLDUP Latest Activity

A permit for the amount of was issued on 05/24/23 to Ownership.

Permit Details: 402-13-134A. NEW ALTERNATE SEPTIC SYSTEM 2 BEDROOM and RV Connection. Installation of a septic tank and Engineered pad treatment and disposal works to service a total of 2 bedrooms with 16 Fixture Units and an RV connection. Design flow is 450 gallons per day. 5/5 TSS & BOD. System to consist of: 1000- gallon Septic Tank 16 Eljen B43 Modules 55 CY ASTM C-33 washed sand PROVISION: Location of existing onsite wastewater systems to be included on As-Built plans. Bioinhibitors commonly used in RV holding tanks are not consistent with typical sewage and cannot be discharged into the onsite wastewater treatment facility.