1917 Perdido Lane Overview

Permitted Construction:

BLDUP Latest Activity

A permit for the amount of was issued on 07/28/23 to Ownership.

Permit Details: 116-06-122. NEW ALTERNATE SEPTIC SYSTEM - 4 BDRM. Installation of a septic tank, pump and Engineered pad treatment and disposal works to service a total of 4 bedrooms with 28 Fixture Units. Design flow is 600 gallons per day. 5/5 TSS & BOD. System to consist of: 1250- gallon Septic Tank 20 Eljen B43 Modules 21 CY ASTM C-33 washed sand