311 Outer Loop Road Overview

Permitted Construction:

BLDUP Latest Activity

A permit for the amount of was issued on 10/18/23 to Ownership.

Permit Details: NEW SEPTIC SYSTEM - GRACE BAPTIST CHURCH - 3969 GPD. Installation of a septic tank and disposal area. System to serve a Grace Baptist Church with an occupant load of 567 people. Design flow is 3969-gallons per day. 75/150 TSS & BOD. System to consist of: 10,000 gallon septic tank 192 Infiltrator ARC36 High-Capacity Chambers PROVISION: The Performance Assurance Plan and Nitrogen calculation will be submitted with the inspection request. PE will provide a sealed letter stating that the MVS is met. As-built plans will show correct elevations. Discharge Authorization will not be issued until satisfactory submittals are received.