BLDUP | The CRE Database

Permit SB2000486 at 2251 26Th Street Northeast, Washington DC, DC, 20018

Issue Date
09/15/20

Type
Permit

Docnumber
SB2000486

County
Washington

Description

We will complete up to 20 direct-push borings to the first encountered groundwater, which is anticipated at depths between 10 and 20 feet below ground surface. Up to ten of the borings will be advanced an additional five feet for installation of temporary monitoring wells. The borings will be drilled under the direction of our engineer, who will log the borings and obtain soil and groundwater samples. The boreholes will be backfilled with grout per DOEE requirements upon completion and soil c...We will complete up to 20 direct-push borings to the first encountered groundwater, which is anticipated at depths between 10 and 20 feet below ground surface. Up to ten of the borings will be advanced an additional five feet for installation of temporary monitoring wells. The borings will be drilled under the direction of our engineer, who will log the borings and obtain soil and groundwater samples. The boreholes will be backfilled with grout per DOEE requirements upon completion and soil cuttings will be placed in 55-gallon drums for disposal, pending receipt of waste characterization sample results.
Read More >>Read Less <<

Fee
154.0


(6) Related Documents at 2251 26th Street Northeast

To view Related Documents you have to be a FREE BLDUP member.

View All 6 Related Document(s)

Can't Find What You're Looking For?


Browse Other Similar Documents: