8602 Southwest 125th Avenue Overview

Permitted Construction:

BLDUP Latest Activity

A permit for the amount of was issued on 09/08/21 to Ownership.

Permit Details: Construction of an Accessory Dwelling Unit ** needs approved septic for issuance ** FEMA Certified Elevation Certificate or EC is required within 21 calendar days of Construction of the lowest floor elevation. A final EC must be turned into Public Works and the building department before the before a Final Inspection can be scheduled. (ADU21-000033 & PRE21-000654 approved)